HG/T 20519.12-1992 Hose station layout
time:
2024-11-04 02:13:37
- HG/T 20519.12-1992
- in force
Standard ID:
HG/T 20519.12-1992
Standard Name:
Hose station layout
Chinese Name:
软管站布置图
Standard category:
Chemical industry standards (HG)
-
Date of Release:
1993-01-18 -
Date of Implementation:
1993-04-01
Standard ICS number:
General, Terminology, Standardization, Documentation>>Technical Drawing>>01.100.01 Technical Drawing General 71.010China Standard Classification Number:
>>>>G0 Engineering Construction>>Raw Materials Industry, Communications, Broadcasting Engineering>>P72 Petrochemical, Chemical Engineering

Skip to download
Summary:
HG/T 20519.12-1992 Hose station layout HG/T20519.12-1992 standard download decompression password: www.bzxz.net

Some standard content:
Hose station layout diagram
HG20519.12-92
1The hose station for cleaning and other miscellaneous purposes is composed of industrial water, nitrogen, compressed air, steam and other hose interface groups. 2 According to the requirements of the public engineering system flow chart, the hose stations for steam, water, air, and nitrogen are assembled on the operating platform or on the ground.
3Hose station representation method:
Hose station
4The location of the hose station is determined by the person in charge of pipeline design and marked on the copy of the equipment layout drawing. If it needs to be changed for some reason, the designer must propose it to the person in charge of pipeline design. 5The hose joints of the hose station are preferably arranged at a height of 1.2 meters on the operating platform or on the ground. 6The minimum diameter of the steam pipe of the hose station is DN20, and the valve is a stop valve; the minimum diameter of other pipes such as water, air, and nitrogen is DN25, and the valve is a gate valve.
7The hose station connection port of the vertical container should not be arranged outside the platform. For the sake of aesthetics and rationality and easy support, these connecting pipe ports should be arranged between the vertical container and its platform, and the hose connection port itself should be directly installed on the vertical pipe (see the figure below). It should be noted that the hose connection pipe on the tower does not hinder the opening and rotation of the manhole cover. 8The figure below is a typical hose station, where the air and steam branches are led out from the upper part of the main pipe, and the water pipe and nitrogen pipe are led out from the side of the main pipe. When designing, it can be made into a hose station with four, three, two or one pipes according to needs. In order to facilitate the establishment of pipe racks, hose stations are often located at columns.
DN20 stop valve
DN20 pipe
DN20 stop valve
DN20 hose connector
DN20 pipe
DN20 stop valve
DN20 gate valve
DN20 hose connector
Typical hose station
9 List a table above the title bar of the hose station plan layout, and the contents of the table header are as follows:
HS-501
HS-201
HS-101
Hose station number
Note: "V"bzxz.net
Indicates that this hose station is composed of these media. J
For the specific drawing method of the hose station layout diagram, see the example figure. And as one of the design documents, send it to the construction site. 10 car
hose station number is written in
see example figure
/P2058
contact "O"
RS-1OD
middle v850
contact \N"
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
HG20519.12-92
1The hose station for cleaning and other miscellaneous purposes is composed of industrial water, nitrogen, compressed air, steam and other hose interface groups. 2 According to the requirements of the public engineering system flow chart, the hose stations for steam, water, air, and nitrogen are assembled on the operating platform or on the ground.
3Hose station representation method:
Hose station
4The location of the hose station is determined by the person in charge of pipeline design and marked on the copy of the equipment layout drawing. If it needs to be changed for some reason, the designer must propose it to the person in charge of pipeline design. 5The hose joints of the hose station are preferably arranged at a height of 1.2 meters on the operating platform or on the ground. 6The minimum diameter of the steam pipe of the hose station is DN20, and the valve is a stop valve; the minimum diameter of other pipes such as water, air, and nitrogen is DN25, and the valve is a gate valve.
7The hose station connection port of the vertical container should not be arranged outside the platform. For the sake of aesthetics and rationality and easy support, these connecting pipe ports should be arranged between the vertical container and its platform, and the hose connection port itself should be directly installed on the vertical pipe (see the figure below). It should be noted that the hose connection pipe on the tower does not hinder the opening and rotation of the manhole cover. 8The figure below is a typical hose station, where the air and steam branches are led out from the upper part of the main pipe, and the water pipe and nitrogen pipe are led out from the side of the main pipe. When designing, it can be made into a hose station with four, three, two or one pipes according to needs. In order to facilitate the establishment of pipe racks, hose stations are often located at columns.
DN20 stop valve
DN20 pipe
DN20 stop valve
DN20 hose connector
DN20 pipe
DN20 stop valve
DN20 gate valve
DN20 hose connector
Typical hose station
9 List a table above the title bar of the hose station plan layout, and the contents of the table header are as follows:
HS-501
HS-201
HS-101
Hose station number
Note: "V"bzxz.net
Indicates that this hose station is composed of these media. J
For the specific drawing method of the hose station layout diagram, see the example figure. And as one of the design documents, send it to the construction site. 10 car
hose station number is written in
see example figure
/P2058
contact "O"
RS-1OD
middle v850
contact \N"
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB 50162-1992 Road Engineering Drawing Standard
- JG/T 3064-1999 Steel Fiber Concrete
- JB/T 9694-1999 General technical requirements for sulfur hexafluoride circuit breakers
- SY/T 0076-1993 Natural gas dehydration design specification
- GB/T 8646-1998 Semiconductor bonding aluminum-1% silicon filaments
- JG 3046-1998 Cold rolled twisted steel bar JG3046-1998
- GB 8816-1988 Food additive isomerized lactose solution
- JJG 315-1983 Verification Regulation of DC Digital Voltmeter
- GB/T 14816-1993 General technical requirements for three-phase asynchronous motors for submersible oil wells
- JB/T 9016.1-1999 Suspension conveyor traction detachable chain
- GB/T 15674-1995 Determination of crude fat content of edible fungi
- JB/T 5272-1991 Y series (IP23) three-phase asynchronous motor technical conditions (frame number 315~355)
- GB/T 15117-1994 Copper alloy die castings
- GA/T 989-2012 Information security technology—Security technical requirements for security management products of electronic documents
- SL 299-2004 Regulations for geological surveying and mapping of water conservancy and hydropower projects
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com