
Method for measurement of crystallization time of glass powder for soldering with low-melt point
time:
2024-07-05 09:19:39
- SJ 3232.4-1989
- Abolished
Standard ID:
SJ 3232.4-1989
Standard Name:
Method for measurement of crystallization time of glass powder for soldering with low-melt point
Chinese Name:
低熔焊接玻璃粉结晶化时间的测定方法
Standard category:
Electronic Industry Standard (SJ)
-
Date of Release:
1989-03-20 -
Date of Implementation:
1989-03-25 -
Date of Expiration:
2005-09-01
China Standard Classification Number:
General>>Standardization Management and General Provisions>>A01 Technical Management
alternative situation:
Replaced by SJ/T 3231-2005

Skip to download
Summary:
SJ 3232.4-1989 Determination of crystallization time of low melting welding glass powder SJ3232.4-1989 Standard download decompression password: www.bzxz.net

Some standard content:
Standard of the Ministry of Machinery and Electronics Industry of the People's Republic of China Method for determining the crystallization time of low-melting welding glass powder 1 Subject content and scope of application 1.1 Subject content This standard specifies the determination of the crystallization time of low-melting welding glass powder. 1.2 Scope of application This standard applies to low-melting welding glass powder used in color picture tubes and other electronic devices 2 Key points of the method SJ3232.4-89 Since low-melting welding glass powder releases heat during crystallization, the differential thermal analyzer can be used to measure the differential thermal curve between it and the standard sample, and the graphical method can be used to obtain the crystallization time of the low-melting welding glass powder. 3 Instruments and Materials
3.1 Differential thermal analyzer: DT30;
3.2 Recorder: RT-22;
3.3 Analytical balance: sensitivity 0.1mg;
3.4 Sample box: aluminum stamping, external dimensions Φ×h, mm: 6×5; 3.5α-AlO powder.
3.6 Pure zinc flakes, purity 99.999%, dimensions I×b×h, mm: 1×1×0.24 Determination steps
4.1 Wrap the pure zinc flakes in an aluminum box and place them at the bottom of the sample box. Weigh about 50mgα-AlO powder in the sample box and weigh 120±5mg glass powder in another sample box. Put the two sample boxes into the designated sample rack in the furnace at the same time. Cover the furnace cover. Add the furnace cover.
4.2 According to the instrument manual, set the detector knob on DT-30 to PL and DTA, and set the selector switch and rate knob to UP-HOLD. Increase the temperature at 10C·min. The limit temperature is set to 440℃, and the starting temperature needs to be 3℃ lower than the room temperature. Set the thermocouple, range, and selector knob on DA-30 to PL, 100, and DTA respectively. Turn on the power switch on DA-30. 4.3 Turn on the power switch on DT30.
4.4 Turn on the recorder and adjust the pen for recording temperature to "0\" on the recording paper, so that the pen for recording differential thermal curve is in the middle of the recording paper. Then adjust the range of recording temperature to 25mV, the range of recording differential heat to 20mV, and the paper feed speed to 2.5mm·min-l
Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on 1989-03-20 and implemented on 1989-03-25
SJ3232.4-89
4.5 Press the ready and start buttons on DT-30. When the second exothermic peak appears on the differential thermal curve, turn off the power and stop the measurement.
SCalculation of test results
Draw tangents on both sides of the second peak on the recorded differential thermal curve to find the distance from the start of insulation to the highest point of the second exothermic peak. The time represented by this distance is the crystallization time, as shown in the figure below. (Use 1: 400 scale directly read)
1 Melting point of zinc;
Crystallization time
Crystallization time diagram
2 Heating curve; bZxz.net
3 Differential thermal curve.
6 Notes
SJ3232.4—89
6.1 Because the starting positions of the temperature recording pen and the differential thermal curve pen are not on the same straight line, the distance ahead of the temperature recording pen should be subtracted when drawing the graph,
6.2 Pure zinc sheet is used as the correction temperature, and its melting point is 420°C. The constant temperature of 440°C needs to be corrected by the measured zinc temperature. The temperature affects the crystallization time. Correction is made according to the following table. Correction table
Time min
Additional instructions:
This standard is under the jurisdiction of the Electronic Standardization Research Institute of the Ministry of Machinery and Electronics Industry, and this standard is drafted by Factory 4400.
The main drafters of this standard are Shi Jifen and Li Guanghui439
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
3.1 Differential thermal analyzer: DT30;
3.2 Recorder: RT-22;
3.3 Analytical balance: sensitivity 0.1mg;
3.4 Sample box: aluminum stamping, external dimensions Φ×h, mm: 6×5; 3.5α-AlO powder.
3.6 Pure zinc flakes, purity 99.999%, dimensions I×b×h, mm: 1×1×0.24 Determination steps
4.1 Wrap the pure zinc flakes in an aluminum box and place them at the bottom of the sample box. Weigh about 50mgα-AlO powder in the sample box and weigh 120±5mg glass powder in another sample box. Put the two sample boxes into the designated sample rack in the furnace at the same time. Cover the furnace cover. Add the furnace cover.
4.2 According to the instrument manual, set the detector knob on DT-30 to PL and DTA, and set the selector switch and rate knob to UP-HOLD. Increase the temperature at 10C·min. The limit temperature is set to 440℃, and the starting temperature needs to be 3℃ lower than the room temperature. Set the thermocouple, range, and selector knob on DA-30 to PL, 100, and DTA respectively. Turn on the power switch on DA-30. 4.3 Turn on the power switch on DT30.
4.4 Turn on the recorder and adjust the pen for recording temperature to "0\" on the recording paper, so that the pen for recording differential thermal curve is in the middle of the recording paper. Then adjust the range of recording temperature to 25mV, the range of recording differential heat to 20mV, and the paper feed speed to 2.5mm·min-l
Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on 1989-03-20 and implemented on 1989-03-25
SJ3232.4-89
4.5 Press the ready and start buttons on DT-30. When the second exothermic peak appears on the differential thermal curve, turn off the power and stop the measurement.
SCalculation of test results
Draw tangents on both sides of the second peak on the recorded differential thermal curve to find the distance from the start of insulation to the highest point of the second exothermic peak. The time represented by this distance is the crystallization time, as shown in the figure below. (Use 1: 400 scale directly read)
1 Melting point of zinc;
Crystallization time
Crystallization time diagram
2 Heating curve; bZxz.net
3 Differential thermal curve.
6 Notes
SJ3232.4—89
6.1 Because the starting positions of the temperature recording pen and the differential thermal curve pen are not on the same straight line, the distance ahead of the temperature recording pen should be subtracted when drawing the graph,
6.2 Pure zinc sheet is used as the correction temperature, and its melting point is 420°C. The constant temperature of 440°C needs to be corrected by the measured zinc temperature. The temperature affects the crystallization time. Correction is made according to the following table. Correction table
Time min
Additional instructions:
This standard is under the jurisdiction of the Electronic Standardization Research Institute of the Ministry of Machinery and Electronics Industry, and this standard is drafted by Factory 4400.
The main drafters of this standard are Shi Jifen and Li Guanghui439
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JJG 164-2000 Verification Regulation of Standard Facilities for Liquid Flowrate
- GB/T 4750-2002 Standard Atlas of Household Biogas Digesters
- JB/T 5818.3-1991 Technical requirements for wire and cable stranding equipment
- GB/T 4897.4-2003 Particleboard Part 4: Requirements for structural boards used in a dry state
- HG/T 2720-1995 Diethylamine
- GB/T 3871.11-1993 Test methods for agricultural wheeled and crawler tractors Part 11: High temperature adaptability test
- HG/T 2869-1997 Rubber and plastic hoses--Evaluation of ozone resistance under static conditions
- GB/T 15305.4-1994 Coated abrasive discs - Dimensions and tolerances
- GB 50251-1994 Code for Design of Gas Pipeline Engineering
- JB/T 50159-1999 Compressed air station energy consumption classification
- HG/T 2901-1997 Test method for particle size of polytetrafluoroethylene resin
- SY/T 5369-1994 Management and use of petroleum drilling tools Kelly, drill pipe, drill collar
- JB/T 6313.3-1992 Electrical copper braided wire Straight-grain braided wire
- JB/T 3688.3-1998 Test methods for wheel loaders
- JB/T 9531-1999 Spot welding electrode stoppers and clamps
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com