JB/T 2001.23-1999 Water system plug (PN=31.5MPa)
time:
2024-08-14 15:18:11
- JB/T 2001.23-1999
- in force
Standard ID:
JB/T 2001.23-1999
Standard Name:
Water system plug (PN=31.5MPa)
Chinese Name:
水系统 丝堵(PN=31.5MPa)
Standard category:
Machinery Industry Standard (JB)
-
Date of Release:
1999-06-28 -
Date of Implementation:
2000-01-01
Standard ICS number:
Fluid systems and general parts >> 23.100 Fluid power systemsChina Standard Classification Number:
Machinery>>General Parts>>J20 Hydraulic and Pneumatic Devices
alternative situation:
JB 2023-1984
Focal point Organization:
Metallurgical Equipment Standardization Technical Committee
Skip to download
Summary:
JB/T 2001.23-1999 JB/T 2001.23-1999 Water system plug (PN=31.5MPa) JB/T2001.23-1999 Standard download decompression password: www.bzxz.net
Some standard content:
IC.s$ 23.110
Standard of the Machinery Industry of the People's Republic of China
JB/T 2001.1~2001.74—1999
Water system assembly and parts1999-06-28 Issued
State Machinery Industry Bureau
2(-01-U1 Implementation
Standard of the Machinery Industry of the People's Republic of China
Water system screw plug
Wntersystemr-Serewplug
( PN=31.5 MPa 1
The standard specifies the type, size and technical requirements of the plug. This standard applies to all kinds of channel plugs with a nominal pressure of 31.5MPa. Type 2 or size
2.1 The type shall comply with the provisions of Figure 1.
2.2 The size shall comply with the provisions of Figure 1 and Table 1. Figure
Approved by the State Machinery Industry Bureau on June 28, 1999 46
JR/T 2001.23-1999
Generation B2-84
2000-01-01 Implementation
JBT 2CO1.23.1
FH: 2 23 3
JB/T 200:.23 4
JB:J 200:.23 S
JR-7201.2.3.5
I : 7M1 25
[BT 20C1.23.5
mT 21.23.9
JI 20K1.23.1Gbzxz.net
15[M12 6×3
M72 ×4
M9m×4
M心×4
21.HE25151 x
1 Technical requirements for assembly
3. Before welding, the plug must be tightened
1A/T2001.23—1999
32. The two ends of the weld should be welded first, and the isothermal skin should be applied before welding the gaps in the middle. This process should be repeated layer by layer. Except for the first and last layers, the oxide skin should be cleaned as much as possible. When the alloy is fully cooled to the following temperature, use the head to cut gently to make the weld more stable. 3.3. Wear is not allowed There are arc pits: This kind of defect is easy to cause cracks. It is recommended to use T427 or T07 welding rod with a spot diameter of 3 mm. The DC power supply must be reversed, that is, 1 part is the pole, the current is small until the coating turns red,
3.5 When the voltage is low, the electrode head should be 2-3 meters away from the workpiece. 4 Marking to
Steel with a nominal diameter of 10mm
DN10JB/T 2001.23.~1999
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Standard of the Machinery Industry of the People's Republic of China
JB/T 2001.1~2001.74—1999
Water system assembly and parts1999-06-28 Issued
State Machinery Industry Bureau
2(-01-U1 Implementation
Standard of the Machinery Industry of the People's Republic of China
Water system screw plug
Wntersystemr-Serewplug
( PN=31.5 MPa 1
The standard specifies the type, size and technical requirements of the plug. This standard applies to all kinds of channel plugs with a nominal pressure of 31.5MPa. Type 2 or size
2.1 The type shall comply with the provisions of Figure 1.
2.2 The size shall comply with the provisions of Figure 1 and Table 1. Figure
Approved by the State Machinery Industry Bureau on June 28, 1999 46
JR/T 2001.23-1999
Generation B2-84
2000-01-01 Implementation
JBT 2CO1.23.1
FH: 2 23 3
JB/T 200:.23 4
JB:J 200:.23 S
JR-7201.2.3.5
I : 7M1 25
[BT 20C1.23.5
mT 21.23.9
JI 20K1.23.1Gbzxz.net
15[M12 6×3
M72 ×4
M9m×4
M心×4
21.HE25151 x
1 Technical requirements for assembly
3. Before welding, the plug must be tightened
1A/T2001.23—1999
32. The two ends of the weld should be welded first, and the isothermal skin should be applied before welding the gaps in the middle. This process should be repeated layer by layer. Except for the first and last layers, the oxide skin should be cleaned as much as possible. When the alloy is fully cooled to the following temperature, use the head to cut gently to make the weld more stable. 3.3. Wear is not allowed There are arc pits: This kind of defect is easy to cause cracks. It is recommended to use T427 or T07 welding rod with a spot diameter of 3 mm. The DC power supply must be reversed, that is, 1 part is the pole, the current is small until the coating turns red,
3.5 When the voltage is low, the electrode head should be 2-3 meters away from the workpiece. 4 Marking to
Steel with a nominal diameter of 10mm
DN10JB/T 2001.23.~1999
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB 15991-1995 Plague diagnostic criteria
- JB/T 6041-1992 Technical requirements for gear pairs of main reducers of drive axles of wheeled engineering machinery
- HG 3694-2001 Feed additive ethoxyquin (ethoxyquinoline)
- GB/T 14604-1993 Gas oxygen for use in the electronics industry
- GB/T 5055-1997 Broodstock of black carp, grass carp, silver carp and bighead carp
- CB/T 3790-1997 Technical requirements for ship pipe processing
- GB/T 15876-1995 Specification for lead frames for plastic four-sided lead flat package
- HG/T 2809-1996 Rubber sealing belt for soft sealing device of floating roof oil tank
- JB/T 8771.1-1998 Inspection conditions for machining centres Part 1: Geometric accuracy inspection of horizontal and additional spindle head machines (horizontal Z axis)
- GB/T 4074.5-1999 Winding wire test methods Part 5: Electrical properties
- JB/T 8114.1-1999 Electromagnetic vibrating feeder types and basic parameters
- SL 252-2000 Classification of water conservancy and hydropower projects and flood standards
- GB/T 17980.6-2000 Pesticide-Guidelines for the field efficacy trials(Ⅰ)-Insecticides against corn borerworm
- JB/T 5513-1991 SWC type integral fork cross shaft universal coupling
- MT 950-2005 Safety technical inspection specification for air compressors in underground coal mines
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:wymp4wang@gmail.com