您好,欢迎来到标准下载网!全站导航 ↗
标准下载网WWW.BZXZ.NET
标准下载网/AASHTO T106-02(ASTM C109-109M-99)

AASHTO T106-02(ASTM C109-109M-99)

AASHTO T106-02(ASTM C109-109M-99)

AASHTO T106-02(ASTM C109-109M-99)

文件语言 英语 全文 6 页 格式 PDF
AASHTO T106-02(ASTM C109-109M-99) AASHTO T106-02(ASTM C109-109M-99)封面

标准信息

STANDARD INFORMATION
标准编号
AASHTO T106-02(ASTM C109-109M-99)
所属分类
AASHTO 美国公路与运输标准
文件语言
英语
文件格式
PDF
文件页数
6 页
文件大小
191.64 KB

· 更新:

标准简介

OVERVIEW

中文简介

标准 AASHTO T106-02(ASTM C109-109M-99) 的预览内容

English summary

Preview of standard AASHTO T106-02(ASTM C109-109M-99)

以上为根据文件整理的内容简介。

标准内容预览

DOCUMENT PREVIEW
点击页码切换内容
AASHTO T106-02(ASTM C109-109M-99)PDF 第 1 页 · 原页码 1

Table 2—Mixing Proportions for 2-in. Cubes

No. of Specimens
69
Cement, g500740
Sand, g13752035
Water, mL.
Portland (0.485)242359
Air-entraining portland (0.460)230340
Other (to flow of 110 ± 5)——

10.2. Preparation of Mortar:

10.2.1. Mechanically mix in accordance with the procedure given in T 162.

10.3. Determination of Flow:

10.3.1. Carefully wipe the flow-table top clean and dry, and place the flow mold at the center. Place a layer of mortar about 25 mm (1 in.) in thickness in the mold and tamp 20 times with the tamper. The tamping pressure shall be just sufficient to ensure uniform filling of the mold. Then fill the mold with mortar and tamp as specified for the first layer. Cut off the mortar to a plane surface, flush with the top of the mold, by drawing the straight edge of a trowel (held nearly perpendicular to the mold) with a sawing motion across the top of the mold. Wipe the table top clean and dry, being especially careful to remove any water from around the edge of the flow mold. Lift the mold away from the mortar 60 seconds after completing the mixing operation. Immediately, drop the table through a height of 13 mm (1/2 in.) 25 times in 15 seconds. Using the calipers, determine the flow by measuring the diameters of the mortar along the lines scribed in the table top, adding the four readings. The total of the four readings from the calipers equals the percent increase of the original diameter of the mortar.

10.3.2. For portland and air-entraining portland cements, merely record the flow.

10.3.3. In the case of cements other than portland or air-entraining cements, make trial mortars with varying percentages of water until the specified flow is obtained. Make each trial with fresh mortar.

10.4. Molding Test Specimens:

10.4.1. Immediately following completion of the flow test, return the mortar from the flow table to the mixing bowl. Quickly scrape the bowl sides and transfer into the batch the mortar that may have collected on the side of the bowl and then remix the entire batch 15 seconds at medium speed. Upon completion of mixing the mixing paddle shall be shaken to remove excess mortar into the mixing bowl.

10.4.2. When a duplicate batch is to be made immediately for additional specimens, the flow test may be omitted and the mortar allowed to stand in the mixing bowl 90 seconds without covering. During the last 15 seconds of this interval, quickly scrape the bowl sides and transfer into the batch the mortar that may have collected on the side of the bowl. Then remix for 15 seconds at medium speed.

6

1
第 1 / 6 页

预览内容由文件识别整理,表格、公式及文字请以原始文件为准。

原文图片预览

PAGE IMAGES

下载标准文件

AASHTO T106-02(ASTM C109-109M-99)

英语 · PDF · 6 页 · 191.64 KB

前往网盘下载 ↗
AASHTO T106-02(ASTM C109-109M-99)英语 · PDF
下载文件 ↓