您好,欢迎来到标准下载网!全站导航 ↗
标准下载网WWW.BZXZ.NET
标准下载网/辅助车道车速

辅助车道车速

辅助车道车速

辅助车道车速

文件语言 英语 全文 6 页 格式 PDF
辅助车道车速 辅助车道车速封面

标准信息

STANDARD INFORMATION
标准编号
辅助车道车速
所属分类
其他国外标准与工程资料
文件语言
英语
文件格式
PDF
文件页数
6 页
文件大小
123.23 KB

· 更新:

标准简介

OVERVIEW

中文简介

标准 辅助车道车速 的预览内容

English summary

Preview of standard 辅助车道车速

以上为根据文件整理的内容简介。

标准内容预览

DOCUMENT PREVIEW
点击页码切换内容
辅助车道车速PDF 第 1 页 · 原页码 1

Lateral Clearances

Bridge railings located on the inside of horizontal curves may restrict stopping sight distance. Adjustment of the horizontal alignment or the offset to the bridge railing may be needed to provide adequate stopping sight distance.

On overpass structures, it is desirable to carry the full width of the approach roadway across all structures. For facilities other than freeways, exception may be made on major structures with a high unit cost. The selection of cross-section dimensions that are different from those on the approach roadway should be subject to individual economic studies. Refer to previous chapters on arterials, collectors, and local roads and streets for permissible deviations from providing full approach roadway width across bridges. In the case of a curbed roadway, the minimum structure width should match the curbed approach roadway.

When the full approach roadway width is continued across the structure, the parapet rail, both left and right, should align with the guardrail on the approach roadway. For example, where the typical practice of the highway agency is to place the longitudinal barrier 0.6 m [2 ft] from the outer edge of the surfaced shoulder, the bridge rail should be placed 0.6 m [2 ft] outside the effective edge of the shoulder. This provides additional clearance for high-speed operation and door-opening space for vehicles stopped on the shoulder of the structure. Some agencies prefer to place the roadway longitudinal barrier 0.6 m [2 ft] from the outer edge of the shoulder and the bridge rail at the shoulder edge. In this case, a transition rate of about 20:1 is appropriate to taper the longitudinal barrier into the bridge rail.

At some interchanges, additional width for speed-change lanes or weaving sections is needed across overpass structures. Where the auxiliary lane is a continuation of a ramp, the horizontal clearance to the bridge rail should be at least equal to the width of shoulder on the approach ramp. Where the auxiliary lane is a weaving lane connecting entrance and exit ramps or is a parallel-type speed-change lane across the entire structure, the clearance to the parapet should be of uniform width and be at least equal to the shoulder width on the ramp.

Medians

On a divided highway with a wide median or one being developed in stages, the overpass will likely be built as two parallel structures. The approach width of each roadway should be carried across each individual structure. If separate parallel structures are used, the width of opening between structures is unimportant.

Where the approach is a multilane, undivided roadway or one with a flush median less than 1.2-m [4-ft] wide, a raised median is considered unnecessary on short bridges of about 30 m [100 ft] in length but is desirable on bridges of 120 m [400 ft] or more in length. On bridges between 30 m [100 ft] and 120 m [400 ft] in length, local conditions such as traffic volume, speed, sight distance, need for luminaire supports, future improvement, approach cross section,

6

1
第 1 / 6 页

预览内容由文件识别整理,表格、公式及文字请以原始文件为准。

原文图片预览

PAGE IMAGES

下载标准文件

辅助车道车速

英语 · PDF · 6 页 · 123.23 KB

前往网盘下载 ↗
辅助车道车速英语 · PDF
下载文件 ↓