JB/T 10397-2004 Acceptance specification for off-grid wind turbine generator sets
time:
2024-08-11 22:16:00
- JB/T 10397-2004
- in force
Standard ID:
JB/T 10397-2004
Standard Name:
Acceptance specification for off-grid wind turbine generator sets
Chinese Name:
离网型风力发电机组验收规范
Standard category:
Machinery Industry Standard (JB)
-
Date of Release:
2004-02-10 -
Date of Implementation:
2004-06-01
Standard ICS number:
Energy and Heat Transfer Engineering >> 27.180 Wind Power Generation Systems and OtherChina Standard Classification Number:
Energy, Nuclear Technology>>Energy>>F11 Wind Energy
publishing house:
Mechanical Industry PressISBN:
15111.7269Publication date:
2004-05-30
Drafter:
Shi Rongzhi, Zhang Dongguang, Shi YanhaiDrafting Organization:
Shangdu Animal Husbandry Machinery Co., Ltd.Focal point Organization:
National Wind Machinery Standardization CommitteeProposing Organization:
China Machinery Industry FederationPublishing Department:
National Development and Reform Commission of the People's Republic of China

Skip to download
Summary:
This standard specifies the acceptance method and requirements for off-grid wind turbines. This standard applies to the inspection and acceptance of off-grid wind turbines with a rotor swept area of less than 40 square meters. JB/T 10397-2004 Off-grid Wind Turbine Acceptance Specification JB/T10397-2004 Standard download decompression password: www.bzxz.net

Some standard content:
1C:S 27.150
Machinery Industry Standard of the People's Republic of China
JB/T10397—2004
Off-grid Wind Turbine Generator System
Acceptance Specification
Testing regulations for off-grid wind turbine generator system2004-02-10 IssuedbZxz.net
2004-06-01 Implementation
National Development and Reform Commission of the People's Republic of China Issued before the market
Normative reference documents
3 Terms and definitions
4 Acceptance method requirements
11 General provisions.
Acceptance of components
Anti-intelligence acceptance
JR/T 10397—2004
JU/r10397—2004
This standard is formulated for the first time.
This standard is compiled according to the requirements of G1.1—2000 Standardization Work Guidelines Part 1: Specifications for the Preparation of Standards
This standard is proposed by China Machinery Industry Association. The parent association of this standard is China Wind Turbine Standardization Technical Committee. The drafting unit of this standard is Shangdu Jiaogang Co., Ltd. The main drafters of this standard are Shi Chaizhi, Zhang Dongguang, Shi Yanhai. 1 Scope
Off-grid wind turbine generator set acceptance specification
This standard specifies the inspection and correction methods and requirements for off-grid wind turbine generator sets. JB/T-0397—2304
This standard is applicable to the inspection and acceptance of off-grid wind turbine generator sets (hereinafter referred to as units) with a rotor sweep area of less than 40m2. 2 Normative reference documents
The following documents have become clauses of this standard through reference in this standard. All referenced documents with a date of expiration: The revised version (excluding the revised version) or revised version is not applicable to this standard. However, the parties reached or agreed upon based on this standard are encouraged to study whether the latest version of this document can be used. For all referenced documents without a date of expiration, the latest version shall apply to this standard. JB/T7878—1995 Wind turbine technology
3 Terms and definitions
Terms and definitions specified in JB/7878 apply to this standard. 4 Acceptance methods and requirements
4.1 General
Acceptance process After the acceptance of each component, the power supply status of the entire unit is checked to see whether its various indicators meet the design and use requirements.
4.2 Acceptance of each component of the unit
4.2.1 Wind turbine
2) Check the model and specifications of the wind turbine generator according to the design documents to see whether they are correct: 6) Appearance of the wind turbine generator and tower:
|) Check the base of the wind turbine generator.
d) Check the cable and anchor:
e) Check the cable specifications:
Check the connection with its own equipment (controller, inverter, battery, etc.):
|Check whether the power generation is normal under the current power conditions: 1! When the wind turbine is generating electricity, is it running enough? i: The noise level of the wind turbine is in compliance with the standard. 4.2.2 Battery pack
a! Check the model and specifications of the battery pack against the unit design documents. b) Check the appearance of the battery pack: whether there is acid, opening, or missing parts. d) Check whether the connection of the required batteries is correct and reliable. d) Check whether all the lead cables meet the design requirements. 3) Check whether the ventilation and insulation of the battery room are good: whether the battery has been pre-processed before use. 4.2.3 Controller, inverter
) Check the external equipment
b) Check whether the wiring is correct:
JB/T10397—2004
Check whether the opening and closing are normal:
Mountain: Check whether the instrument display is positive:
) Check the insulation and insulation:
4.3 Unit acceptance
4.3.1 Preparation before acceptance
Before acceptance, the acceptance form and acceptance steps should be prepared to speed up the acceptance. 412 Acceptance
4.3.2.1 Acceptance before operation
) Check all line connections to ensure that the wiring is correct: b) Check whether all guards are connected.
4.3.2.2 Operation acceptance
a) Check all electrical equipment;
) The power transmission part must be open-circuited first, and after confirmation, it can be connected to other parts;
4.3.3 Result processing
4.331 After the acceptance is completed, an acceptance report must be prepared, recording the test results and data in detail, and confirming that the unit is correct and safe before it can be handed over to the user.
4.332 If problems are found during the acceptance, such as incorrect line connection, functional failure or abnormal operation, the problems or problems should be recorded in detail and the relevant departments should be investigated and coordinated.
4.5.3.3 The department responsible for any changes in unit components and equipment should promptly eliminate the faults or replace the effective components, and then inspect the equipment again. After confirming that there are no problems, the relevant department should be notified for re-inspection.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Machinery Industry Standard of the People's Republic of China
JB/T10397—2004
Off-grid Wind Turbine Generator System
Acceptance Specification
Testing regulations for off-grid wind turbine generator system2004-02-10 IssuedbZxz.net
2004-06-01 Implementation
National Development and Reform Commission of the People's Republic of China Issued before the market
Normative reference documents
3 Terms and definitions
4 Acceptance method requirements
11 General provisions.
Acceptance of components
Anti-intelligence acceptance
JR/T 10397—2004
JU/r10397—2004
This standard is formulated for the first time.
This standard is compiled according to the requirements of G1.1—2000 Standardization Work Guidelines Part 1: Specifications for the Preparation of Standards
This standard is proposed by China Machinery Industry Association. The parent association of this standard is China Wind Turbine Standardization Technical Committee. The drafting unit of this standard is Shangdu Jiaogang Co., Ltd. The main drafters of this standard are Shi Chaizhi, Zhang Dongguang, Shi Yanhai. 1 Scope
Off-grid wind turbine generator set acceptance specification
This standard specifies the inspection and correction methods and requirements for off-grid wind turbine generator sets. JB/T-0397—2304
This standard is applicable to the inspection and acceptance of off-grid wind turbine generator sets (hereinafter referred to as units) with a rotor sweep area of less than 40m2. 2 Normative reference documents
The following documents have become clauses of this standard through reference in this standard. All referenced documents with a date of expiration: The revised version (excluding the revised version) or revised version is not applicable to this standard. However, the parties reached or agreed upon based on this standard are encouraged to study whether the latest version of this document can be used. For all referenced documents without a date of expiration, the latest version shall apply to this standard. JB/T7878—1995 Wind turbine technology
3 Terms and definitions
Terms and definitions specified in JB/7878 apply to this standard. 4 Acceptance methods and requirements
4.1 General
Acceptance process After the acceptance of each component, the power supply status of the entire unit is checked to see whether its various indicators meet the design and use requirements.
4.2 Acceptance of each component of the unit
4.2.1 Wind turbine
2) Check the model and specifications of the wind turbine generator according to the design documents to see whether they are correct: 6) Appearance of the wind turbine generator and tower:
|) Check the base of the wind turbine generator.
d) Check the cable and anchor:
e) Check the cable specifications:
Check the connection with its own equipment (controller, inverter, battery, etc.):
|Check whether the power generation is normal under the current power conditions: 1! When the wind turbine is generating electricity, is it running enough? i: The noise level of the wind turbine is in compliance with the standard. 4.2.2 Battery pack
a! Check the model and specifications of the battery pack against the unit design documents. b) Check the appearance of the battery pack: whether there is acid, opening, or missing parts. d) Check whether the connection of the required batteries is correct and reliable. d) Check whether all the lead cables meet the design requirements. 3) Check whether the ventilation and insulation of the battery room are good: whether the battery has been pre-processed before use. 4.2.3 Controller, inverter
) Check the external equipment
b) Check whether the wiring is correct:
JB/T10397—2004
Check whether the opening and closing are normal:
Mountain: Check whether the instrument display is positive:
) Check the insulation and insulation:
4.3 Unit acceptance
4.3.1 Preparation before acceptance
Before acceptance, the acceptance form and acceptance steps should be prepared to speed up the acceptance. 412 Acceptance
4.3.2.1 Acceptance before operation
) Check all line connections to ensure that the wiring is correct: b) Check whether all guards are connected.
4.3.2.2 Operation acceptance
a) Check all electrical equipment;
) The power transmission part must be open-circuited first, and after confirmation, it can be connected to other parts;
4.3.3 Result processing
4.331 After the acceptance is completed, an acceptance report must be prepared, recording the test results and data in detail, and confirming that the unit is correct and safe before it can be handed over to the user.
4.332 If problems are found during the acceptance, such as incorrect line connection, functional failure or abnormal operation, the problems or problems should be recorded in detail and the relevant departments should be investigated and coordinated.
4.5.3.3 The department responsible for any changes in unit components and equipment should promptly eliminate the faults or replace the effective components, and then inspect the equipment again. After confirming that there are no problems, the relevant department should be notified for re-inspection.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 2001.22-1999 Types and dimensions of pressure gauge switches for water systems (PN=31.5MPa)
- QB 2582-2003 酵母抽提物
- YC/T 37.1-2002 Determination of physical properties of filter rods Part 1: Length electro-optical method
- GB 30000.20-2013 Rules for classification and labelling of chemicals—Part 20:Serious eye damage/eye irritation
- GB/T 3939.5-2004 Naming and marking of main fishing gear materials - Sinkers
- GB/T 5305-1985 Packaging, marking, transportation and storage of hand tools
- SY 6350-1998 Safety technical specification for multi-stage automatic safety initiators for oil and gas well perforation
- GB 18555-2001 Occupational exposure limits for high frequency electromagnetic fields in the workplace
- QB/T 2368-1998 Frame stretch dryer
- QB/T 2175.1-1995 General technical requirements for brass-bodied musical instruments
- GB/T 14786-1993 Test method for torsional fatigue of wheels of tractors and agricultural and forestry machinery
- GB/T 5206.4-1989 Vocabulary of paints and varnishes Part 4: Terms for the physical and chemical properties of coatings and coating films
- HG 3104-1989 Rubber test data distribution type inspection regulations
- JB/T 7505-1994 Ion Plating Terminology
- GB 17878-1999 Industrial non-refillable bottle valve
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]