JB/T 6295-1993 Installation type and connection dimensions of plunger injection pumps
time:
2024-07-01 09:18:24
- JB/T 6295-1993
- Abolished
Standard ID:
JB/T 6295-1993
Standard Name:
Installation type and connection dimensions of plunger injection pumps
Chinese Name:
柱塞式喷油泵 安装型式及连接尺寸
Standard category:
Machinery Industry Standard (JB)
-
Date of Implementation:
1994-01-01 -
Date of Expiration:
2005-11-01
China Standard Classification Number:
Machinery>>Piston Internal Combustion Engine and Other Power Equipment>>J94 Fuel Heating System
alternative situation:
Replaced by JB/T 6295-2005
Skip to download
Summary:
JB/T 6295-1993 Installation type and connection dimensions of plunger injection pump JB/T6295-1993 standard download decompression password: www.bzxz.net
Some standard content:
Mechanical Industry Standard of the People's Republic of China
JB/T 6295-1993
Plunger fuel injection pump
Installation type and connection dimensions
Published on July 29, 1993
Implemented on January 1, 1994
Plunger fuel injection pump
Installation type and connection dimensions
Subject content and scope of application
This standard specifies the installation type and connection dimensions of the connection part between the plunger fuel injection pump and the diesel engine. This standard applies to plunger fuel injection pumps (hereinafter referred to as injection pumps) for medium and small power diesel engines. Cited standards
ZBJ94009 Camshaft end dimensions of diesel engine fuel injection pump 3 Fuel injection pump installation type and connection dimensions
3.1 Split type fuel injection pump installation type and connection dimensions 3.1.1 Single-cylinder split type fuel injection pump installation type and connection dimensions See Figure 1 and Table 1. Type 1
Approved by the Ministry of Machinery Industry on July 29, 1993
Implementation on January 1, 1994
Flange type
a, b, d
JB/T6295-1993
Double-cylinder split type fuel injection pump installation type and connection dimensions See Figure 2 and Table 2. Figure 2
According to the technical agreement
54 or 56
Installation type and connection dimensions of multi-cylinder synthetic fuel injection pump 3.2
3.2.1 The installation and connection dimensions of the fuel injection pump of the end flange installation type are shown in Figure 3 to Figure 6 and Table 3 to Table 6. 3
68 or 85
JB/T6295-1993
JB/T6295-1993
95 or 107
JB/T6295-1993
10,8min
3.2.2 The installation and connection dimensions of the fuel injection pump of the bracket installation type a. The installation and connection dimensions of the fuel injection pump of the arc bottom installation type are shown in Figure 7 and Table 7. Figure 7
248 or 252
240×2
JB/T6295-1993
8.5 or 9.5
84 or 100
Note: 1) and 2) are only applicable to B and B type old product injection pumps. 9 or 11
(10 or 12)1)wwW.bzxz.Net
(12)2)
24.5±1 or 30±1
39.5±1 or 43±1
b. For the installation and connection dimensions of the flat bottom installation type injection pump, see Figure 8, Figure 9 and Table 8.
20 or 26
26 or 38
JB/T6295-1993
In addition to the above installation types and connection dimensions, if the user has other special requirements, it should be clearly specified in the technical agreement between the supply and demand parties. 3.2.3 The installation connection dimensions of the camshaft drive end of the injection pump and the coupling connection part shall comply with the relevant provisions of ZBJ94009. The connection dimensions of the oil pump outlet valve seat
The connection dimensions of the oil pump outlet valve seat are shown in Figure 10 and Table 9 Figure 10
Additional instructions:
5-1993
JB/T6295
This standard is proposed and managed by the Wuxi Oil Pump Nozzle Research Institute of the Ministry of Machinery Industry. This standard is drafted by the Wuxi Oil Pump Nozzle Research Institute, a(°)
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
JB/T 6295-1993
Plunger fuel injection pump
Installation type and connection dimensions
Published on July 29, 1993
Implemented on January 1, 1994
Plunger fuel injection pump
Installation type and connection dimensions
Subject content and scope of application
This standard specifies the installation type and connection dimensions of the connection part between the plunger fuel injection pump and the diesel engine. This standard applies to plunger fuel injection pumps (hereinafter referred to as injection pumps) for medium and small power diesel engines. Cited standards
ZBJ94009 Camshaft end dimensions of diesel engine fuel injection pump 3 Fuel injection pump installation type and connection dimensions
3.1 Split type fuel injection pump installation type and connection dimensions 3.1.1 Single-cylinder split type fuel injection pump installation type and connection dimensions See Figure 1 and Table 1. Type 1
Approved by the Ministry of Machinery Industry on July 29, 1993
Implementation on January 1, 1994
Flange type
a, b, d
JB/T6295-1993
Double-cylinder split type fuel injection pump installation type and connection dimensions See Figure 2 and Table 2. Figure 2
According to the technical agreement
54 or 56
Installation type and connection dimensions of multi-cylinder synthetic fuel injection pump 3.2
3.2.1 The installation and connection dimensions of the fuel injection pump of the end flange installation type are shown in Figure 3 to Figure 6 and Table 3 to Table 6. 3
68 or 85
JB/T6295-1993
JB/T6295-1993
95 or 107
JB/T6295-1993
10,8min
3.2.2 The installation and connection dimensions of the fuel injection pump of the bracket installation type a. The installation and connection dimensions of the fuel injection pump of the arc bottom installation type are shown in Figure 7 and Table 7. Figure 7
248 or 252
240×2
JB/T6295-1993
8.5 or 9.5
84 or 100
Note: 1) and 2) are only applicable to B and B type old product injection pumps. 9 or 11
(10 or 12)1)wwW.bzxz.Net
(12)2)
24.5±1 or 30±1
39.5±1 or 43±1
b. For the installation and connection dimensions of the flat bottom installation type injection pump, see Figure 8, Figure 9 and Table 8.
20 or 26
26 or 38
JB/T6295-1993
In addition to the above installation types and connection dimensions, if the user has other special requirements, it should be clearly specified in the technical agreement between the supply and demand parties. 3.2.3 The installation connection dimensions of the camshaft drive end of the injection pump and the coupling connection part shall comply with the relevant provisions of ZBJ94009. The connection dimensions of the oil pump outlet valve seat
The connection dimensions of the oil pump outlet valve seat are shown in Figure 10 and Table 9 Figure 10
Additional instructions:
5-1993
JB/T6295
This standard is proposed and managed by the Wuxi Oil Pump Nozzle Research Institute of the Ministry of Machinery Industry. This standard is drafted by the Wuxi Oil Pump Nozzle Research Institute, a(°)
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- QB/T 1537-1992 Single-phase permanent magnet stepping motor for clock-type quartz watches
- GB/T 4122.4-2002 Packaging trerm-Wooden containers
- JB/T 53080-1999 Plastic extrusion rotary shoemaking machine product quality classification
- CJJ 39-1991 Standard for Inspection and Assessment of the Quality of Ancient Building Construction Projects (Northern Region)
- GB 5863-1993 Inland waterway aids to navigation
- JGJ 73-1991 Specification for Construction and Acceptance of Building Decoration Engineering JGJ73-91
- CB/T 295-2000 Mushroom-shaped ventilator for ships
- GB/T 14159-1993 The evaluation rule for universal keyboard Chinese character coding input method
- GB/T 9385-1988 Guidelines for the preparation of computer software requirements specifications
- JB/T 7001-1993 WGP type drum gear coupling with brake disc type, parameters and dimensions
- GB/T 25894-2010 Escape and evacuation plan—Design principles and requirements
- CB/T 3470-1994 Requirements for the installation of special cabins and facilities on oceanographic survey vessels
- CB/Z 54-1981 Electrolytic zinc plating
- JB/T 6932-1993 Biological contact oxidation method for domestic sewage purification
- GB/T 14360-1993 Aluminum gangway with fixed curved steps
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com