JB/T 3073.3-1991 Technical specifications for die-forged moving and stationary blades and hot-rolled stationary blade blanks for steam turbines Hot-rolled stationary blade blanks

time: 2024-08-04 05:11:24
  • JB/T 3073.3-1991
  • in force

Basic Information

standard classification number

  • China Standard Classification Number:

    Electrical Engineering>>Power Equipment for Power Generation>>K54 Steam Turbine and Auxiliary Equipment

associated standards

Publication information

  • publishing house:

    China Machinery Industry Press
  • Publication date:

    1992-07-01

Other Information

  • Drafting Organization:

    Shanghai Power Generation Equipment Design Institute and Shanghai Steam Turbine Factory
  • Focal point Organization:

    Shanghai Power Generation Equipment Design Institute of the Ministry of Machinery and Electronics Industry
  • Proposing Organization:

    Shanghai Power Generation Equipment Design Institute of the Ministry of Machinery and Electronics Industry
  • Publishing Department:

    Ministry of Machinery and Electronics Industry of the People's Republic of China
Introduction to standardsDescription (Translated English) / download

Skip to download

Summary:

This standard specifies the technical conditions, test methods and inspection rules for hot-rolled stationary blade blanks for steam turbines. This standard applies to hot-rolled stationary blade blanks for steam turbines. JB/T 3073.3-1991 Technical conditions for die-forged moving and stationary blades and hot-rolled stationary blade blanks for steam turbines Hot-rolled stationary blade blanks JB/T3073.3-1991 Standard download decompression password: www.bzxz.net
Standard contentStandard content

Some standard content:

Mechanical Industry Standard of the People's Republic of ChinaWww.bzxZ.net
JB/T3073.3
Orbital Science
1991-07-01
Cheek Kui Wa Art
1992-07-01
Zhang Xianji
Cheek Kui Lu Wa Art
Peng Orbital Science
Hong Cancer
This standard specifies the technical requirements, test methods and inspection specifications for the hot-rolled stationary blades of steam turbines. This standard is applicable to the hot-rolled stationary blades of steam turbines. 2 Reference Standards
GB222 Chemical Analysis of Pins Sample Sampling Method and Permissible Deviation of Chemical Composition of Products. GB22B Tensile test method for metal
GB 231 Brinell hardness test method for metal
3 Tensile requirements
3.1 Chemical composition
The chemical composition of blade hair should comply with the requirements of Table 1. Table 1
1Cr1Moy
3.2 Hardness
ko.10~0.15
0. 11 0. 18
40. 030≤0. 030
The hardness of blade hair after heat treatment should comply with the requirements of Table 2 Table 2
1Cr1IM-V
3.3 Mechanical properties
1991-07-01Nodule
0. 60 11. 50 -13. 5
JB/T3073.3
0.6010.0011.50.50~0.70.25~~0.40≤0.30%
Brinell hardness
189~229
192~233
192~241
212~248
Combustion treatment state
High temperature tempering
High temperature tempering
1992-07-01Small lock
JB/T3073.31991
The results of the blade hair that needs to be tested for performance after heat treatment should meet the requirements of Table 2. At this time, the hardness value is not used as the basis for acceptance. 3.4 Appearance quality
3.4.1 The shape and size of the blade roughness shall meet the requirements of the blade roughness sample, and the curvature shall be 0.3%. 3.4.2 The surface of the blade roughness shall not have defects such as cracks, folds, knots and inclusions. If there are any defects, they must be completely removed, and the depth of removal shall not exceed 0.5mm from the nominal size. If there are individual pits, pits and other defects on the surface of the blade, the depth shall not exceed 0.5mm from the nominal size.
3.4.3 There shall be no rolling round heads at both ends of the profile, and the flash on both sides of the steam inlet and outlet edges is allowed to have a single-sided margin of 1/3.3.5 Process requirements
3.5.1 The blade roughness shall be charged separately according to each smelting furnace number and shall not be mixed. 3.5.2 The blade roughness can be calibrated after heat treatment. After cold correction, stress relief tempering is carried out. The temperature of heat correction and stress relief tempering should be 30℃ to 50℃ lower than the original tempering temperature.3.5.3 The scale of blade rough parts should be removed after heat treatment. 3. Blade rough parts with cracks after fine processing should be scrapped. 4 Test methods
4.1 Chemical analysis can adopt other methods that meet the accuracy requirements of GB223. In case of objection, arbitration analysis should be carried out according to GB223, and the analysis sampling method should be in accordance with GB222.
4.2 Hardness determination method should be in accordance with GB231. 4.3 Tensile test method should be in accordance with GB228. S Inspection rules
5. 1 Inspection and acceptance
Inspection and acceptance shall be carried out by the quality inspection department. 5. 2 Division of batches
Blade rough parts should be accepted in batches, and each batch consists of rough parts with the same smelting furnace number, the same heat treatment (tempering) furnace or the same continuous heat treatment furnace.
5.3 Chemical analysis
The chemical composition of blade hair is generally based on the re-test of raw materials, and can be sampled if necessary. 5. 4 Hardness
The hardness of blade hair is sampled by batch after heat treatment. The number of samples to be sampled shall not be less than 5K and not less than 5 pieces per batch. If the hardness is found to be inconsistent with the regulations, the hardness of the whole batch of hair shall be tested.
5.5 Strength and other properties
5.5.1 From each batch of blade hair, take the two pieces with the highest and lowest hardness values ​​for the preparation of specimens. 5.5.1 Cut a longitudinal tensile specimen from the selected blade hair ring. It is not allowed to cut the specimen by hot working method. 5.5.3 If the specimen has material or machining defects, the test result is invalid and the sample shall be re-tested. If it is determined that the material defect is white spot, the whole batch of blade hair shall be reported.
5.5.4 If the test results of some items do not meet the requirements of this standard, a double number of specimens should be cut from the same test blade rough piece or the same batch of rough pieces with the same hardness value as the first test to re-test the unqualified items. If some items still do not meet the requirements, the batch of rough pieces will be unqualified, but the hardness of the batch of rough pieces can be reclassified and inspected or re-heat-treated (the total number of quenching times shall not exceed 10 times, and the number of tempering times is unlimited) and then tested again. If it still fails to meet the requirements, the batch of rough pieces shall be scrapped. S.6 Appearance quality
5.6.1 The shape and size of the blade rough pieces shall be checked in accordance with the requirements of Article 3.4.1. 5.6.2 The surface quality of the blade rough pieces shall be directly inspected with the naked eye. 2
Marking and quality assurance
JB/T3073.3
The blade parts that have passed the inspection shall be marked as follows: Inspection mark
b Melting furnace number and heat treatment furnace number (or code); Manufacturer's mark.
6.2 Quality certificate
Each batch of delivered blade parts shall be accompanied by a quality certificate, the contents of which are: a.
Drawing number or order number!
Material brand and chemical composition;
Melting furnace number and heat treatment furnace number (or code); Delivery quantity,
Results of all inspection and test items;
Provide the last heat treatment process parameters! This standard number:
Signature and seal of the person in charge of the quality inspection department.
Additional instructions:
This standard is proposed and managed by the Shanghai Power Equipment Complete Design Institute of the Ministry of Machinery and Electronics Industry. This standard was drafted by Shanghai Power Generation Equipment Transformation Design Institute and Shanghai Steam Turbine Factory.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.