HG/T 20636.7-1998 Procedures for the design of automatic control engineering
time:
2024-08-13 19:03:06
- HG/T 20636.7-1998
- in force
Standard ID:
HG/T 20636.7-1998
Standard Name:
Procedures for the design of automatic control engineering
Chinese Name:
自控专业工程设计的程序
Standard category:
Chemical industry standards (HG)
-
Date of Release:
1998-06-22 -
Date of Implementation:
1999-01-01
Standard ICS number:
Mechanical Manufacturing>>Industrial Automation Systems>>25.040.40 Measurement and Control of Industrial Processes 71.010China Standard Classification Number:
Engineering Construction>>Industrial Equipment Installation Engineering>>P94 Metal Equipment and Process Pipeline Installation Engineering

Skip to download
Summary:
HG/T 20636.7-1998 Procedure for the design of automatic control engineering HG/T20636.7-1998 Standard download decompression password: www.bzxz.net

Some standard content:
Procedure for Engineering Design of InstrumentationHG/T20636.7-1998Compiled by: China Chengda Chemical Engineering Co., Ltd.China Huanqiu Chemical Engineering Co., Ltd.Approved by: State Administration of Petroleum and Chemical IndustryImplementation date: January 1, 1999Standards.combzso8o:comDownload all standard industry materials for freeCompiled by:Dai LiyiReviewed by:Wang DazhengZhang ZhenjiDuanmu XianSun Jian Text by Liu Jianzhong
Standard Jiejie.com bzso8o:com Free download of various American standard industry materials 1.0.1
1 General Principles
In order to implement the international general design system and methods, and provide the standard for the engineering design of the automatic control professional designers, this regulation is specially formulated
1.0.2 This regulation applies to the various design work of the automatic control professional carried out in the engineering design stage (including the basic engineering design stage and the detailed engineering design stage) and the work procedures of the procurement of instruments and installation materials. 1.0.3 The relevant standards are as follows:
HG20557
HG/T20636.6
"Regulations on Process System Design Management"
"Tasks of Automatic Control Professional Engineering Design"
When implementing this regulation, it should also comply with the provisions of the relevant current national standards. 73
Standard exchange network
oae.com Class standard industry data free download 2 Work procedures
2.0.1 The engineering design procedure of the automatic control specialty should comply with the requirements of the "Working procedure diagram of the engineering design stage of the automatic control specialty" (Figure 2.0.1).
The working procedure diagram reflects the various design tasks to be carried out by the automatic control specialty during each version of P&ID, and its work content description should comply with the provisions of "Tasks of engineering design of the automatic control specialty" (HG/T206366). 2.0.2 Work procedure diagram description:
1 The various design documents listed during each version of P&ID in the figure indicate the time of starting to compile (draw). Some design documents can be completed during this period, and some design documents have to be completed until the later stage of design, such as instrument index, instrument loop diagram, etc.
2 The design documents listed in the figure do not necessarily have to be completed for a specific engineering project, and the relevant design documents can be compiled (drawn) as needed. If pneumatic instruments are used in the design, the design documents should add relevant drawings, which are not included in this procedure.
3 The automatic control design conditions submitted by the chemical process specialty have two forms, one is the process flow chart and process description, material balance table, main control description and other design data, and the other is the "instrument condition table". Both forms are acceptable to the automatic control specialty.
4 The coordination work of instrument procurement begins in the basic engineering design stage, such as providing the "instrument design regulations" to the procurement department, recommending and evaluating instrument inquiry manufacturers, etc. 5 The instrument positioning meeting is generally held together with the model review meeting (equipment, piping model). For engineering items that do not carry out model design, the instrument positioning meeting is often not formally held. The positioning of the instrument is determined by the automatic control specialty and the pipeline specialty to exchange design drawings, tables and mutual consultation. 6 The program diagram does not include the design documents required for DCS application configuration. This type of design document is compiled (drawn) according to needs after the engineering design is completed. When compiling (drawing), it should comply with the provisions of Article 4.5.3 of "Tasks of Automatic Control Professional Engineering Design" (HG/T20636.6).
Standard exchange network
csoae.con Various standard industry materials are free to download program projects
Only agricultural design new parts
Only work in the service and reform department
Home exchange equipment cases
Design topic
Collection of design requirements
Process force demonstration meeting
Base code engineering design stage
(cloth)(number(exploration)(ground gas)(type 5 special(this(X
Complete equipment pulse science gas parts manufacturing
B quality P&ID world certificate
C version P&
ID period household learning
Automation professional engineering design stage work procedure diagram electricity fee||t t||Shengyi won the request
(Equipment) (Electrical)
Electrical lock
Equipment layout
Detailed engineering design stage
Instrument positioning will allow
Continued Figure 2.0.1
Automatic control professional engineering design stage work procedure graphics
(Professional service)
Data namebzxZ.net
Instrument fee professional other than it
Professional dial work
Instrument inspection professional work
You can receive the evaluation of the sugar change
Show bacteria when providing
When using DCS, the research results are provided
All kinds of standard industry information are free to download
The number of mice is one of
Room self-view
All kinds of standard industry information free download
Quan Soso.com
All kinds of standard industry information free download
Quankong Photography
Telephone reply number
Standard exchange network:
Study cloth tour cleaning engineering
Standard exchange network
Standard exchange network
All kinds of standard industry information free download
Brief description of instrument procurement procedures
Attachment B
B.1 General
B.1.1 Engineering procurement is closely related to engineering design. There are many links in the procurement process that need to be connected with the design process. This procurement process diagram only describes the entire process of procurement work steps, and this brief description only describes the main links of instrument designers cooperating with procurement work to ensure that the purchased goods meet the requirements of instrument design and the needs of engineering construction.
B.2 Preparation of procurement technical documents
B.2. 1 The procurement technical document (commonly known as MR) is a document in which the designer puts forward the specifications, materials, technical performance, quantity and quality requirements for the products supplied by the supplier. It consists of the following documents: Instrument purchase order (REQUISITION FOR INSTRUMENT) 1
2 Instrument design specification (SPECIFICATION FOR INSTRUMENT DESIGN) 3 Instrument technical specification (SPECFICATION FOR INSTRUMENT) 4 Instrument data sheet (INSTRUMENT DATA SHEET) 5 Instrument inspection and test regulations (INSPECTION AND TEST FOR INSTRUMENT) B.2.2 The preparation of procurement technical documents shall comply with the following provisions: 1 The instrument purchase order is a unified provision for engineering procurement. The professional design person in charge shall prepare the instrument purchase order for the engineering project according to the provisions of "Preparation of Instrument Purchase Order" (HG/T20637.5). Engineering designers should fill in and select relevant contents according to different types of products. 2. Instrument design regulations are unified regulations for engineering design. They are prepared by the professional person in charge according to the requirements of "Preparation of Instrument Design Regulations" (HG/T20637.3) based on the specific requirements for the instrument profession in the design contract or contracting contract of the project and the characteristics of chemical process production (based on the commencement report), and are issued after being signed by the chief engineer, design manager or project manager. It is only applicable to suppliers when the unit is delivered as a package (PACKAGE): to ensure that the instrument selection is consistent.
3. Instrument technical specifications are common technical requirements for this type of instrument. According to "Preparation of Instrument Technical Specifications", various standard industry materials can be downloaded for free.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Standard Jiejie.com bzso8o:com Free download of various American standard industry materials 1.0.1
1 General Principles
In order to implement the international general design system and methods, and provide the standard for the engineering design of the automatic control professional designers, this regulation is specially formulated
1.0.2 This regulation applies to the various design work of the automatic control professional carried out in the engineering design stage (including the basic engineering design stage and the detailed engineering design stage) and the work procedures of the procurement of instruments and installation materials. 1.0.3 The relevant standards are as follows:
HG20557
HG/T20636.6
"Regulations on Process System Design Management"
"Tasks of Automatic Control Professional Engineering Design"
When implementing this regulation, it should also comply with the provisions of the relevant current national standards. 73
Standard exchange network
oae.com Class standard industry data free download 2 Work procedures
2.0.1 The engineering design procedure of the automatic control specialty should comply with the requirements of the "Working procedure diagram of the engineering design stage of the automatic control specialty" (Figure 2.0.1).
The working procedure diagram reflects the various design tasks to be carried out by the automatic control specialty during each version of P&ID, and its work content description should comply with the provisions of "Tasks of engineering design of the automatic control specialty" (HG/T206366). 2.0.2 Work procedure diagram description:
1 The various design documents listed during each version of P&ID in the figure indicate the time of starting to compile (draw). Some design documents can be completed during this period, and some design documents have to be completed until the later stage of design, such as instrument index, instrument loop diagram, etc.
2 The design documents listed in the figure do not necessarily have to be completed for a specific engineering project, and the relevant design documents can be compiled (drawn) as needed. If pneumatic instruments are used in the design, the design documents should add relevant drawings, which are not included in this procedure.
3 The automatic control design conditions submitted by the chemical process specialty have two forms, one is the process flow chart and process description, material balance table, main control description and other design data, and the other is the "instrument condition table". Both forms are acceptable to the automatic control specialty.
4 The coordination work of instrument procurement begins in the basic engineering design stage, such as providing the "instrument design regulations" to the procurement department, recommending and evaluating instrument inquiry manufacturers, etc. 5 The instrument positioning meeting is generally held together with the model review meeting (equipment, piping model). For engineering items that do not carry out model design, the instrument positioning meeting is often not formally held. The positioning of the instrument is determined by the automatic control specialty and the pipeline specialty to exchange design drawings, tables and mutual consultation. 6 The program diagram does not include the design documents required for DCS application configuration. This type of design document is compiled (drawn) according to needs after the engineering design is completed. When compiling (drawing), it should comply with the provisions of Article 4.5.3 of "Tasks of Automatic Control Professional Engineering Design" (HG/T20636.6).
Standard exchange network
csoae.con Various standard industry materials are free to download program projects
Only agricultural design new parts
Only work in the service and reform department
Home exchange equipment cases
Design topic
Collection of design requirements
Process force demonstration meeting
Base code engineering design stage
(cloth)(number(exploration)(ground gas)(type 5 special(this(X
Complete equipment pulse science gas parts manufacturing
B quality P&ID world certificate
C version P&
ID period household learning
Automation professional engineering design stage work procedure diagram electricity fee||t t||Shengyi won the request
(Equipment) (Electrical)
Electrical lock
Equipment layout
Detailed engineering design stage
Instrument positioning will allow
Continued Figure 2.0.1
Automatic control professional engineering design stage work procedure graphics
(Professional service)
Data namebzxZ.net
Instrument fee professional other than it
Professional dial work
Instrument inspection professional work
You can receive the evaluation of the sugar change
Show bacteria when providing
When using DCS, the research results are provided
All kinds of standard industry information are free to download
The number of mice is one of
Room self-view
All kinds of standard industry information free download
Quan Soso.com
All kinds of standard industry information free download
Quankong Photography
Telephone reply number
Standard exchange network:
Study cloth tour cleaning engineering
Standard exchange network
Standard exchange network
All kinds of standard industry information free download
Brief description of instrument procurement procedures
Attachment B
B.1 General
B.1.1 Engineering procurement is closely related to engineering design. There are many links in the procurement process that need to be connected with the design process. This procurement process diagram only describes the entire process of procurement work steps, and this brief description only describes the main links of instrument designers cooperating with procurement work to ensure that the purchased goods meet the requirements of instrument design and the needs of engineering construction.
B.2 Preparation of procurement technical documents
B.2. 1 The procurement technical document (commonly known as MR) is a document in which the designer puts forward the specifications, materials, technical performance, quantity and quality requirements for the products supplied by the supplier. It consists of the following documents: Instrument purchase order (REQUISITION FOR INSTRUMENT) 1
2 Instrument design specification (SPECIFICATION FOR INSTRUMENT DESIGN) 3 Instrument technical specification (SPECFICATION FOR INSTRUMENT) 4 Instrument data sheet (INSTRUMENT DATA SHEET) 5 Instrument inspection and test regulations (INSPECTION AND TEST FOR INSTRUMENT) B.2.2 The preparation of procurement technical documents shall comply with the following provisions: 1 The instrument purchase order is a unified provision for engineering procurement. The professional design person in charge shall prepare the instrument purchase order for the engineering project according to the provisions of "Preparation of Instrument Purchase Order" (HG/T20637.5). Engineering designers should fill in and select relevant contents according to different types of products. 2. Instrument design regulations are unified regulations for engineering design. They are prepared by the professional person in charge according to the requirements of "Preparation of Instrument Design Regulations" (HG/T20637.3) based on the specific requirements for the instrument profession in the design contract or contracting contract of the project and the characteristics of chemical process production (based on the commencement report), and are issued after being signed by the chief engineer, design manager or project manager. It is only applicable to suppliers when the unit is delivered as a package (PACKAGE): to ensure that the instrument selection is consistent.
3. Instrument technical specifications are common technical requirements for this type of instrument. According to "Preparation of Instrument Technical Specifications", various standard industry materials can be downloaded for free.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 19568-2004 Specification for assembly and installation of wind turbine generator sets
- CB/T 1208-1992 Guidelines for the compilation of reliability assurance outlines for ship products
- YC/T 178-2003 Determination of whole and broken tobacco percentages
- JB/T 6326.7-1992 Chemical analysis methods for nickel-chromium alloys - Chrome azurol S photometric method for determination of aluminum content
- GB/T 11798.9-2001 Technical requirements for the verification of motor vehicle safety testing equipment Part 9: Technical requirements for the verification of flat brake test benches
- GB 5007.2-2001 Information technology Chinese coded character set (auxiliary set) 24-dot matrix font
- QB/T 2578-2002 陶瓷原料化学成分光度分析方法
- GB/T 4920-1985 Determination of sulfuric acid mist in sulfuric acid concentrated tail gas - Barium chromate colorimetric method
- QB/T 1763-1993 日用陶瓷机械产品型号编制方法
- CB/T 749-1997 Fixed steel shutters
- GA/T 75-1994 Safety engineering procedures and requirements
- GB/T 15914-1995 Energy-saving monitoring method for steam heating equipment
- GB/T 14551-2003 Determination of 666 and DDT in animals and plants by gas chromatography
- JB/T 10231.8-2002 Tool product testing methods Part 8: Dies
- HG 2958.4-1988 Determination of calcium and magnesium content in celestite ore by atomic absorption spectrometry
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com