TB/T 2075.21-2020.Fittings for overhead contact system in electrification railway-Part 21: Horizontal hang device in tunnels. 1范围 TB/T 2075.21规定了隧道内水平
TB/T 2075.22-2020.Fittings for overhead contact system in electrification railway-Part 22: Prop up and fixed position device in tunnels. 1范围 TB/T 2075
TB/T 2075.23-2020.Fittings for overhead contact system in electrification railway-Part 23: Anchoring compensator in tunnels. 1范围 TB/T 2075.23规定了隧道下锚补偿
TB/T 2075.15-2020.Fittings for overhead contact system in electrification railway-Part 15: Balance weight and balance weight limit frame. 1范围 TB/T 207
TB/T 2075.16-2020.Fittings for overhead contact system in electrification railway-Part 16: Headspan supporting fixtures. 1范围 TB/T 2075.16规定了软横跨支撑固定装置的
TB/T 2075.17-2020.Fittings for overhead contact system in electrification railway-Part 17 : Headspan connection box. 1范围 TB/T 2075.17规定了软横跨连接装置的组成、类型及
TB/T 2075.18-2020.Fittings for overhead contact system in electrification railway-Part 18: Headspan suspension device. 1范围 TB/T 2075.18规定了软横跨悬吊装置的组成、类
TB/T 2075.19-2020.Fittings for overhead contact system in electrification railway-Part 19: Clamp and equipment for connecting earth. 1范围 TB/T 2075.19规
TB/T 2075.10-2020.Fittings for overhead contact system in electrification railway-Part 10: Crossing clamp. 1范围 TB/T 2075.10规定了线岔的类型及标记、技术要求、检验规则、标志与包装
TB/T 2075.11-2020.Fittings for overhead contact system in electrification railway-Part 11: Electric connection device. 1范围 TB/T 2075.11规定了电连接装置的组成、总体要
TB/T 2075.12-2020.Fittings for overhead contact system in electrification railway-Part 12: Pully assembly for tensioning. 1范围 TB/T 2075.12规定了滑轮补偿装置的组成
TB/T 2075.14-2020.Fittings for overhead contact system in electrification railway-Part 14: Spring tensioning device. 1范围 TB/T 2075.14规定了弹簧补偿装置的类型及标记、技
CopyRight 2024 www.bzxz.net All Rights Reserved 湘ICP备2023016450号-1
本网站所展示的内容均由用户自行上传发布,本站仅提供信息存储服务。若您认为其中内容侵犯了您的合法权益,请及时联系我们处理,我们将在核实后尽快删除相关内容。