Packaging-Complete, filled transport packages-Water spray test

time: 2024-08-05 04:00:13
  • GB/T 4857.9-1992
  • Abolished

Basic Information

standard classification number

  • Standard ICS number:

    Packaging and transportation of goods>>55.020 Packaging and transportation of goods
  • China Standard Classification Number:

    General>>Marking, packaging, transportation, storage>>A83 packaging method

associated standards

Publication information

  • publishing house:

    China Standard Press
  • Publication date:

    1993-02-01

Other Information

  • Release date:

    1986-02-13
  • Review date:

    2004-10-14
  • Drafting Organization:

    Standard Metrology Institute of Ministry of Railways
  • Focal point Organization:

    National Packaging Standardization Technical Committee
  • Publishing Department:

    State Bureau of Technical Supervision
  • Competent Authority:

    National Standardization Administration
Introduction to standardsDescription (Translated English) / download

Skip to download

Summary:

This standard specifies the main performance requirements, test procedures and test report contents of the test equipment used in the spray test of transport packages. This standard is applicable to the assessment of the resistance of transport packages to rain and the protection of the contents by the packaging. It can be used as a single test or as part of a series of tests. GB/T 4857.9-1992 Spray test method for packaging transport packages GB/T4857.9-1992 Standard download decompression password: www.bzxz.net
This standard specifies the main performance requirements, test procedures and test report contents of the test equipment used in the spray test of transport packages. This standard is applicable to the assessment of the resistance of transport packages to rain and the protection of the contents by the packaging. It can be used as a single test or as part of a series of tests.


Standard contentStandard content

Some standard content:

National Standard of the People's Republic of China
Packaging-Transport Packages
Spray Test Method
Packaging-Complete, filled transport packages-Water spray test
GB/T4857.9-—92
Replaces GB 4857.9--86
This standard is equivalent to ISO2875-1985 "Packaging-Complete, filled transport packages-Spray test". 1 Subject content and scope of application
This standard specifies the main performance requirements, test procedures and test report contents of the test equipment used in the spray test of transport packages.
This standard is applicable to the assessment of the resistance of transport packages to rain and the protection of the packaging to the contents. It can be used as a single test or as part of a series of tests. 2 Reference standards
GB/T4857.1 Method of marking various parts during the test of packaging and transportation packages GB/T4857.2 Temperature and humidity adjustment treatment of packaging and transportation packages GB/T4857.17 Preparation of performance test outline for packaging and transportation packages General principles 3 Test principles
Place the test sample on the test site and spray it with water at a certain temperature for a predetermined time and rate. 4 Test equipment
4.1 Test site
The area of ​​the test site should be at least 50% larger than the bottom area of ​​the test sample, so that the test sample is within the spraying area. If it is necessary to control the temperature of the test site, the site can be insulated or heated. The site floor should be equipped with a grid floor and a drainage port of sufficient capacity so that the sprayed water can be automatically drained away and the test sample will not be soaked in water. The height of the test site should be appropriate so that the distance between the water nozzle and the top of the test package is at least 2m to ensure that the water can drip vertically.
4.2 Spraying device
The spraying device should meet the water spraying rate of 100±20L/(m2·h). The sprayed water should be fully uniform, and the height of the nozzle should be adjustable so that the distance between the nozzle and the top of the test sample can be at least 2m. 5 Calibration
Install the nozzle 2m above the grid floor surface. Place several identical top-opening containers evenly on the floor, requiring that they should cover at least 25% of the floor area. The top opening area of ​​each container should be between 0.25 and 0.5m2. Its height should be between 0.25 and 0.5m. National Technical Supervision Approved on April 4, 1992Www.bzxZ.net
Implementation on February 1, 1993
GB/T 4857.9—92
Then turn on the nozzle and measure the time it takes for the first and last containers to be filled with water. The time required to fill the first container with water shall not be less than the time required to spray water at a rate of 120L/(m2·h); the time required to fill the last container with water shall not be more than the time required to spray water at a rate of 80L/(m2h). 6 Test procedure
6.1 Preparation of test samples
Prepare the test samples in accordance with the requirements of GB/T4857.17. 6.2 Numbering of various parts of the test samples
Number various parts of the test samples in accordance with the provisions of GB/T4857.1. 6.3 Pretreatment of test samples
Select a condition for pretreatment in accordance with the requirements of GB/T4857.2. If the same conditions cannot be achieved, the test must be carried out under atmospheric conditions that are as close as possible.
6.4 Test steps
6.4.1 Adjust the height of the nozzle so that the distance between the nozzle and the nearest point on the top of the test package is at least 2m. Turn on the nozzle until the entire system reaches a balanced state. Unless otherwise specified, the temperature of the water spray and the test site temperature should be between 5°C and 30°C. 6.4.2 After the water sprayed by the entire system reaches stability, place the test sample. 6.4.3 Place the test sample in the center of the test site so that water can fall on the test sample according to the calibration standard and spray continuously for a predetermined time.
6.4.4 Check the tested package and its contents to see if there is any degradation of waterproof performance or water seepage. 7 Test Report
The test report should include the following contents:
The name, specification, model, quantity, etc. of the contents of the package: the number of test samples;
Detailed description of the name, size, structure and material specifications of the packaging container, accessories, cushioning pads, supports, fixing methods, seals, bundling status and other protective measures
The mass of the test samples and contents, in kilograms; the name and code of the standards cited during the test: the temperature, relative humidity and time during the temperature and humidity adjustment treatment, the temperature of the test site and the temperature of the water; the location of the package on the test site;
The name and model of the equipment and instruments used in the test; the duration of the test;
The record of the test results, and any phenomena observed that can help to correctly interpret the test results; the test date, the signature of the test personnel, and the seal of the testing unit. 277
Additional Notes:
GB/T 4857.9—92
This standard was proposed by the Ministry of Railways of the People's Republic of China. This standard is under the jurisdiction of the Standardization and Metrology Research Institute of the Ministry of Railways. This standard was drafted by the Standardization and Metrology Research Institute of the Ministry of Railways. The main drafters of this standard are Wang Jugang and Zhang Jin. 278
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]