您好,欢迎来到标准下载网!
热搜: 医疗器械 风险管理对医疗器械的应用 建筑工程施工质量验收统一标准 标准化经济效果的论证方法
NB/T 20405-2017.Code of management of engineering contracting nuclear power plant. 1范围 NB/T 20405规定了核电工程建设期间的工程总承包管理要求。 NB/T 20405适用于核电建设项目工程总承包合同签订后,
NB/T 20397-2017.Technical regulations for the prefabrication and installation of piping supports and hangers in pressurized water reactor nuclear powe
NB/T 20398-2017.Construction and inspection specification for reactor building internal structure of PWR nuclear power plant. 1范围 NB/T 20398规定了压水堆核电厂反
NB/T 20369-2016.The establishment and implementation of severe accident management guidance for nuclear power plant. 1范围 NB/T 20369规定了核电厂严重事故管理导则(SAMG
NB/T 20370-2016.Nuclear island general layout criteria for passive PWR nuclear power plant major systems. 1范围 NB/T 20370规定了非能动乐水堆核电厂核岛主要系统、设备和|管道布置的总体
NB/T 20371-2016.Specification for pressurizer installation in PWR nuclear power plant. 1范围 NB/T 20371规定了压水堆核电厂建造期问反应堆冷却剂系统稳压器安装的技术要求和验收要求。 NB/T 20371适
NB/T 20395-2017.Design for habitability of the main control room. 1范围 NB/T 20395规定了压水堆核电厂主控制室可居留性设计的基本要求。 NB/T 20395适用于压水堆核电厂主控制室的可居留性的设计,其他核设施的主控制室可居
NB/T 20396-2017.Code for Construction of nuclear safety related steel structures for pressure water reactor nuclear power plant. 1范围 NB/T 20396规定了压水堆核
NB/T 20313-2014.Documentation system of operating nuclear power plant. 1范围 NB/T 20313规定了核电厂运行文件的种类、编制原则、编制内容和文件的审批等,可用于核电厂从工程建设阶段转运行阶段时以及运行期间建立生产运行相关的
NB/T 20354.2-2014.Design and manufactering specification of steam turbine rotor for pressurized water reactor nuclear power plant-Part 2: Shrunk rotor
NB/T 20354.3-2014.Design and manufactering specification of steam turbine rotors for pressurized water reactor nuclear power plant-Part 3: Welded roto
NB/T 20368-2016.Modification management for nuclear power plant. 1范围 NB/T 20368适用于核电厂运行阶段的变更管理。 NB/T 20368规定了核电厂运行阶段对核电厂构筑物、系统和设备、运行限值和条件、规程和软件、管理体系、运
CopyRight 2024 www.bzxz.net All Rights Reserved 湘ICP备2023016450号-1