
JB/T 3736.2-1994 Cause-effect diagram, a statistical tool commonly used in quality management
time:
2024-08-04 01:03:51
- JB/T 3736.2-1994
- in force
Standard ID:
JB/T 3736.2-1994
Standard Name:
Cause-effect diagram, a statistical tool commonly used in quality management
Chinese Name:
质量管理中常用的统计工具 因果图
Standard category:
Machinery Industry Standard (JB)
-
Date of Release:
1994-12-09 -
Date of Implementation:
1995-10-01
China Standard Classification Number:
Machinery>>General Machinery>>J00 Standardization, Quality Management
alternative situation:
JB 3736.2-1984
Focal point Organization:
Machinery Standardization Research Institute of the Ministry of Machinery IndustryPublishing Department:
Machinery Standardization Research Institute of the Ministry of Machinery Industry

Skip to download
Summary:
This standard describes the composition, drawing and application of cause-effect diagrams. Cause-effect diagrams are used to analyze the causes of quality problems in order to determine the cause-effect relationship and provide a basis for quality improvement. JB/T 3736.2-1994 Cause-effect diagrams, commonly used statistical tools in quality management JB/T3736.2-1994 Standard download decompression password: www.bzxz.net

Some standard content:
Machinery Industry Standard of the People's Republic of China
JB/T 3736. 1~-3736. 8-- 94
Statistical tools commonly used in quality management
Published on December 9, 1994
Ministry of Machinery Industry of the People's Republic of China
Implementation on October 1, 1995
Mechanical Industry Standard of the People's Republic of China
Statistical tools commonly used in quality management
Cause and Effect Diagram
1. Main content and scope of application
This section explains the construction, drawing and application of cause and effect diagrams. JB/13736.2:94
JH3730.2—21
The cause and effect diagram is used to analyze the source of the production and pressure problems in order to determine the cause and effect relationship and provide the basis for quality improvement. The cause and effect diagram consists of two parts. The main part refers to the measurable problem. The big part under the big part represents the influence of the quality factor. The small part, branch and twig represent the search from the point to the next level and then expand to form a tree classification diagram. Figure 1.
Secondary School Medical Law
"Apply the steps
and the three months hospital
when the result)
fourth fruit diagram
determine the quality or problem of equal division, write it in the direction of the needle, and find the arrow under the right side to determine the problem of the time to eliminate the factor classification method. For example, when dividing the process quality problem, you can use the method of its impact on the solid demand h.
operator, machine, sealing, square light, environmental competition and other categories, or you can classify it as a process step such as heat treatment, preheating, adding, cooling, tempering, full treatment, etc. The country, the three products are in turn, the head is the main point of the consulting, write the country's classification item at the end of the arrow. Classify the items separately and complete the study. Each room shows a network of large branches to create a sense of quality of the star station theme of the original letter, the Ministry of Industry and Commerce approved 1994-12-0 || tt || 1995-10-01 implementation || tt || JB/T 3736.2:94 || tt || two parallel to the work of the head pointing to the two major use, the source of the cause of the middle and then expand the film to form a small technology, small technology is the source of the technology or the flash. The installation can be carried out to improve the day by day. Analyze the reasons marked on the analysis chart, and sort out a small number of <3~5 reasons that have the greatest impact on demand from the lowest quality reasons and mark them on the surface. For example, collect data, conduct tests to confirm, improve and release, etc., and then draw the name of the cause and effect diagram, give the diagram time, the analysis of the hostages, etc. 3.2 Determine the quality of the analysis. See Figure 2. b. Determine the classification of factors that affect the pressure, see Figure 3. c. For the main reasons, see Figure 4.
The school song welcomesWww.bzxZ.net
The amount of paper,
The horror of the incident
The advertising institute
Light energy square
The stolen contract
Light business school
Continue to expand and complete the black, dead map.
JB/T 3736.294
Mark the main original area on the cumulative map, see 5, let the name, illustrator, drawing time, and personnel of the cause and effect diagram be clear, see 5E
Printed cause diagram
Three period
Writing mutual force
Tuoxing Island
Close to
Mutual makeup one
Two non-clubs
Added by
Additional instructions:|| tt||Busy word adjustment period
Low (6
Light of a
Light!
This standard is proposed by the Mechanical Industry Department's Mechanical Change Standardization Research Institute. The majority of the law
Figure date
wood standard by the Ministry of Industry Mechanical Covering Standardization Research Institute, Beijing No. 1 Machine Tool Factory, the first Lan machine tool production, Shenyang Heavy Machinery! Factory responsible for the main evil down Zhang, the standard business Zhang Bao, and well, Xiao Zongxiang, storage as proof.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
JB/T 3736. 1~-3736. 8-- 94
Statistical tools commonly used in quality management
Published on December 9, 1994
Ministry of Machinery Industry of the People's Republic of China
Implementation on October 1, 1995
Mechanical Industry Standard of the People's Republic of China
Statistical tools commonly used in quality management
Cause and Effect Diagram
1. Main content and scope of application
This section explains the construction, drawing and application of cause and effect diagrams. JB/13736.2:94
JH3730.2—21
The cause and effect diagram is used to analyze the source of the production and pressure problems in order to determine the cause and effect relationship and provide the basis for quality improvement. The cause and effect diagram consists of two parts. The main part refers to the measurable problem. The big part under the big part represents the influence of the quality factor. The small part, branch and twig represent the search from the point to the next level and then expand to form a tree classification diagram. Figure 1.
Secondary School Medical Law
"Apply the steps
and the three months hospital
when the result)
fourth fruit diagram
determine the quality or problem of equal division, write it in the direction of the needle, and find the arrow under the right side to determine the problem of the time to eliminate the factor classification method. For example, when dividing the process quality problem, you can use the method of its impact on the solid demand h.
operator, machine, sealing, square light, environmental competition and other categories, or you can classify it as a process step such as heat treatment, preheating, adding, cooling, tempering, full treatment, etc. The country, the three products are in turn, the head is the main point of the consulting, write the country's classification item at the end of the arrow. Classify the items separately and complete the study. Each room shows a network of large branches to create a sense of quality of the star station theme of the original letter, the Ministry of Industry and Commerce approved 1994-12-0 || tt || 1995-10-01 implementation || tt || JB/T 3736.2:94 || tt || two parallel to the work of the head pointing to the two major use, the source of the cause of the middle and then expand the film to form a small technology, small technology is the source of the technology or the flash. The installation can be carried out to improve the day by day. Analyze the reasons marked on the analysis chart, and sort out a small number of <3~5 reasons that have the greatest impact on demand from the lowest quality reasons and mark them on the surface. For example, collect data, conduct tests to confirm, improve and release, etc., and then draw the name of the cause and effect diagram, give the diagram time, the analysis of the hostages, etc. 3.2 Determine the quality of the analysis. See Figure 2. b. Determine the classification of factors that affect the pressure, see Figure 3. c. For the main reasons, see Figure 4.
The school song welcomesWww.bzxZ.net
The amount of paper,
The horror of the incident
The advertising institute
Light energy square
The stolen contract
Light business school
Continue to expand and complete the black, dead map.
JB/T 3736.294
Mark the main original area on the cumulative map, see 5, let the name, illustrator, drawing time, and personnel of the cause and effect diagram be clear, see 5E
Printed cause diagram
Three period
Writing mutual force
Tuoxing Island
Close to
Mutual makeup one
Two non-clubs
Added by
Additional instructions:|| tt||Busy word adjustment period
Low (6
Light of a
Light!
This standard is proposed by the Mechanical Industry Department's Mechanical Change Standardization Research Institute. The majority of the law
Figure date
wood standard by the Ministry of Industry Mechanical Covering Standardization Research Institute, Beijing No. 1 Machine Tool Factory, the first Lan machine tool production, Shenyang Heavy Machinery! Factory responsible for the main evil down Zhang, the standard business Zhang Bao, and well, Xiao Zongxiang, storage as proof.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 4122.3-1997 Packaging terms-Protection
- GB/T 40243-2021 Tornado intensity scale
- GB/T 20001.2-2001 Rules for drafting STANDARDs--Part 2:Symbol
- QB 1783-1993 Synthetic cinnamyl alcohol
- GBJ 117-1988 Standard for seismic evaluation of industrial structures
- JB/T 8024.1-1999 Machine tool fixture parts and components movable handles
- QB/T 1558.2-1992 Bench vise - Ordinary bench vise
- GB/T 14686-1993 Petroleum asphalt glass fiber felt
- JB/T 5814.3-1991 Basic parameters of special equipment for wires and cables Part 3: Wire stranding equipment
- GB/T 4700.5-1998 Chemical analysis methods for silicon-calcium alloys - Determination of carbon content by infrared absorption method
- QB/T 1508-1992 Dihydromyrcenol
- HG 3292-2001 Butachlor EC
- GB/T 13143-1991 Vocabulary of information and documentation-Traditional documents
- GB 18224-2000 Safety regulations for bridge grab ship unloaders
- JB/T 5688.2-1991 Peanut shelling machine test method
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]