您好,欢迎来到标准下载网!全站导航 ↗
标准下载网WWW.BZXZ.NET
标准下载网/IEC 60071-5 Insulation Coordination-5 Procedures f

IEC 60071-5 Insulation Coordination-5 Procedures f

绝缘配合 – 第5部分:高压直流(HVDC)换流站程序

IEC 60071-5 Insulation Coordination-5 Procedures for high-voltage direct current(HVDC) converter stations

Insulation co-ordination – Part 5: Procedures for high-voltage direct current (HVDC) converter stations

版本年份 2002 文件语言 英语 全文 6 页 格式 PDF
IEC 60071-5 Insulation Coordination-5 Procedures f 绝缘配合 – 第5部分:高压直流(HVDC)换流站程序封面

标准信息

STANDARD INFORMATION
标准编号
IEC 60071-5 Insulation Coordination-5 Procedures f
所属分类
IEC 国际电工标准
发布机构
IEC
版本年份
2002
文件语言
英语
文件格式
PDF
文件页数
6 页
文件大小
936.24 KB

中文名称为参考译名,文件语言以原文为准。

· 更新:

标准简介

OVERVIEW

中文简介

该标准规定了高压直流(HVDC)换流站中绝缘配合的程序和方法。它详细阐述了直流系统与交流系统在绝缘设计上的主要区别,并提供了针对换流站中不同位置(如阀、避雷器等)的连续运行电压、峰值电压及过电压水平的评估方法。

English summary

This standard specifies the procedures and methods for insulation coordination in high-voltage direct current (HVDC) converter stations. It details the essential differences between DC and AC systems for insulation design and provides methods for assessing continuous operating voltages, peak voltages, and overvoltage levels at various locations within the station, such as valves and arresters.

以上为根据文件整理的内容简介。

相关标签

标准内容预览

DOCUMENT PREVIEW
点击页码切换内容
IEC 60071-5 Insulation Coordination-5 Procedures fPDF 第 1 页 · 原页码 1

List of figures and tables

Figure B.4a – Circuit configuration for stresses on valve arrester at earth fault on HV bushing of converter transformer (CCC converter) 66

Figure B.4b – Circuit configuration for stresses on valve arrester at earth fault on HV bushing of converter transformer (CSCC converter) 66

Figure B.5a – Stresses on valve arrester V1 during earth fault on HV bushing of converter transformer (CCC converter) 67

Figure B.5b – Stresses on valve arrester V1 during earth fault on HV bushing of converter transformer (CSCC converter) 67

Figure B.6a – Stresses on CCC capacitor arrester Ccc during earth fault on HV bushing of converter transformer (CCC converter) 68

Figure B.6b – Stresses on CSCC capacitor arrester Csc during earth fault on HV bushing of converter transformer (CSCC converter) 68

Figure C.1 – Expanded HVDC converter with parallel valve groups 70

Figure C.2 – Upgraded HVDC converter with series valve group 72

Table 1 – Symbol description 14

Table 2 – Comparison of the selection of withstand voltages for three-phase a.c. equipment with that for HVDC converter station equipment 17

Table 3 – Events stressing the different arresters 27

Table 4 – Types of stresses on arresters for different events 27

Table 5 – Origin of overvoltages and associated frequency ranges 28

Table 6 – Table for arrester requirements 32

Table 7 – Arrester protection of d.c. side of a HVDC converter station 34

Table 8 – Table gathering representative overvoltage levels and required withstand voltage levels 35

Table 9 – Indicative values of ratios of required impulse withstand voltage to impulse protective level 37

6

1
第 1 / 6 页

预览内容由文件识别整理,表格、公式及文字请以原始文件为准。

原文图片预览

PAGE IMAGES

下载标准文件

IEC 60071-5 Insulation Coordination-5 Procedures f

英语 · PDF · 6 页 · 936.24 KB

前往网盘下载 ↗
IEC 60071-5 Insulation Coordination-5 Procedures f英语 · PDF
下载文件 ↓