
GB/T 5385-1994 Test method for acceleration performance of motorcycles and mopeds
time:
2024-08-04 18:03:22
- GB/T 5385-1994
- Abolished
Standard ID:
GB/T 5385-1994
Standard Name:
Test method for acceleration performance of motorcycles and mopeds
Chinese Name:
摩托车和轻便摩托车加速性能试验方法
Standard category:
National Standard (GB)
-
Date of Release:
1994-01-02 -
Date of Implementation:
1995-07-01 -
Date of Expiration:
2009-04-01
Standard ICS number:
Road Vehicle Engineering >> 43.140 Motorcycles and MopedsChina Standard Classification Number:
Vehicles>>Motorcycles>>T80 Motorcycles General
alternative situation:
Replaced GB 4565-1984; GB 5385-1985; replaced by GB/T 5378-2008Procurement status:
≈JIS D1035
Release date:
1985-09-23Review date:
2004-10-14Drafting Organization:
State-owned Construction Machine Tool FactoryFocal point Organization:
National Automobile Standardization Technical CommitteePublishing Department:
State Bureau of Technical SupervisionCompetent Authority:
National Development and Reform Commission

Skip to download
Summary:
This standard specifies the test conditions for the acceleration performance test of motorcycles and mopeds and the test methods for the starting acceleration and overtaking acceleration performance. This standard applies to the acceleration performance test of motorcycles and mopeds (except racing cars). GB/T 5385-1994 Test method for acceleration performance of motorcycles and mopeds GB/T5385-1994 Standard download decompression password: www.bzxz.net

Some standard content:
National Standard of the People's Republic of China
Acceleration performance of motorcycles and mopeds
Test method
Method of acceleration test for motorcycles and mopeds
This standard adopts the Japanese Industrial Standard JISD1035 "Test method for acceleration performance of motorcycles" Subject content and scope of application
GB/T 5385--94
GB4565---84
GB5385-85
This standard specifies the test conditions for the acceleration performance test of motorcycles and mopeds and the test methods for starting acceleration and overtaking acceleration performance.
This standard is applicable to the acceleration performance test of motorcycles and mopeds (except racing cars). 2 Referenced standards
GB/T5378 General principles for road test methods for motorcycles and mopeds 3 Test conditions
The test conditions shall be in accordance with the provisions of GB/T5378.
4 Starting acceleration performance test method
4.1 Set up an acceleration performance test section on the test road, and its length is as specified in the following table. Sufficiently long auxiliary driving areas should be ensured at both ends of the test section.
When it is necessary to draw a \St\ relationship diagram, test points can be set up at 50m, 100m, 200m, 400m or other points at the starting point of the test section.
Test items
Starting acceleration performance
Overtaking acceleration performance
Acceleration performance test section length
Two-wheeled motorcycle
Three-wheeled motorcycle
4.2 After the test vehicle is preheated and driven, it stops 0.5m in front of the starting point of the acceleration test section (based on the front wheel pressure line). At the beginning of the test, start at the lowest gear (speed), change gears (speeds) in sequence, accelerate to the highest gear (speed), and quickly pass through the test area. Use an automatic timing device or a stopwatch to measure the time taken by the test vehicle from the starting point to the end point. If necessary, the time taken by the test vehicle from the starting point to each mark can be measured at the same time. Each test should be carried out back and forth, and the average value of the measured time of the round-trip test is calculated. 4.3 According to the average value of the measured time calculated in Article 4.2, use formula (1) to calculate the acceleration from the starting point to each mark. Approved by the State Administration of Technical Supervision on December 27, 1994 and implemented on July 1, 1995
In the formula: a--acceleration, m/s2,
S--distance, m;
t--time, s.
GB/T 5385--94
(1)
4.4 Record the test data and results in Table A1 of Appendix A (Supplement), and draw the \St relationship diagram as needed, see Appendix B (Supplement). 5 Overtaking acceleration performance test method
5.1 On the test road, set up an acceleration performance test section, the length of which is specified in the table of Article 4.1. Take 2m or 50m before the start of the acceleration test section as the initial speed test section (take 2m when using an automatic timing device, and take 50m when using a stopwatch). Before the start of the initial speed test section and after the end of the acceleration test section, a sufficiently long auxiliary driving area should be ensured. When it is necessary to draw the \St relationship diagram, test points can be set at 50m, 100m, 200m, 400m or other points of the acceleration test section.
5.2 In principle, the vehicle under test shall pass the initial speed test section stably at the specified initial speed in the highest gear. The initial speed shall be in accordance with the provisions of Article 5.3. When the vehicle under test reaches the starting point of the acceleration test section, it shall accelerate rapidly through this section. The time taken by the vehicle under test to pass through the initial speed test section and the acceleration test section shall be measured by an automatic timing device or a stopwatch.
Each test shall be conducted back and forth, and the average time of the round-trip test shall be calculated. 5.3 The initial speed of the vehicle under test for the overtaking acceleration test is as follows: 20±2km/h for light motorcycles. If 50% of the maximum speed of such vehicles is less than 20km/h, 50% of the maximum speed of the vehicle shall be used as the initial test speed, and the tolerance is ±2km/h; 30±1km/h for motorcycles. If the motorcycle under test cannot run stably at an initial speed of 30±1km/h in the highest gear, the second highest gear may be used. The initial test speed is still 30±1km/h, and gear shifting is not allowed during the test. 5.4 Based on the average value of the measurement time obtained in 5.2, use the following formula to calculate the acceleration from the start point of the acceleration test interval to each mark point. 2(S -Vot)
Where: a - acceleration, m/s,
S - distance, m;
t - time, s;
V. - initial velocity of measurement, m/s.
5.5 Record the test data and results in Table A2 of Appendix A. Draw the \St\ relationship diagram as needed, see Appendix B (Supplement). 152
Vehicle number
Engine number
Vehicle curb mass
Driver mass
Front wheel pressure
Rear wheel pressure
Side wheel pressure
Tester
Driver
Testing equipment
GB/T5385—94
Appendix A
Acceleration performance test record and result table
(Supplement)
Table A1 Starting acceleration performance test record and result tableTest date
Test location||tt ||50m interval
Time used Acceleration
Relative humidity
Atmospheric pressure
Lubricant
Mixing ratio
100m interval
Acceleration
Time used
200m interval
Time used
Acceleration
400m interval
Time used
Acceleration
Driver quality
Tester
Test location
Lubricant
Test sequence
GB/T 5385--94
Table A2 Overtaking acceleration performance test record and result table Frame number
Front wheel air pressure
Driver
Atmospheric pressure
Mixture ratio
Initial speed
Time t
Time used
50m interval
Engine number
Rear wheel air pressure
Gear used
Relative humidity
100 m interval
200m interval
Vehicle curb weight_kgwwW.bzxz.Net
Side wheel air pressure
Test date
400m interval
Acceleration
Acceleration
Acceleration
Time t
Time t
Appendix B
Acceleration performance test "St" relationship diagram
(Supplement)
Test interval
Additional remarks:
This standard is proposed by China National Automotive Industry Corporation. GB/T5385—94
This standard is under the jurisdiction of the National Automobile Standardization Technical Committee. This standard was drafted by Jianshe Machine Tool. The main drafters of this standard are Zhang Shanfu and Zhang Yinghui. 155
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Acceleration performance of motorcycles and mopeds
Test method
Method of acceleration test for motorcycles and mopeds
This standard adopts the Japanese Industrial Standard JISD1035 "Test method for acceleration performance of motorcycles" Subject content and scope of application
GB/T 5385--94
GB4565---84
GB5385-85
This standard specifies the test conditions for the acceleration performance test of motorcycles and mopeds and the test methods for starting acceleration and overtaking acceleration performance.
This standard is applicable to the acceleration performance test of motorcycles and mopeds (except racing cars). 2 Referenced standards
GB/T5378 General principles for road test methods for motorcycles and mopeds 3 Test conditions
The test conditions shall be in accordance with the provisions of GB/T5378.
4 Starting acceleration performance test method
4.1 Set up an acceleration performance test section on the test road, and its length is as specified in the following table. Sufficiently long auxiliary driving areas should be ensured at both ends of the test section.
When it is necessary to draw a \St\ relationship diagram, test points can be set up at 50m, 100m, 200m, 400m or other points at the starting point of the test section.
Test items
Starting acceleration performance
Overtaking acceleration performance
Acceleration performance test section length
Two-wheeled motorcycle
Three-wheeled motorcycle
4.2 After the test vehicle is preheated and driven, it stops 0.5m in front of the starting point of the acceleration test section (based on the front wheel pressure line). At the beginning of the test, start at the lowest gear (speed), change gears (speeds) in sequence, accelerate to the highest gear (speed), and quickly pass through the test area. Use an automatic timing device or a stopwatch to measure the time taken by the test vehicle from the starting point to the end point. If necessary, the time taken by the test vehicle from the starting point to each mark can be measured at the same time. Each test should be carried out back and forth, and the average value of the measured time of the round-trip test is calculated. 4.3 According to the average value of the measured time calculated in Article 4.2, use formula (1) to calculate the acceleration from the starting point to each mark. Approved by the State Administration of Technical Supervision on December 27, 1994 and implemented on July 1, 1995
In the formula: a--acceleration, m/s2,
S--distance, m;
t--time, s.
GB/T 5385--94
(1)
4.4 Record the test data and results in Table A1 of Appendix A (Supplement), and draw the \St relationship diagram as needed, see Appendix B (Supplement). 5 Overtaking acceleration performance test method
5.1 On the test road, set up an acceleration performance test section, the length of which is specified in the table of Article 4.1. Take 2m or 50m before the start of the acceleration test section as the initial speed test section (take 2m when using an automatic timing device, and take 50m when using a stopwatch). Before the start of the initial speed test section and after the end of the acceleration test section, a sufficiently long auxiliary driving area should be ensured. When it is necessary to draw the \St relationship diagram, test points can be set at 50m, 100m, 200m, 400m or other points of the acceleration test section.
5.2 In principle, the vehicle under test shall pass the initial speed test section stably at the specified initial speed in the highest gear. The initial speed shall be in accordance with the provisions of Article 5.3. When the vehicle under test reaches the starting point of the acceleration test section, it shall accelerate rapidly through this section. The time taken by the vehicle under test to pass through the initial speed test section and the acceleration test section shall be measured by an automatic timing device or a stopwatch.
Each test shall be conducted back and forth, and the average time of the round-trip test shall be calculated. 5.3 The initial speed of the vehicle under test for the overtaking acceleration test is as follows: 20±2km/h for light motorcycles. If 50% of the maximum speed of such vehicles is less than 20km/h, 50% of the maximum speed of the vehicle shall be used as the initial test speed, and the tolerance is ±2km/h; 30±1km/h for motorcycles. If the motorcycle under test cannot run stably at an initial speed of 30±1km/h in the highest gear, the second highest gear may be used. The initial test speed is still 30±1km/h, and gear shifting is not allowed during the test. 5.4 Based on the average value of the measurement time obtained in 5.2, use the following formula to calculate the acceleration from the start point of the acceleration test interval to each mark point. 2(S -Vot)
Where: a - acceleration, m/s,
S - distance, m;
t - time, s;
V. - initial velocity of measurement, m/s.
5.5 Record the test data and results in Table A2 of Appendix A. Draw the \St\ relationship diagram as needed, see Appendix B (Supplement). 152
Vehicle number
Engine number
Vehicle curb mass
Driver mass
Front wheel pressure
Rear wheel pressure
Side wheel pressure
Tester
Driver
Testing equipment
GB/T5385—94
Appendix A
Acceleration performance test record and result table
(Supplement)
Table A1 Starting acceleration performance test record and result tableTest date
Test location||tt ||50m interval
Time used Acceleration
Relative humidity
Atmospheric pressure
Lubricant
Mixing ratio
100m interval
Acceleration
Time used
200m interval
Time used
Acceleration
400m interval
Time used
Acceleration
Driver quality
Tester
Test location
Lubricant
Test sequence
GB/T 5385--94
Table A2 Overtaking acceleration performance test record and result table Frame number
Front wheel air pressure
Driver
Atmospheric pressure
Mixture ratio
Initial speed
Time t
Time used
50m interval
Engine number
Rear wheel air pressure
Gear used
Relative humidity
100 m interval
200m interval
Vehicle curb weight_kgwwW.bzxz.Net
Side wheel air pressure
Test date
400m interval
Acceleration
Acceleration
Acceleration
Time t
Time t
Appendix B
Acceleration performance test "St" relationship diagram
(Supplement)
Test interval
Additional remarks:
This standard is proposed by China National Automotive Industry Corporation. GB/T5385—94
This standard is under the jurisdiction of the National Automobile Standardization Technical Committee. This standard was drafted by Jianshe Machine Tool. The main drafters of this standard are Zhang Shanfu and Zhang Yinghui. 155
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 6477-1992 Method for drawing drawings of low voltage switchgear products and their components
- JB/T 4330-1999 Determination of noise from refrigeration and air conditioning equipment
- GBZ/T 147-2002 Determination of attenuation properties of X-ray shielding materials
- MT/T 649-1997 Technical requirements for jet flotation machines for coal
- GB/T 17894-1999 Automatic identification of containers
- GB/T 27842-2011 Chemicals—Test method for dynamic surface tension—Fast-bubble technique
- SY/T 6483-2000 Data recording format for digital well logging tools
- GB/T 19710-2005 Geographic Information—Metadata
- JB/T 9090-1999 Hydraulic and leakage test for positive displacement pump components
- GB/T 3074.4-2003 Determination method of coefficient of thermal expansion (CTE) of graphite electrode
- JB/T 2001.18-1999 Types and dimensions of circular connection flanges for water systems (PN=20MPa)
- GB/T 2952.4-1989 Cable outer sheath Part 4: Special outer sheath for lead sheathed oil-filled cable
- GB/T 19568-2004 Specification for assembly and installation of wind turbine generator sets
- JB/T 3411.1-1999 Dimensions of flexible toolholders
- JB/T 8125-1999 Technical requirements for shell and tube oil coolers for internal combustion engines
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]