GB/T 11606.6-1989 Environmental test methods for analytical instruments - Constant humidity test
time:
2024-08-06 11:03:19
- GB/T 11606.6-1989
- Abolished
Standard ID:
GB/T 11606.6-1989
Standard Name:
Environmental test methods for analytical instruments - Constant humidity test
Chinese Name:
分析仪器环境试验方法 恒定湿度试验
Standard category:
National Standard (GB)
-
Date of Release:
1989-03-31 -
Date of Implementation:
1990-03-01 -
Date of Expiration:
2007-12-01
Standard ICS number:
Test >> 19.040 Environmental TestChina Standard Classification Number:
Instruments and meters>>Material composition analysis instruments and environmental monitoring instruments>>N50 Material composition analysis instruments and environmental monitoring instruments comprehensive
alternative situation:
Replaced by GB/T 11606-2007
Review date:
2004-10-14Drafting Organization:
Beijing Analytical Instruments InstituteFocal point Organization:
National Technical Committee for Industrial Process Measurement and Control StandardizationPublishing Department:
China Machinery Industry FederationCompetent Authority:
China Machinery Industry Federation
Skip to download
Summary:
GB/T 11606.6-1989 Environmental test methods for analytical instruments Constant humidity test GB/T11606.6-1989 Standard download decompression password: www.bzxz.net
Some standard content:
National Standard of the People's Republic of China
The method of environmental test for analytical instrumentsDamp heat, steady state
1 Subject content and scope of application
GB11606.6—89
This standard specifies the constant humidity test grouping, test conditions, test duration and test methods for analytical instruments (hereinafter referred to as instruments)
This standard is applicable to the assessment of the adaptability of instruments to work under high relative humidity environmental conditions. 2 Constant humidity test grouping
Relative humidity%
Temperature℃
3 Test conditions
3.1 Requirements for test equipment
Upper limit of rated working temperature-5
3.1.1 The working space of the test chamber (room) shall be equipped with sensors to monitor the temperature and humidity of the test chamber (room) JV group
3.1.2 The temperature and relative humidity in the effective working space of the test chamber (room) shall be able to be maintained within the range required by each group in Chapter 2. 3.1.3 The condensed water in the test chamber (room) shall be continuously removed and cannot be used before purification. 3.1.4 The resistivity of water used directly to generate humidity shall not be less than 5002·m3.1.5 If the instrument has requirements for wind speed, vibration and other sound quantities, it should be stated in the product standard. 3.1.6 The test box (room) should have well-insulated terminals and devices to ensure the cable exit, so as to test the electrical performance of the instrument in the test box (room).
3.1.7 Condensed water on the inner wall and top of the test box (room) cannot drip onto the instrument. 3.1.8 The test box (room) should be equipped with observation windows and lighting devices. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough to test the whole machine, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test duration
The stabilization time of the instrument is selected from the following values: 4, 8, 12h. If there is no separate provision, the test duration is 4h. 5 Test method
5.1 Pretreatment
Put the instrument in normal (or reference) environmental conditions to achieve temperature equilibrium. Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
5.2 Initial inspection
Inspect the instrument in accordance with relevant standards. 5.3 Test
GB11606.6--89
Put the instrument in the test box (room) and power it on. There should be an appropriate distance between the instruments, and no overlap is allowed. The temperature of the test box (room) reaches the specified value at an average temperature change rate of less than 1C/min, and then humidify to the specified value and maintain it for the specified test duration.
5.4 Intermediate inspection
After reaching the specified test duration, the instrument shall be inspected immediately under the environmental conditions according to the relevant standards. 5.5 RecoverybzxZ.net
After the test, the instrument shall remain in the test box (room) and stop working, and then the temperature (with an average change rate of less than 1C/min) and humidity shall be returned to normal (or reference) environmental conditions, and the instrument shall be restored for 2 hours. 5.6 Final inspection
Inspect the instrument according to the relevant standards. Details to be specified when citing this standard
Pretreatment;
Items and requirements for initial inspection;
Test duration;
Items and requirements for intermediate inspection;
Items and requirements for final inspection.
GB/T11606.6—1989 "Constant Humidity Test for Environmental Test Methods of Analytical Instruments" Amendment No. 1 This amendment was approved by the National Quality and Technical Supervision Bureau on July 19, 2000 in the form of Quality and Technical Supervision Letter (No. 20001108), and will be implemented from December 1, 2000. The name of this standard "Constant Humidity Test" should be changed to "Constant Humidity Test". "Constant Humidity Test" in Chapter 1 and Chapter 2 should be changed to "Constant Humidity Test". 2. The units in the tables in Chapter 2 should be placed below the project names. 3. Article 3.1.4 is revised to "The resistivity of water is not less than 500a·m (equivalent to a conductivity of not more than 20μS·cm\)". 12
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
The method of environmental test for analytical instrumentsDamp heat, steady state
1 Subject content and scope of application
GB11606.6—89
This standard specifies the constant humidity test grouping, test conditions, test duration and test methods for analytical instruments (hereinafter referred to as instruments)
This standard is applicable to the assessment of the adaptability of instruments to work under high relative humidity environmental conditions. 2 Constant humidity test grouping
Relative humidity%
Temperature℃
3 Test conditions
3.1 Requirements for test equipment
Upper limit of rated working temperature-5
3.1.1 The working space of the test chamber (room) shall be equipped with sensors to monitor the temperature and humidity of the test chamber (room) JV group
3.1.2 The temperature and relative humidity in the effective working space of the test chamber (room) shall be able to be maintained within the range required by each group in Chapter 2. 3.1.3 The condensed water in the test chamber (room) shall be continuously removed and cannot be used before purification. 3.1.4 The resistivity of water used directly to generate humidity shall not be less than 5002·m3.1.5 If the instrument has requirements for wind speed, vibration and other sound quantities, it should be stated in the product standard. 3.1.6 The test box (room) should have well-insulated terminals and devices to ensure the cable exit, so as to test the electrical performance of the instrument in the test box (room).
3.1.7 Condensed water on the inner wall and top of the test box (room) cannot drip onto the instrument. 3.1.8 The test box (room) should be equipped with observation windows and lighting devices. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough to test the whole machine, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test duration
The stabilization time of the instrument is selected from the following values: 4, 8, 12h. If there is no separate provision, the test duration is 4h. 5 Test method
5.1 Pretreatment
Put the instrument in normal (or reference) environmental conditions to achieve temperature equilibrium. Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
5.2 Initial inspection
Inspect the instrument in accordance with relevant standards. 5.3 Test
GB11606.6--89
Put the instrument in the test box (room) and power it on. There should be an appropriate distance between the instruments, and no overlap is allowed. The temperature of the test box (room) reaches the specified value at an average temperature change rate of less than 1C/min, and then humidify to the specified value and maintain it for the specified test duration.
5.4 Intermediate inspection
After reaching the specified test duration, the instrument shall be inspected immediately under the environmental conditions according to the relevant standards. 5.5 RecoverybzxZ.net
After the test, the instrument shall remain in the test box (room) and stop working, and then the temperature (with an average change rate of less than 1C/min) and humidity shall be returned to normal (or reference) environmental conditions, and the instrument shall be restored for 2 hours. 5.6 Final inspection
Inspect the instrument according to the relevant standards. Details to be specified when citing this standard
Pretreatment;
Items and requirements for initial inspection;
Test duration;
Items and requirements for intermediate inspection;
Items and requirements for final inspection.
GB/T11606.6—1989 "Constant Humidity Test for Environmental Test Methods of Analytical Instruments" Amendment No. 1 This amendment was approved by the National Quality and Technical Supervision Bureau on July 19, 2000 in the form of Quality and Technical Supervision Letter (No. 20001108), and will be implemented from December 1, 2000. The name of this standard "Constant Humidity Test" should be changed to "Constant Humidity Test". "Constant Humidity Test" in Chapter 1 and Chapter 2 should be changed to "Constant Humidity Test". 2. The units in the tables in Chapter 2 should be placed below the project names. 3. Article 3.1.4 is revised to "The resistivity of water is not less than 500a·m (equivalent to a conductivity of not more than 20μS·cm\)". 12
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 17989-2000 Control charts--General guide and introduction
- GB/T 2912.1-1998 Determination of formaldehyde in textiles Part 1: Free and hydrolyzed formaldehyde (water extraction method)
- GB/T 18754-2002 UV-excitation fluorecent anti-counterfeiting intaglio printing ink
- GB/T 5338-2002 Series 1 freight containers00Specification and testing--Part 1:General cargo containers for general purposes
- JB/T 10181.1-2000 Calculation of cable current carrying capacity Part 1: Current carrying capacity formula (100% load factor) and loss calculation Section 1: General provisions
- YY 0054-1991 Hemodialysis device
- CJ 3082-1999 Water Quality Standard for Sewage Discharge into Urban Sewers
- JB/T 7279-1994 Test methods for mechanical steering systems of wheeled tractors
- QB/T 2476-2000 Spherical door lock
- CB 383-65 防水式穿线管
- NY/T 725-2003 Determination of monensin in feed by high performance liquid chromatography
- JB/T 3732.4-2004 Gear Shaving Machines Part 4: Series
- GB 5275-1985 Gas analysis - Preparation of mixed gases for calibration - Permeation method
- HG/T 2602-1994 Rubber cutting machine
- JB/T 7169-1993 General technical specifications for rail-type hydraulic rock drills
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:wymp4wang@gmail.com