JB/T 6939.1-1993 Technical requirements for controllers for small wind turbine generator sets
time:
1999-01-01 16:00:00
- JB/T 6939.1-1993
- in force
Standard ID:
JB/T 6939.1-1993
Standard Name:
Technical requirements for controllers for small wind turbine generator sets
Chinese Name:
小型风力发电机组用控制器 技术条件
Standard category:
Machinery Industry Standard (JB)
-
Date of Implementation:
1994-07-01
China Standard Classification Number:
Energy, Nuclear Technology>>Energy>>F11 Wind Energy
alternative situation:
Replaced by JB/T 6939.1-2004

Skip to download
Summary:
JB/T 6939.1-1993 Technical specifications for controllers for small wind turbines JB/T6939.1-1993 Standard download and decompression password: www.bzxz.net

Some standard content:
Mechanical Industry Standard of the People's Republic of China
JB/T 6939.193
Controller for small wind turbines
Technical conditions||tt| |Released on 1993-07-29
Ministry of Machinery Industry of the People's Republic of China
Released
Implemented on 1994-01-01
Machinery Industry Standards of the People's Republic of China||tt| |Controller for small wind turbines
Technical conditions
1 Subject content and scope of application
JB/T 6939.193
This standard specifies rechargeable small wind turbines Classification, technical requirements, inspection rules, marking, packaging, transportation and storage of controllers.
This standard applies to controllers for rechargeable small wind turbines (hereinafter referred to as controllers). 2 Reference standards
JB/T5673
General technical conditions for painting of agricultural and forestry tractors and machinery JB/T6939.2 Test methods for controllers for small wind turbines 3 Classification of controllers
3.1 Controllers are divided into:
a according to their functional characteristics. Simple type: A product that has the function of indicating overvoltage, undervoltage and normal operation of the battery pack, and can transmit the electric energy of the distribution unit to the electrical appliances:
b. Automatic protection type: it can indicate overvoltage, undervoltage and normal operation of the battery pack. It has an automatic protection function in case of under-voltage and can transmit the power of the supporting unit to the electrical products.
3.2 The controller is divided into DC input type according to the installation position of the rectifier device: a product matching the small wind turbine generator with the rectifier device installed directly on the generator: a.
b. AC input type: The rectifier is installed inside the controller. 4 Technical requirements
4.1 The controller should comply with the provisions of this standard and be manufactured according to the drawings and technical documents approved by the prescribed procedures. 4.2 The controller should be able to work continuously and reliably under the following conditions; a. Ambient temperature: -20~+40℃,
b. Air relative humidity: no more than 85% (at 25℃). 4.3 The simple controller should have an indicator device for overvoltage and undervoltage of the battery pack, and its overvoltage and undervoltage indication values ??should comply with the provisions of the operating voltage in Table 1.
4.4 Automatic protection control The overvoltage and undervoltage protection performance of the device should comply with the requirements in Table 1. Approved by the Ministry of Machinery Industry on 1993-07-29
Implemented on 1994-01-01
battery Group
voltage series
action voltage
15. 6||tt ||31.2
JB/T6939.1-93
Table 1
Overvoltage value|| tt||Recovery voltage
14.6±0.2
29.3±0.5
43.9±0. 7
134.2±2.2
Operating voltage
under voltage value
recovery voltage
11.5±0.2| |tt||22.9±0.5
34. 4± 0. 7
105.0±2.2
The voltage series is not included in the battery pack in Table 1, The overvoltage and undervoltage values ??of each single battery should be calculated according to the provisions of Table 2. Table 2
operating voltage
voltage
recovery voltage
2. 44 ± 0. 04
The automatic protection controller should have the battery pack voltage indication function, the operating voltage
voltage|| tt | Table 3
Voltage adjustment book
Note: The ripple current refers to the peak-to-peak value.
Current Regulation%
Ripple Voltage
4.8 pairs with regulated output short circuit The short-circuit protection action time of the controller with protection function should not be greater than 0.5s, and the V
4.9 controller should run for 5 minutes under the following two overload conditions, and its main electrical performance should still comply with Article 4.3 of this standard or The provisions of Article 4.4:
input power is 2 times the rated output power of the supporting unit: a.
The output power is 1.5 times the rated output power of the supporting unit. 4.10 After the controller is subjected to the vibration test in accordance with Article 4.9 of JB/T6939.2, its main electrical performance should still comply with the provisions of Article 4.3 or Article 4.4 of this standard.
The average working time before the first failure of the controller should be not less than 1500h4.12
The painting of the controller should Comply with the regulations of JB/T5673. Test method
The test of the controller shall be carried out in accordance with the provisions of JB/T6939.2. Inspection rules
The inspection of the controller is divided into factory inspection and type inspection, 6.1 Factory inspection
6.1.1 The controller should be remotely inspected for factory inspection, and passed the inspection by the quality inspection department, and the product certificate should be attached. Before leaving the factory 6.1.2 The items of factory inspection shall be carried out in accordance with the requirements of Articles 4.3 to 4.6 and Article 4.12 of this standard. 6.1.3 During the factory inspection, if all performance indicators meet the regulations, it will be judged as qualified. If there are any unqualified items, they will be re-inspected after repair. Those that pass the repair will be judged as qualified. Those that fail will be judged as unqualified. 2
Type inspection
JB/T6939.193
When the product encounters the following conditions, type inspection should be carried out, whether it is a new product or an old product Trial molding appraisal for factory transfer: b.
For finalized products, when the design, process or material changes are enough to cause changes in certain properties and parameters of the product: when products that have been out of production for more than three years resume production; the results of the factory inspection are different from the last type inspection When there is a big difference; when the national quality supervision agency proposes type inspection requirements. The collars for type inspection shall be carried out item by item according to the items stipulated in Articles 4.2 to 4.12 of this standard. The prototypes for type inspection shall be randomly selected from the batch of qualified products. When the batch N = 9 to 15, one-time sampling shall be adopted for positive tape inspection. Plan, its quality failure classification and sampling plan are shown in Table 4. Table 4
Unqualified classification
Unqualified items
Number of meshes
Project
Judgment
Defined
Judgment rules
c.|| tt||Check Level
Sample Code
Sample Size
Passed Medical test
Long term pressure test
Overload test
B||tt ||Voltage indication function test
Voltage regulation rate test
Current regulation rate test
Ripple voltage test
Regulated output short-circuit protection test||tt| |High temperature test
Low temperature test
Alarm test
Average working time before first failure
Coating quality
General inspection Level 1
When the accumulated unqualified number of the inspected category is less than or equal to the qualified judgment number Ac, the whole The batch of products was judged to be qualified in this category. When the cumulative number of unqualified products in the inspected category is greater than or equal to the unqualified number Re, the entire batch of products will be judged to be unqualified in that category. When the product is judged to be qualified in both categories A and B.The whole batch of products is judged as qualified, otherwise it is judged as unqualified. Marking, packaging, transportation, storage
The markings on the product packaging boxes should be complete and clear. 7. 1. 1
The product markings should include the following:
Manufacturer name:Www.bzxZ.net
Product name,
Product model or mark:
Factory number or factory date
The packaging box label should include the following contents:
Product name, specification:
Product quantity;
Gross weight of packaging box, kg:
Delivery location:
Name of receiving station, receiving unit:
JB/T6939.193
Precautions mark: "Handle with care", "Upward", "Moisture-proof" and other words or symbols; manufacturer's name.
The product can be packaged in a basin or box. The product packaging should ensure that the product is not damaged during circulation. 7. 2. 1
Product packaging should comply with the relevant regulations of the transportation department. The packaging box (box) should carry the following documents: Packing list:
Instruction manual:
Inspection certificate.
The product should be suitable for general road and rail transportation. 7.3
Packaged products should be stored in clean, dry and well-ventilated warehouses. Quality Assurance Period
If the user complies with the installation and use rules of the controller, within 12 months from the date of purchase, if the product cannot work normally due to poor manufacturing quality, the manufacturer should repair or replace it for the user free of charge. Additional Notes:
This standard was proposed and coordinated by the Hohhot High-speed Animal Husbandry Machinery Research Institute of the Ministry of Machinery Industry, and this standard was drafted by the Hohhot Animal Husbandry Machinery Research Institute. The main drafter of this standard is Hada.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
JB/T 6939.193
Controller for small wind turbines
Technical conditions||tt| |Released on 1993-07-29
Ministry of Machinery Industry of the People's Republic of China
Released
Implemented on 1994-01-01
Machinery Industry Standards of the People's Republic of China||tt| |Controller for small wind turbines
Technical conditions
1 Subject content and scope of application
JB/T 6939.193
This standard specifies rechargeable small wind turbines Classification, technical requirements, inspection rules, marking, packaging, transportation and storage of controllers.
This standard applies to controllers for rechargeable small wind turbines (hereinafter referred to as controllers). 2 Reference standards
JB/T5673
General technical conditions for painting of agricultural and forestry tractors and machinery JB/T6939.2 Test methods for controllers for small wind turbines 3 Classification of controllers
3.1 Controllers are divided into:
a according to their functional characteristics. Simple type: A product that has the function of indicating overvoltage, undervoltage and normal operation of the battery pack, and can transmit the electric energy of the distribution unit to the electrical appliances:
b. Automatic protection type: it can indicate overvoltage, undervoltage and normal operation of the battery pack. It has an automatic protection function in case of under-voltage and can transmit the power of the supporting unit to the electrical products.
3.2 The controller is divided into DC input type according to the installation position of the rectifier device: a product matching the small wind turbine generator with the rectifier device installed directly on the generator: a.
b. AC input type: The rectifier is installed inside the controller. 4 Technical requirements
4.1 The controller should comply with the provisions of this standard and be manufactured according to the drawings and technical documents approved by the prescribed procedures. 4.2 The controller should be able to work continuously and reliably under the following conditions; a. Ambient temperature: -20~+40℃,
b. Air relative humidity: no more than 85% (at 25℃). 4.3 The simple controller should have an indicator device for overvoltage and undervoltage of the battery pack, and its overvoltage and undervoltage indication values ??should comply with the provisions of the operating voltage in Table 1.
4.4 Automatic protection control The overvoltage and undervoltage protection performance of the device should comply with the requirements in Table 1. Approved by the Ministry of Machinery Industry on 1993-07-29
Implemented on 1994-01-01
battery Group
voltage series
action voltage
15. 6||tt ||31.2
JB/T6939.1-93
Table 1
Overvoltage value|| tt||Recovery voltage
14.6±0.2
29.3±0.5
43.9±0. 7
134.2±2.2
Operating voltage
under voltage value
recovery voltage
11.5±0.2| |tt||22.9±0.5
34. 4± 0. 7
105.0±2.2
The voltage series is not included in the battery pack in Table 1, The overvoltage and undervoltage values ??of each single battery should be calculated according to the provisions of Table 2. Table 2
operating voltage
voltage
recovery voltage
2. 44 ± 0. 04
The automatic protection controller should have the battery pack voltage indication function, the operating voltage
voltage|| tt | Table 3
Voltage adjustment book
Note: The ripple current refers to the peak-to-peak value.
Current Regulation%
Ripple Voltage
4.8 pairs with regulated output short circuit The short-circuit protection action time of the controller with protection function should not be greater than 0.5s, and the V
4.9 controller should run for 5 minutes under the following two overload conditions, and its main electrical performance should still comply with Article 4.3 of this standard or The provisions of Article 4.4:
input power is 2 times the rated output power of the supporting unit: a.
The output power is 1.5 times the rated output power of the supporting unit. 4.10 After the controller is subjected to the vibration test in accordance with Article 4.9 of JB/T6939.2, its main electrical performance should still comply with the provisions of Article 4.3 or Article 4.4 of this standard.
The average working time before the first failure of the controller should be not less than 1500h4.12
The painting of the controller should Comply with the regulations of JB/T5673. Test method
The test of the controller shall be carried out in accordance with the provisions of JB/T6939.2. Inspection rules
The inspection of the controller is divided into factory inspection and type inspection, 6.1 Factory inspection
6.1.1 The controller should be remotely inspected for factory inspection, and passed the inspection by the quality inspection department, and the product certificate should be attached. Before leaving the factory 6.1.2 The items of factory inspection shall be carried out in accordance with the requirements of Articles 4.3 to 4.6 and Article 4.12 of this standard. 6.1.3 During the factory inspection, if all performance indicators meet the regulations, it will be judged as qualified. If there are any unqualified items, they will be re-inspected after repair. Those that pass the repair will be judged as qualified. Those that fail will be judged as unqualified. 2
Type inspection
JB/T6939.193
When the product encounters the following conditions, type inspection should be carried out, whether it is a new product or an old product Trial molding appraisal for factory transfer: b.
For finalized products, when the design, process or material changes are enough to cause changes in certain properties and parameters of the product: when products that have been out of production for more than three years resume production; the results of the factory inspection are different from the last type inspection When there is a big difference; when the national quality supervision agency proposes type inspection requirements. The collars for type inspection shall be carried out item by item according to the items stipulated in Articles 4.2 to 4.12 of this standard. The prototypes for type inspection shall be randomly selected from the batch of qualified products. When the batch N = 9 to 15, one-time sampling shall be adopted for positive tape inspection. Plan, its quality failure classification and sampling plan are shown in Table 4. Table 4
Unqualified classification
Unqualified items
Number of meshes
Project
Judgment
Defined
Judgment rules
c.|| tt||Check Level
Sample Code
Sample Size
Passed Medical test
Long term pressure test
Overload test
B||tt ||Voltage indication function test
Voltage regulation rate test
Current regulation rate test
Ripple voltage test
Regulated output short-circuit protection test||tt| |High temperature test
Low temperature test
Alarm test
Average working time before first failure
Coating quality
General inspection Level 1
When the accumulated unqualified number of the inspected category is less than or equal to the qualified judgment number Ac, the whole The batch of products was judged to be qualified in this category. When the cumulative number of unqualified products in the inspected category is greater than or equal to the unqualified number Re, the entire batch of products will be judged to be unqualified in that category. When the product is judged to be qualified in both categories A and B.The whole batch of products is judged as qualified, otherwise it is judged as unqualified. Marking, packaging, transportation, storage
The markings on the product packaging boxes should be complete and clear. 7. 1. 1
The product markings should include the following:
Manufacturer name:Www.bzxZ.net
Product name,
Product model or mark:
Factory number or factory date
The packaging box label should include the following contents:
Product name, specification:
Product quantity;
Gross weight of packaging box, kg:
Delivery location:
Name of receiving station, receiving unit:
JB/T6939.193
Precautions mark: "Handle with care", "Upward", "Moisture-proof" and other words or symbols; manufacturer's name.
The product can be packaged in a basin or box. The product packaging should ensure that the product is not damaged during circulation. 7. 2. 1
Product packaging should comply with the relevant regulations of the transportation department. The packaging box (box) should carry the following documents: Packing list:
Instruction manual:
Inspection certificate.
The product should be suitable for general road and rail transportation. 7.3
Packaged products should be stored in clean, dry and well-ventilated warehouses. Quality Assurance Period
If the user complies with the installation and use rules of the controller, within 12 months from the date of purchase, if the product cannot work normally due to poor manufacturing quality, the manufacturer should repair or replace it for the user free of charge. Additional Notes:
This standard was proposed and coordinated by the Hohhot High-speed Animal Husbandry Machinery Research Institute of the Ministry of Machinery Industry, and this standard was drafted by the Hohhot Animal Husbandry Machinery Research Institute. The main drafter of this standard is Hada.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 10237-2001 Rolling bearings - Tapered roller bearings - Vibration (acceleration) technical requirements
- JB/T 2001.73-1999 45° serrated thread profile and basic dimensions for water systems
- QB/T 2521-2001 Spearmint oil
- FZ/T 73018-2002 Wool knitwear
- GB/T 15220-1994 Analysis method of iron-59 in water
- HG/T 2810-1996 Reciprocating seal rubber materials
- JB/T 6639-2004 Technical conditions for skeleton nitrile rubber sealing rings of rolling bearing parts
- JB/T 10158-1999 Technical requirements for pulleys and die cutters
- QB/T 2929-2008 Limits and determination method of residual solvent in solvent based printing ink
- GB/T 15288-1994 Radio frequency interference suppression integrated filters Part 2: Selection of test methods and general requirements for sub-specifications
- JB/T 5275-1991 YW series and Y-WF series outdoor and outdoor chemical corrosion-resistant three-phase asynchronous motor technical conditions (frame size 80 ~ 315)
- JJF 1213-2008 Calibration Specification for the Pulmonary Function Measuring Instrument
- QB/T 1592-1992 Vertical high-speed single-spindle woodworking milling machine
- GB/T 15076.11-1994 Chemical analysis methods for tantalum and niobium - Determination of arsenic, antimony, lead, tin and bismuth in niobium
- QB/T 2418-1998 Bamboo cutting machine with knife roller
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]