GB/T 11606.5-1989 Environmental test methods for analytical instruments - Temperature change test
time:
2024-08-06 11:03:53
- GB/T 11606.5-1989
- Abolished
Standard ID:
GB/T 11606.5-1989
Standard Name:
Environmental test methods for analytical instruments - Temperature change test
Chinese Name:
分析仪器环境试验方法 温度变化试验
Standard category:
National Standard (GB)
-
Date of Release:
1989-03-31 -
Date of Implementation:
1990-03-01 -
Date of Expiration:
2007-12-01
Standard ICS number:
Test >> 19.040 Environmental TestChina Standard Classification Number:
Instruments and meters>>Material composition analysis instruments and environmental monitoring instruments>>N50 Material composition analysis instruments and environmental monitoring instruments comprehensive
alternative situation:
Replaced by GB/T 11606-2007
Review date:
2004-10-14Drafting Organization:
Beijing Analytical Instruments InstituteFocal point Organization:
National Technical Committee for Industrial Process Measurement and Control StandardizationPublishing Department:
China Machinery Industry FederationCompetent Authority:
China Machinery Industry Federation

Skip to download
Summary:
GB/T 11606.5-1989 Environmental test methods for analytical instruments Temperature change test GB/T11606.5-1989 Standard download decompression password: www.bzxz.net

Some standard content:
National Standard of the People's Republic of China
Environmental test method for analytical instruments
Temperature change test
The method of environmental test for analytical instrumentsChange of tcmperature test
Subject content and scope of application
GB11606.5—89
This standard specifies the grouping, test conditions and test methods of temperature change test for analytical instruments (hereinafter referred to as instruments). This standard is applicable to industrial process instruments or instruments used under harsh environmental conditions. 2 Temperature change test grouping
3 Test conditions
3.1 Requirements for test chambers (rooms)
3.1.1 The test chamber (room) should be able to provide the temperature specified in Chapter 2, with an allowable error of ±2°C. At the same time, the instrument should not be directly radiated by any heating and cooling elements.
3.1.2 The volume of the test box (room) should be three times the volume of the instrument. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test method
4.1 Pretreatment
Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 4.2 Initial inspection
Inspect the instrument in accordance with the relevant standards. 4.3 Test
4.3.1 The instrument is placed in the test box (room). After the instrument works normally, it begins to cool down to the specified value (the cooling rate is less than 1℃/min). If there are no special requirements, it can also be heated first and then cooled down.
4.3.2 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. The temperature of the test box (room) is heated to the specified value (the average heating rate is less than 1℃/min). 4.3.3
4.3.4 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. 4.3.5 The test duration should be selected from the following times: 2, 4, 8h. If there is no separate provision, it is 2h. 4.3.6
Temperature change test timing chart
Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
4.4 Recovery
Normal temperature
GB 11606.5-89
After the test, the instrument is placed in normal (or reference) environmental conditions to recover and reach temperature equilibrium. Final inspectionbzxz.net
Inspect the instrument in accordance with the provisions of the relevant standards. 5 Details to be specified when citing this standard
Pretreatment;
Items and requirements for initial inspection;
Test duration:
Special requirements for the sequence of temperature increase and decrease;
Items and requirements for final inspection.
Amendment No. 1 to GB/T11606.5-1989 "Temperature Change Test for Environmental Test Methods of Analytical Instruments"
This amendment was approved and issued by the State Administration of Quality and Technical Supervision on July 19, 2000, and will be implemented from December 1, 2000. Published in the 9th issue of "China Standardization" in 2000. 1. Article 3.1.2 is revised as follows: "The volume of the test box (room) should be greater than 3 times the volume of the instrument." 10
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Environmental test method for analytical instruments
Temperature change test
The method of environmental test for analytical instrumentsChange of tcmperature test
Subject content and scope of application
GB11606.5—89
This standard specifies the grouping, test conditions and test methods of temperature change test for analytical instruments (hereinafter referred to as instruments). This standard is applicable to industrial process instruments or instruments used under harsh environmental conditions. 2 Temperature change test grouping
3 Test conditions
3.1 Requirements for test chambers (rooms)
3.1.1 The test chamber (room) should be able to provide the temperature specified in Chapter 2, with an allowable error of ±2°C. At the same time, the instrument should not be directly radiated by any heating and cooling elements.
3.1.2 The volume of the test box (room) should be three times the volume of the instrument. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test method
4.1 Pretreatment
Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 4.2 Initial inspection
Inspect the instrument in accordance with the relevant standards. 4.3 Test
4.3.1 The instrument is placed in the test box (room). After the instrument works normally, it begins to cool down to the specified value (the cooling rate is less than 1℃/min). If there are no special requirements, it can also be heated first and then cooled down.
4.3.2 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. The temperature of the test box (room) is heated to the specified value (the average heating rate is less than 1℃/min). 4.3.3
4.3.4 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. 4.3.5 The test duration should be selected from the following times: 2, 4, 8h. If there is no separate provision, it is 2h. 4.3.6
Temperature change test timing chart
Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
4.4 Recovery
Normal temperature
GB 11606.5-89
After the test, the instrument is placed in normal (or reference) environmental conditions to recover and reach temperature equilibrium. Final inspectionbzxz.net
Inspect the instrument in accordance with the provisions of the relevant standards. 5 Details to be specified when citing this standard
Pretreatment;
Items and requirements for initial inspection;
Test duration:
Special requirements for the sequence of temperature increase and decrease;
Items and requirements for final inspection.
Amendment No. 1 to GB/T11606.5-1989 "Temperature Change Test for Environmental Test Methods of Analytical Instruments"
This amendment was approved and issued by the State Administration of Quality and Technical Supervision on July 19, 2000, and will be implemented from December 1, 2000. Published in the 9th issue of "China Standardization" in 2000. 1. Article 3.1.2 is revised as follows: "The volume of the test box (room) should be greater than 3 times the volume of the instrument." 10
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 6807-1986 Specification for phosphate treatment of iron and steel parts before painting
- JB/T 6541-1993 Shape and structural elements of cold extruded parts
- HG/T 2970-1999 Phosphorus trichloride for industrial use
- GB/T 4675.2-1984 Weldability test - CTS weld crack test method
- QB/T 1683-1993 Aluminum-silicon-magnesium sagger
- JB/T 1674-1994 Air-leg rock drill
- QX/T 493-2019 Requirements for transportation and storage of rocket shell on weather modification
- HG/T 20699-2000 Common terms and terms for automatic control design
- QB/T 2289.6-2001 Gardening tools hand saw
- JB/T 8514.3-1997 Basic provisions for the compilation of enterprise standardization work guidelines and management standards and work standards
- GB/T 5271.16-1986 Data processing vocabulary Part 16 Information theory
- GB/T 3070-1982 Pitch coke
- GB/T 2985-1999 Biological microscope
- GB/T 15448-1995 Fixed capacitors for electronic equipment Part 19: Sectional specification Metallized polyethylene terephthalate film dielectric DC chip fixed capacitors
- QB/T 2609-2003 Test method for oil leakage of industrial sewing machines Part 1: Test method for oil leakage of flat sewing machines
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]