JB/T 8138.4-1995 Cable accessories test methods Part 4: Pressure seal test
time:
2024-12-04 06:52:07
- JB/T 8138.4-1995
- Abolished
Standard ID:
JB/T 8138.4-1995
Standard Name:
Cable accessories test methods Part 4: Pressure seal test
Chinese Name:
电缆附件试验方法 第4 部分: 压力密封试验
Standard category:
Machinery Industry Standard (JB)
-
Date of Release:
1995-10-10 -
Date of Implementation:
1995-10-10 -
Date of Expiration:
2003-06-01
China Standard Classification Number:
Electrical Engineering>>Electrical Materials and General Parts>>K13 Cables and Accessories
alternative situation:
The original standard number is GB 5589.4-1985; replaced by GB/T 18889-2002Procurement status:
IEEE SLD48-1975 NEQ
Skip to download
Summary:
JB/T 8138.4-1995 Cable accessories test methods Part 4: Pressure seal test JB/T8138.4-1995 standard download decompression password: www.bzxz.net
Some standard content:
Mechanical Industry Standard of the People's Republic of China
JB/T8138.4-1995
Test Methods for Cable Accessories
Part 4: Pressure Sealing Test
1995-10-10 Issued
Ministry of Machinery Industry of the People's Republic of China
1995-10-10 Implementation
Mechanical Industry Standard of the People's Republic of China
Test Methods for Cable Accessories,
Part 4: Pressure Sealing Test
Scope of Application
JB/T8138.4-1995
This test method is applicable to the determination of the pressure sealing performance of cable joint boxes and terminal boxes using liquid or gas as the pressure transmission medium.
2 Test Equipment
The wiring diagram of the test system is shown in Figure 1.
2.1 Water pump or oil pump
The working pressure shall not be less than 9.8MPa.
2.2 Liquid pressure gauge
The maximum range is 9.8MPa, and the error does not exceed ±2%. 2.3 Air compressor or carbon dioxide cylinder, nitrogen cylinder 2.4 Gas pressure gauge
The maximum range is 5.88MPa, and the error does not exceed ±2%. 2.5 Pressure transmission medium
Should not have a corrosive effect on the sample. The viscosity of the liquid medium at 25°C should not be greater than 26cSt. 2.6 Pressure introduction component
The pressure is introduced from the cable inlet of the sample (as shown in Figure 2). For samples with rubber press-fit seals, the outer diameter of the pressure introduction component should be equal to the outer diameter of the cable.
2.7 The test system
Should have reliable sealing performance.
a, Hydraulic test wiring
Figure 1 Test system wiring diagram
Approved by the Ministry of Machinery Industry on October 10, 1995
Implemented on October 10, 1995
JB/T 8138.4-1995
b. Air pressure test wiring
Continued Figure 1
Figure 2 Schematic diagram of the structure of the pressure introduction componentwww.bzxz.net
a-For lead seal samples, M is the same size as the terminal box inlet sleeve, b-For rubber press-fit seal samples, M is equal to the outer diameter of the cable 3 Sample preparation
The finished sample should be installed with all the accessories. 3.2 The box body sample should be installed with additional accessories dedicated to the sealing test. 3.3 One end of the cable joint box should be sealed with a solid rod. The outer diameter of the solid rod should be equal to the outer diameter of the pressure introduction component. 4 Test steps
4.1 Connect the test pipeline according to Figure 1 and meet the following requirements: a. For hydraulic seal test, first fill the prepared sample with liquid medium, install the pressure introduction components, and apply chalk powder to the sealing joints of the sample and the surface of the casting. b. For air pressure seal test, the sample should be completely immersed in water after the test pipeline is connected. 4.2 Steadily increase the pressure to the specified value of the product standard, then close the valve and keep it for the specified time of the product standard. 4.3 Observe the pressure change of the pressure gauge. The gauge pressure is allowed to fluctuate within the range of ± 5% of the specified value. If it exceeds this range, the pressure should be increased or decreased to keep the test pressure within the specified range. 4.4 Observe the sample:
Hydraulic seal test: whether the surface is wet. Air pressure seal test: whether there are bubbles discharged and the location of the bubble discharge. 4.5 At the end of the test, open the valve first to reduce the gauge pressure to zero, and then remove the sample. 2
Test results and calculations
JB/T8138.4-1995
There should be no leakage or air leakage within the specified test pressure and duration. Notes
Explosion-proof safety measures must be taken for air pressure sealing tests. Additional notes:
This standard is proposed by the Ministry of Machinery Industry of the People's Republic of China. This standard is under the jurisdiction of the Shanghai Cable Research Institute of the Ministry of Machinery Industry. This standard was drafted by the Shanghai Cable Research Institute of the Ministry of Machinery Industry and others. The person in charge of drafting this standard is Ge Guangming.
People's Republic of China
Mechanical Industry Standard
Test methods for cable accessories
Part 4: Pressure sealing test
JB/T 8138.4-1995
Published and distributed by the China Academy of Mechanical Science
Printed by the China Academy of Mechanical Science
(No. 2 Shouti South Road, Beijing
Format 880×1230
Postal code 100044)
Sheet X/X
Number of words XXX,XXX
Edition X, XX, 19XX
Printing X, XX, 19XX
Number of copies 1-XXX
Price XXX.XX Yuan
Serial number XX-XXxX
Mechanical Industry Standard Service Network: http://www.JB.ac.cn66188
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
JB/T8138.4-1995
Test Methods for Cable Accessories
Part 4: Pressure Sealing Test
1995-10-10 Issued
Ministry of Machinery Industry of the People's Republic of China
1995-10-10 Implementation
Mechanical Industry Standard of the People's Republic of China
Test Methods for Cable Accessories,
Part 4: Pressure Sealing Test
Scope of Application
JB/T8138.4-1995
This test method is applicable to the determination of the pressure sealing performance of cable joint boxes and terminal boxes using liquid or gas as the pressure transmission medium.
2 Test Equipment
The wiring diagram of the test system is shown in Figure 1.
2.1 Water pump or oil pump
The working pressure shall not be less than 9.8MPa.
2.2 Liquid pressure gauge
The maximum range is 9.8MPa, and the error does not exceed ±2%. 2.3 Air compressor or carbon dioxide cylinder, nitrogen cylinder 2.4 Gas pressure gauge
The maximum range is 5.88MPa, and the error does not exceed ±2%. 2.5 Pressure transmission medium
Should not have a corrosive effect on the sample. The viscosity of the liquid medium at 25°C should not be greater than 26cSt. 2.6 Pressure introduction component
The pressure is introduced from the cable inlet of the sample (as shown in Figure 2). For samples with rubber press-fit seals, the outer diameter of the pressure introduction component should be equal to the outer diameter of the cable.
2.7 The test system
Should have reliable sealing performance.
a, Hydraulic test wiring
Figure 1 Test system wiring diagram
Approved by the Ministry of Machinery Industry on October 10, 1995
Implemented on October 10, 1995
JB/T 8138.4-1995
b. Air pressure test wiring
Continued Figure 1
Figure 2 Schematic diagram of the structure of the pressure introduction componentwww.bzxz.net
a-For lead seal samples, M is the same size as the terminal box inlet sleeve, b-For rubber press-fit seal samples, M is equal to the outer diameter of the cable 3 Sample preparation
The finished sample should be installed with all the accessories. 3.2 The box body sample should be installed with additional accessories dedicated to the sealing test. 3.3 One end of the cable joint box should be sealed with a solid rod. The outer diameter of the solid rod should be equal to the outer diameter of the pressure introduction component. 4 Test steps
4.1 Connect the test pipeline according to Figure 1 and meet the following requirements: a. For hydraulic seal test, first fill the prepared sample with liquid medium, install the pressure introduction components, and apply chalk powder to the sealing joints of the sample and the surface of the casting. b. For air pressure seal test, the sample should be completely immersed in water after the test pipeline is connected. 4.2 Steadily increase the pressure to the specified value of the product standard, then close the valve and keep it for the specified time of the product standard. 4.3 Observe the pressure change of the pressure gauge. The gauge pressure is allowed to fluctuate within the range of ± 5% of the specified value. If it exceeds this range, the pressure should be increased or decreased to keep the test pressure within the specified range. 4.4 Observe the sample:
Hydraulic seal test: whether the surface is wet. Air pressure seal test: whether there are bubbles discharged and the location of the bubble discharge. 4.5 At the end of the test, open the valve first to reduce the gauge pressure to zero, and then remove the sample. 2
Test results and calculations
JB/T8138.4-1995
There should be no leakage or air leakage within the specified test pressure and duration. Notes
Explosion-proof safety measures must be taken for air pressure sealing tests. Additional notes:
This standard is proposed by the Ministry of Machinery Industry of the People's Republic of China. This standard is under the jurisdiction of the Shanghai Cable Research Institute of the Ministry of Machinery Industry. This standard was drafted by the Shanghai Cable Research Institute of the Ministry of Machinery Industry and others. The person in charge of drafting this standard is Ge Guangming.
People's Republic of China
Mechanical Industry Standard
Test methods for cable accessories
Part 4: Pressure sealing test
JB/T 8138.4-1995
Published and distributed by the China Academy of Mechanical Science
Printed by the China Academy of Mechanical Science
(No. 2 Shouti South Road, Beijing
Format 880×1230
Postal code 100044)
Sheet X/X
Number of words XXX,XXX
Edition X, XX, 19XX
Printing X, XX, 19XX
Number of copies 1-XXX
Price XXX.XX Yuan
Serial number XX-XXxX
Mechanical Industry Standard Service Network: http://www.JB.ac.cn66188
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 6300-1992 Voltage transformer for control
- GB/T 20501.1-2006 Guidance system for public information―Design principles and requirements of guidance elements―Part 1: Graphical signs and relative elements
- MT 716-2005 Technical conditions for acceptance of steel wire ropes for important purposes in coal mines
- JJG 2044-1989 Measuring Instrumentsfor γ-Ray Exposure
- JB/T 2001.43-1999 Two-valve distributor for water system (PN=20, 31.5MPa)
- JB/T 9954-1999 Cleanliness of hydraulic system of forging machinery
- HG/T 3091-2000 Rubber seals Specification for interface sealing ring materials for water supply, drainage and sewage pipes
- GB/T 9065.1-1988 Hydraulic hose connector connection dimensions flared type
- JB/T 5824.2-1991 Classification of products for special equipment for wires and cables
- HG/T 20704.9-2000 Format and compilation instructions for data sheets for pump equipment
- JB/T 8008.5-1999 Quick-change washers for machine tool fixture parts and components
- GB/T 4772.1-1999 Dimensions and output power classes of rotating electrical machines Part 1: Frame sizes 56 to 400 and flange sizes 55 to 1 080
- GB/T 5158.4-2001 Determination of total oxygen content of metal powders - Reduction-extraction method
- JB/T 1843-1999 Types and basic parameters of die forging hammers
- GB/T 11741-1989 Standard method for the hygienic examination of carbon disulfide in the atmosphere of residential areas - Gas chromatography
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:wymp4wang@gmail.com