Principles and procedures for return of submitted standards drafts for approval
time:
2024-07-13 22:05:35
- SJ 1.9-1987
- in force
Standard ID:
SJ 1.9-1987
Standard Name:
Principles and procedures for return of submitted standards drafts for approval
Chinese Name:
电子工业技术标准制修订工作有关规定和要求 标准草案(报批稿)报批审查时退稿的原则和程序
Standard category:
Electronic Industry Standard (SJ)
-
Date of Release:
1987-11-12 -
Date of Implementation:
1988-01-01
China Standard Classification Number:
General>>Standardization Management and General Provisions>>A01 Technical Management

Skip to download
Summary:
SJ 1.9-1987 Regulations and requirements for the formulation and revision of technical standards for the electronics industry Principles and procedures for the rejection of draft standards (drafts for approval) during review and approval SJ1.9-1987 standard download decompression password: www.bzxz.net

Some standard content:
Subject content and scope of application
Ministry Standard of the Ministry of Electronics Industry of the People's Republic of China Revision of technical standards for the electronic industry
Related regulations and requirements
Principles and procedures for returning draft standards (drafts for approval) when submitted for approval
SJ1.9—87
This standard specifies the principles and procedures for the Ministry's Standardization Research Institute to review the draft standards (drafts for approval) submitted by the sponsor and decide to return them to the sponsor for rework and revision after reviewing them. This standard applies to national standards, national military standards, professional standards (ministerial standards) and ministry guiding technical documents in the technical standards for the electronic industry. bZxz.net
2 Principles of manuscript rejection
Before the draft standard (draft for approval) is submitted to the standard approval department, if any of the following situations are found during the technical (including standardization) review of the Ministry's Standardization Research Institute, the manuscript will be rejected: 2.1 Incomplete submission materials;
2.2 Incomplete relevant signing procedures;
2.3 The draft standard (draft for approval) has major principle issues (such as: violation of relevant laws, regulations and policies of my country, incomplete or erroneous technical content, inconsistency with relevant standards, or inconsistent with my country or relevant professional standards; 2.4 The referenced standards are incomplete or incorrect: 2.5 The standard text does not meet the submission and publication requirements (such as: unclear, the format does not meet the requirements, the terminology and text are not standardized and the modification workload is large, the ink line drawings used for illustration plate making do not meet the plate making requirements, etc.); 2.6 The content of other relevant documents and materials does not meet the requirements 3 Rejection Procedures
3.1 The Ministry of Standardization Research Institute has the right to decide whether to reject the manuscript based on the review results. If it decides to reject the manuscript, there should be a rejection notice from the Ministry of Standardization Research Institute.
3.2 The rejection notice from the Ministry of Standardization Research Institute should be issued within one and a half months after receiving the relevant information from the sponsor, and sent to the sponsor, and copied to the Ministry of Standards and Quality Department at the same time. Approved by the Ministry of Electronics Industry of the People's Republic of China on November 10, 1987 and implemented on January 1, 1988
SJ 1.9-87
3.3 The sponsor shall make modifications according to the requirements of the rejection notice issued by the Ministry's Standardization Research Institute and prepare an official document to explain the modifications. It shall be submitted to the Ministry's Standardization Research Institute again within the time limit specified in the rejection notice, with a copy to the Ministry's Standards and Quality Department. 3,4 If the sponsor has any objection to the modification requirements proposed in the rejection notice issued by the Ministry's Standardization Research Institute, it shall prepare an official document to explain the reasons for not accepting it, report it to the Ministry's Standards and Quality Department, and copy it to the Ministry's Standardization Research Institute. The Ministry's Standards and Quality Department shall make the final decision.
3.5 If the standard approval department decides that the draft standard needs to be rejected for modification during the approval process, the Ministry's Standardization Research Institute shall handle it at its discretion or promptly notify the sponsor to make the modification. Additional notes:
This standard was drafted by the Ministry's Standards and Quality Department and the Standardization Research Institute. 2
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Ministry Standard of the Ministry of Electronics Industry of the People's Republic of China Revision of technical standards for the electronic industry
Related regulations and requirements
Principles and procedures for returning draft standards (drafts for approval) when submitted for approval
SJ1.9—87
This standard specifies the principles and procedures for the Ministry's Standardization Research Institute to review the draft standards (drafts for approval) submitted by the sponsor and decide to return them to the sponsor for rework and revision after reviewing them. This standard applies to national standards, national military standards, professional standards (ministerial standards) and ministry guiding technical documents in the technical standards for the electronic industry. bZxz.net
2 Principles of manuscript rejection
Before the draft standard (draft for approval) is submitted to the standard approval department, if any of the following situations are found during the technical (including standardization) review of the Ministry's Standardization Research Institute, the manuscript will be rejected: 2.1 Incomplete submission materials;
2.2 Incomplete relevant signing procedures;
2.3 The draft standard (draft for approval) has major principle issues (such as: violation of relevant laws, regulations and policies of my country, incomplete or erroneous technical content, inconsistency with relevant standards, or inconsistent with my country or relevant professional standards; 2.4 The referenced standards are incomplete or incorrect: 2.5 The standard text does not meet the submission and publication requirements (such as: unclear, the format does not meet the requirements, the terminology and text are not standardized and the modification workload is large, the ink line drawings used for illustration plate making do not meet the plate making requirements, etc.); 2.6 The content of other relevant documents and materials does not meet the requirements 3 Rejection Procedures
3.1 The Ministry of Standardization Research Institute has the right to decide whether to reject the manuscript based on the review results. If it decides to reject the manuscript, there should be a rejection notice from the Ministry of Standardization Research Institute.
3.2 The rejection notice from the Ministry of Standardization Research Institute should be issued within one and a half months after receiving the relevant information from the sponsor, and sent to the sponsor, and copied to the Ministry of Standards and Quality Department at the same time. Approved by the Ministry of Electronics Industry of the People's Republic of China on November 10, 1987 and implemented on January 1, 1988
SJ 1.9-87
3.3 The sponsor shall make modifications according to the requirements of the rejection notice issued by the Ministry's Standardization Research Institute and prepare an official document to explain the modifications. It shall be submitted to the Ministry's Standardization Research Institute again within the time limit specified in the rejection notice, with a copy to the Ministry's Standards and Quality Department. 3,4 If the sponsor has any objection to the modification requirements proposed in the rejection notice issued by the Ministry's Standardization Research Institute, it shall prepare an official document to explain the reasons for not accepting it, report it to the Ministry's Standards and Quality Department, and copy it to the Ministry's Standardization Research Institute. The Ministry's Standards and Quality Department shall make the final decision.
3.5 If the standard approval department decides that the draft standard needs to be rejected for modification during the approval process, the Ministry's Standardization Research Institute shall handle it at its discretion or promptly notify the sponsor to make the modification. Additional notes:
This standard was drafted by the Ministry's Standards and Quality Department and the Standardization Research Institute. 2
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB 4706.43-1999 Safety of household and similar electrical appliances Particular requirements for projectors and similar appliances
- QB/T 2733-2005 Wire connection tools - Manual mechanical crimping pliers
- HY/T 062-2002 Hollow fiber ultrafiltration membrane module
- GB/T 15936.10-1996 Information processing text and office systems Office document architecture (ODA) and exchange formats Part 10: Formal specification
- QB/T 1290.5-1991 Steel Hammer Inspection Hammer
- GB/T 15510-1995 控制用电磁继电器可靠性试验通则
- SJ 20245-1993 Low frequency phase meter verification procedure
- QB/T 1586.4-1992 Aluminum alloy profiles for luggage hardware accessories boxes
- GB 485-1984 Chloropicrin
- GB 19082-2003 Technical requirements for disposable medical protective clothing
- HG/T 2569-1994 Activated clay
- JB/T 8332.2-1996 Technical requirements for heavy-duty deep hole boring and drilling machines
- JB/T 7227-1994 Composite heat source heat pump type screw chiller
- JB/T 53319-1999 Instant noodles production line product quality classification
- GB 8787-1988 Diagnostic criteria and treatment principles for occupational acute phosgene poisoning
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]