GB/T 11606.5-1989 Environmental test methods for analytical instruments - Temperature change test
time:
2024-08-06 11:03:53
- GB/T 11606.5-1989
- Abolished
Standard ID:
GB/T 11606.5-1989
Standard Name:
Environmental test methods for analytical instruments - Temperature change test
Chinese Name:
分析仪器环境试验方法 温度变化试验
Standard category:
National Standard (GB)
-
Date of Release:
1989-03-31 -
Date of Implementation:
1990-03-01 -
Date of Expiration:
2007-12-01
Standard ICS number:
Test >> 19.040 Environmental TestChina Standard Classification Number:
Instruments and meters>>Material composition analysis instruments and environmental monitoring instruments>>N50 Material composition analysis instruments and environmental monitoring instruments comprehensive
alternative situation:
Replaced by GB/T 11606-2007
Review date:
2004-10-14Drafting Organization:
Beijing Analytical Instruments InstituteFocal point Organization:
National Technical Committee for Industrial Process Measurement and Control StandardizationPublishing Department:
China Machinery Industry FederationCompetent Authority:
China Machinery Industry Federation
Skip to download
Summary:
GB/T 11606.5-1989 Environmental test methods for analytical instruments Temperature change test GB/T11606.5-1989 Standard download decompression password: www.bzxz.net
Some standard content:
National Standard of the People's Republic of China
Environmental test method for analytical instruments
Temperature change test
The method of environmental test for analytical instrumentsChange of tcmperature test
Subject content and scope of application
GB11606.5—89
This standard specifies the grouping, test conditions and test methods of temperature change test for analytical instruments (hereinafter referred to as instruments). This standard is applicable to industrial process instruments or instruments used under harsh environmental conditions. 2 Temperature change test grouping
3 Test conditions
3.1 Requirements for test chambers (rooms)
3.1.1 The test chamber (room) should be able to provide the temperature specified in Chapter 2, with an allowable error of ±2°C. At the same time, the instrument should not be directly radiated by any heating and cooling elements.
3.1.2 The volume of the test box (room) should be three times the volume of the instrument. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test method
4.1 Pretreatment
Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 4.2 Initial inspection
Inspect the instrument in accordance with the relevant standards. 4.3 Test
4.3.1 The instrument is placed in the test box (room). After the instrument works normally, it begins to cool down to the specified value (the cooling rate is less than 1℃/min). If there are no special requirements, it can also be heated first and then cooled down.
4.3.2 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. The temperature of the test box (room) is heated to the specified value (the average heating rate is less than 1℃/min). 4.3.3
4.3.4 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. 4.3.5 The test duration should be selected from the following times: 2, 4, 8h. If there is no separate provision, it is 2h. 4.3.6
Temperature change test timing chart
Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
4.4 Recovery
Normal temperature
GB 11606.5-89
After the test, the instrument is placed in normal (or reference) environmental conditions to recover and reach temperature equilibrium. Final inspection
Inspect the instrument in accordance with the provisions of the relevant standards. 5 Details to be specified when citing this standard
Pretreatment;
Items and requirements for initial inspection;
Test duration:
Special requirements for the sequence of temperature increase and decrease;
Items and requirements for final inspection.
Amendment No. 1 to GB/T11606.5-1989 "Temperature Change Test for Environmental Test Methods of Analytical Instruments"bzxz.net
This amendment was approved and issued by the State Administration of Quality and Technical Supervision on July 19, 2000, and will be implemented from December 1, 2000. Published in the 9th issue of "China Standardization" in 2000. 1. Article 3.1.2 is revised as follows: "The volume of the test box (room) should be greater than 3 times the volume of the instrument." 10
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Environmental test method for analytical instruments
Temperature change test
The method of environmental test for analytical instrumentsChange of tcmperature test
Subject content and scope of application
GB11606.5—89
This standard specifies the grouping, test conditions and test methods of temperature change test for analytical instruments (hereinafter referred to as instruments). This standard is applicable to industrial process instruments or instruments used under harsh environmental conditions. 2 Temperature change test grouping
3 Test conditions
3.1 Requirements for test chambers (rooms)
3.1.1 The test chamber (room) should be able to provide the temperature specified in Chapter 2, with an allowable error of ±2°C. At the same time, the instrument should not be directly radiated by any heating and cooling elements.
3.1.2 The volume of the test box (room) should be three times the volume of the instrument. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test method
4.1 Pretreatment
Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 4.2 Initial inspection
Inspect the instrument in accordance with the relevant standards. 4.3 Test
4.3.1 The instrument is placed in the test box (room). After the instrument works normally, it begins to cool down to the specified value (the cooling rate is less than 1℃/min). If there are no special requirements, it can also be heated first and then cooled down.
4.3.2 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. The temperature of the test box (room) is heated to the specified value (the average heating rate is less than 1℃/min). 4.3.3
4.3.4 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. 4.3.5 The test duration should be selected from the following times: 2, 4, 8h. If there is no separate provision, it is 2h. 4.3.6
Temperature change test timing chart
Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
4.4 Recovery
Normal temperature
GB 11606.5-89
After the test, the instrument is placed in normal (or reference) environmental conditions to recover and reach temperature equilibrium. Final inspection
Inspect the instrument in accordance with the provisions of the relevant standards. 5 Details to be specified when citing this standard
Pretreatment;
Items and requirements for initial inspection;
Test duration:
Special requirements for the sequence of temperature increase and decrease;
Items and requirements for final inspection.
Amendment No. 1 to GB/T11606.5-1989 "Temperature Change Test for Environmental Test Methods of Analytical Instruments"bzxz.net
This amendment was approved and issued by the State Administration of Quality and Technical Supervision on July 19, 2000, and will be implemented from December 1, 2000. Published in the 9th issue of "China Standardization" in 2000. 1. Article 3.1.2 is revised as follows: "The volume of the test box (room) should be greater than 3 times the volume of the instrument." 10
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GA 436-2003 Specification for the public security management information system database for the motor vehicle repair industry and the scrapped motor vehicle recycling and dismantling industry
- GB/T 17274-1998 Series 1:Specification and testing for non-pressurized containers for dry bulk
- JB/T 9204-1999 Metallographic examination of steel parts after induction heat treatment
- JB/T 3695-1994 Electric hoist bridge crane
- JB/T 10390-2002 Feasibility Design of Fieldbus Intelligent Instruments
- GB 9744-1997 Truck tires
- NY/T 1706-2009 Code of practice of risk analysis for alien insect Rhynchophorus ferrugineus(Olivier)
- SJ 2246-1982 Gas-filled microwave switching tubes,Type RX-202, RX-203
- JJG 99-1990 Verification Regulation of Weights
- GB/T 9204.2-1988 Fixed center precision
- SY/T 0004-1998 Oilfield oil and gas gathering and transportation design specification
- SJ 3228.1-1989 Specification for high purty arenaceous quartz for use in electronic industry
- GB/T 11684-2003 Electromagnetic environmental conditions and test methods for nuclear instruments
- CJJ/T 88-2000 Technical regulations for safe operation of urban heating systems
- SJ/T 10536.2-1994 Tungsten-Thorium alloy rod
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:wymp4wang@gmail.com