
JB/T 7173.2-1993 Diesel engine fuel injection pump plunger assembly performance test method
time:
1993-11-21 16:00:00
- JB/T 7173.2-1993
- Abolished
Standard ID:
JB/T 7173.2-1993
Standard Name:
Diesel engine fuel injection pump plunger assembly performance test method
Chinese Name:
柴油机喷油泵柱塞偶件 性能试验方法
Standard category:
Machinery Industry Standard (JB)
-
Date of Release:
1993-11-21 -
Date of Implementation:
1994-03-01 -
Date of Expiration:
2005-04-01
Standard ICS number:
Energy and Heat Transfer Engineering >> 27.020 Internal Combustion EngineChina Standard Classification Number:
Machinery>>Piston Internal Combustion Engine and Other Power Equipment>>J94 Fuel Heating System
alternative situation:
Original standard number GB 5264-1985; replaced by JB/T 7173.2-2004

Skip to download
Summary:
JB/T 7173.2-1993 Diesel engine fuel injection pump plunger assembly performance test method JB/T7173.2-1993 standard download decompression password: www.bzxz.net

Some standard content:
Mechanical Industry Standard of the People's Republic of China
JB/T7173.2-93
Diesel Engine Fuel Injection Pump Plunger Pair
Performance Test Method
Published on November 21, 1993
Ministry of Machinery Industry of the People's Republic of China
Implementation on March 1, 1994
Mechanical Industry Standard of the People's Republic of China
Diesel Engine Fuel Injection Pump Plunger Pair
Performance Test Method
1 Subject Content and Scope of Application
JB/T 7173.2-93
This standard specifies the performance test method for the medium and small power diesel engine fuel injection ticket plunger pair (hereinafter referred to as plunger pair). This standard applies to the medium and small power diesel engine fuel injection accumulator plunger pair. 2 Reference standards
Light diesel oil
JB/T7173.1 Diesel engine fuel injection pump plunger pair·Technical conditions 3 Test conditions
3.1 The lubricant for the plunger pair sliding test shall be well-filtered No. 0 light diesel oil in accordance with GB252. 3.2 The plunger pair diameter sealing test shall be carried out under the following conditions. The test oil is a mixture of diesel and engine oil, and its kinematic viscosity is 10.2~10.7cst at 20℃: a.
Ambient temperature is 20±1℃;
Pressure display device
Range: 0~40MPa
Accuracy: ±0.1MPa:
d, intake pressure: 0.2~0.5MPa compressed air. 4 Test method
4.1. Sliding property test of plunger pair
After cleaning and lubricating the parts with well-filtered No. 0 light diesel oil that meets the requirements of GB252, place the plunger pair at a 45° angle to the horizontal, and pull out 1/3 of the length of the working surface of the plunger from the plunger sleeve. The plunger rotates around its axis to any position. After letting go, the plunger can slide down by its own weight without any obstruction. 4.2 Plunger pair diameter sealing test
4.2.1 The plunger pair diameter sealing test is carried out using an isobaric test method. During the test, the sealing end face of the plunger sleeve is blocked, and the pressure in the space above the plunger is 20±0.3MPa.
4.2.2 The angular position of the plunger sleeve relative to the oil return hole of the plunger sleeve (geometric effective stroke of the plunger sleeve) shall comply with the provisions of Table 2 of JB/T7173.1 or be implemented in accordance with the technical documents approved by the prescribed procedures. 4.2.3 Other oil pressure or air pressure test methods are allowed for the plunger pair diameter sealing test, but it must be ensured that the sample quality requirements specified in Article 3.10 of JB/T7173.1 are met. 4.3 Reliability test of plunger pair
Reliability test method of plunger pair shall be in accordance with the provisions of Appendix A (supplement) Approved by the Ministry of Machinery Industry on November 21, 1993
Implemented on March 1, 1994
A1 Test sample
JB/T 7173.293
Appendix A
Reliability test method of plunger pair
(supplement)wwW.bzxz.Net
The plunger pair to be tested for reliability shall comply with the provisions of product drawings and relevant technical documents, and shall be inspected by the factory inspection department. Samples shall be taken at the production warehouse or at the end of the production line, with a sample matrix of no less than 90 pairs; samples shall be taken from users or the market, and 8 pairs shall be randomly sampled without limiting the number of sample matrices.
A2 Test method
A2.1 The reliability test of plunger pair is to install it in the fuel injection pump and perform cold drag operation on the indoor fuel injection pump reliability test bench. A2.2 The reliability test of the plunger pair is carried out according to the 750h timed truncation test method. A2.3 The reliability test conditions of the plunger pair are the same as those of the fuel injection ticket. A2.4 If the plunger pair is damaged during the test, it is judged as failed, and the test of the failed sample is stopped. A2.5 At the end of the 750h test, the plunger pair should be checked for the sealing of the diameter according to the provisions of Article 3.10 of JB/T7173.1. If the sealing value is lower than the lower limit of the sealing value of similar products (maximum for intermediate acid) for more than 3s, it is judged as failed. A3 Time of failure
A3.1 If the failure can be discovered in time, the exact time of failure should be recorded. A3.2 For failures that cannot be discovered in time, determine their occurrence time T according to formula (A1). If n failures occur within the time interval (t, t, 3), then the time of occurrence of the mth failure is: To = t- +
Additional explanation:
-t, -- t,1-
This standard is proposed and managed by Wuxi Oil Pump and Nozzle Research Institute of the Ministry of Machinery Industry. This standard was drafted by Wuxi Oil Pump and Nozzle Research Institute, Shanghai Internal Combustion Engine Research Institute and other units. The main drafters of this standard are Zheng Valna and Xu Guanming. 2
..(A1)
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
JB/T7173.2-93
Diesel Engine Fuel Injection Pump Plunger Pair
Performance Test Method
Published on November 21, 1993
Ministry of Machinery Industry of the People's Republic of China
Implementation on March 1, 1994
Mechanical Industry Standard of the People's Republic of China
Diesel Engine Fuel Injection Pump Plunger Pair
Performance Test Method
1 Subject Content and Scope of Application
JB/T 7173.2-93
This standard specifies the performance test method for the medium and small power diesel engine fuel injection ticket plunger pair (hereinafter referred to as plunger pair). This standard applies to the medium and small power diesel engine fuel injection accumulator plunger pair. 2 Reference standards
Light diesel oil
JB/T7173.1 Diesel engine fuel injection pump plunger pair·Technical conditions 3 Test conditions
3.1 The lubricant for the plunger pair sliding test shall be well-filtered No. 0 light diesel oil in accordance with GB252. 3.2 The plunger pair diameter sealing test shall be carried out under the following conditions. The test oil is a mixture of diesel and engine oil, and its kinematic viscosity is 10.2~10.7cst at 20℃: a.
Ambient temperature is 20±1℃;
Pressure display device
Range: 0~40MPa
Accuracy: ±0.1MPa:
d, intake pressure: 0.2~0.5MPa compressed air. 4 Test method
4.1. Sliding property test of plunger pair
After cleaning and lubricating the parts with well-filtered No. 0 light diesel oil that meets the requirements of GB252, place the plunger pair at a 45° angle to the horizontal, and pull out 1/3 of the length of the working surface of the plunger from the plunger sleeve. The plunger rotates around its axis to any position. After letting go, the plunger can slide down by its own weight without any obstruction. 4.2 Plunger pair diameter sealing test
4.2.1 The plunger pair diameter sealing test is carried out using an isobaric test method. During the test, the sealing end face of the plunger sleeve is blocked, and the pressure in the space above the plunger is 20±0.3MPa.
4.2.2 The angular position of the plunger sleeve relative to the oil return hole of the plunger sleeve (geometric effective stroke of the plunger sleeve) shall comply with the provisions of Table 2 of JB/T7173.1 or be implemented in accordance with the technical documents approved by the prescribed procedures. 4.2.3 Other oil pressure or air pressure test methods are allowed for the plunger pair diameter sealing test, but it must be ensured that the sample quality requirements specified in Article 3.10 of JB/T7173.1 are met. 4.3 Reliability test of plunger pair
Reliability test method of plunger pair shall be in accordance with the provisions of Appendix A (supplement) Approved by the Ministry of Machinery Industry on November 21, 1993
Implemented on March 1, 1994
A1 Test sample
JB/T 7173.293
Appendix A
Reliability test method of plunger pair
(supplement)wwW.bzxz.Net
The plunger pair to be tested for reliability shall comply with the provisions of product drawings and relevant technical documents, and shall be inspected by the factory inspection department. Samples shall be taken at the production warehouse or at the end of the production line, with a sample matrix of no less than 90 pairs; samples shall be taken from users or the market, and 8 pairs shall be randomly sampled without limiting the number of sample matrices.
A2 Test method
A2.1 The reliability test of plunger pair is to install it in the fuel injection pump and perform cold drag operation on the indoor fuel injection pump reliability test bench. A2.2 The reliability test of the plunger pair is carried out according to the 750h timed truncation test method. A2.3 The reliability test conditions of the plunger pair are the same as those of the fuel injection ticket. A2.4 If the plunger pair is damaged during the test, it is judged as failed, and the test of the failed sample is stopped. A2.5 At the end of the 750h test, the plunger pair should be checked for the sealing of the diameter according to the provisions of Article 3.10 of JB/T7173.1. If the sealing value is lower than the lower limit of the sealing value of similar products (maximum for intermediate acid) for more than 3s, it is judged as failed. A3 Time of failure
A3.1 If the failure can be discovered in time, the exact time of failure should be recorded. A3.2 For failures that cannot be discovered in time, determine their occurrence time T according to formula (A1). If n failures occur within the time interval (t, t, 3), then the time of occurrence of the mth failure is: To = t- +
Additional explanation:
-t, -- t,1-
This standard is proposed and managed by Wuxi Oil Pump and Nozzle Research Institute of the Ministry of Machinery Industry. This standard was drafted by Wuxi Oil Pump and Nozzle Research Institute, Shanghai Internal Combustion Engine Research Institute and other units. The main drafters of this standard are Zheng Valna and Xu Guanming. 2
..(A1)
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- HG/T 2529-1993 Fluorescence logging sheet
- GA 305-2001 General technical requirements for flame retardant PVC plastic flat conduits for electrical installations
- GB/T 5478-1985 Test method for rolling wear of plastics
- JB/T 7266-1994 Volumetric vacuum pump performance measurement method
- GB 16930.1-1997 Safety color markings for blind canes
- GB 16808-1997 Technical requirements and test methods for combustible gas alarm controllers
- JB/T 7030-1993 Technical Specifications for Non-magnetic Guard Ring Forgings for 300-600MW Turbogenerators
- GBJ 303-1988 Building electrical installation engineering quality inspection and assessment standard GBJ303-88
- JB/T 7531-1994 Design specification for spun parts
- GB/T 15826.1-1995 General requirements for machining allowances and tolerances of hammer-forged steel free forgings
- HY/T 140-2011 Specifications for the survey of marine microbenthos
- GB 15983-1995 Measles diagnostic criteria and treatment principles
- GB/T 15121.4-1996 Information technology - Computer graphics - Metatext for storage and transmission of graphic description information - Part 4: Clear text coding
- GBJ 47-1983 Specification for measurement of sound absorption coefficient using the reverberation chamber method
- BB/T 0012-2008 Polyvinylidene chloride (PVDC) coated film
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]