NZS4510 2008 Fire Hydrant Systems for Buildings
建筑物消火栓系统
NZS4510 2008 Fire Hydrant Systems for Buildings
Fire hydrant systems for buildings
标准信息
STANDARD INFORMATION- 标准编号
- NZS4510 2008 Fire Hydrant Systems for Buildings
- 所属分类
- NZS 新西兰标准
- 发布机构
- Standards New Zealand
- 版本年份
- 2008
- 文件语言
- 英语
- 文件格式
- 文件页数
- 6 页
- 文件大小
- 2.06 MB
中文名称为参考译名,文件语言以原文为准。
· 更新:
标准简介
OVERVIEW中文简介
该标准规定了建筑物消火栓系统的设计、安装、测试和维护要求。它适用于新西兰建筑中的消火栓系统,包括一般要求、设计准则、消火栓出口与入口、管道、泵、施工、测试和维护等内容。
English summary
This standard specifies requirements for the design, installation, testing, and maintenance of fire hydrant systems in buildings. It applies to building hydrant systems in New Zealand and covers general requirements, design criteria, outlets, inlets, pipework, pumps, construction, testing, and maintenance.
以上为根据文件整理的内容简介。
相关标签
标准内容预览
DOCUMENT PREVIEWContents
| 5.5 | Connection pipe to system | 43 |
| 5.6 | Fire service reference documents | 43 |
| 5.7 | Duplicated building hydrant inlets | 44 |
| 5.8 | Test outlets | 44 |
| 6 | PIPEWORK AND PRESSURE CONTROL | 45 |
| 6.1 | Piping sizing | 45 |
| 6.2 | Pressure control and test facilities | 45 |
| 6.3 | Gauges and valves | 50 |
| 6.4 | Hydraulic calculation | 51 |
| 7 | PUMPS | 55 |
| 7.1 | Pump unit | 55 |
| 7.2 | Pumps | 55 |
| 7.3 | Drivers | 56 |
| 7.4 | Pump starting and stopping | 69 |
| 7.5 | Pump unit installation | 72 |
| 7.6 | Pump unit enclosure | 73 |
| 8 | CONSTRUCTION AND DEMOLITION | 75 |
| 8.1 | Hydrant system availability | 75 |
| 8.2 | Precautions during installation | 75 |
| 8.3 | Temporary inlets | 75 |
| 8.4 | Demolition | 76 |
| 9 | TESTING, MAINTENANCE, AND IMPAIRMENTS | 77 |
| 9.1 | Acceptance tests and inspections | 77 |
| 9.2 | Routine tests and inspections | 78 |
| 9.3 | Maintenance | 80 |
| 9.4 | Building alterations | 80 |
| 9.5 | Precautions to be taken when an installation is rendered inoperative | 80 |
| Appendix | ||
| A | Systems installed to superseded Standards (Informative) | 83 |
| B | Signs (Informative) | 85 |
| C | Low-rise buildings (Informative) | 87 |
| D | Matters declared by New Zealand Fire Service National Commander (Normative) | 93 |
| E | Drawing conventions for use in hydrant system diagrams (Informative) | 95 |
| F | Checklist for pump installations (Informative) | 97 |
| G | Annual inspection checklist and maintenance schedule for diesel engines (Informative) | 103 |
| H | Sample notification forms (Informative) | 105 |
6
COMMITTEE REPRESENTATION
This Standard was prepared under the supervision of the P 4510 Committee the Standards Council established under the Standards Act 1988.
The committee consisted of representatives of the following nominating organisations:
BRANZ Ltd
Corporation of Insurance Brokers
Department of Building and Housing
Fire Inspection Services
Fire Protection Association
Fire Protection Contractors' Association
Insurance Council of New Zealand
IPENZ
Local Government New Zealand
New Zealand Fire Equipment Manufacturers' Association
New Zealand Fire Service
and other individuals who were co-opted onto the committee by Standards New Zealand.
ACKNOWLEDGEMENT
Standards New Zealand gratefully acknowledges the contribution of time and expertise from all those involved in developing this Standard.
Cover photo by courtesy of Wormald.
COPYRIGHT
The copyright of this document is the property of the Standards Council. No part of it may be reproduced by photocopying or by any other means without the prior written approval of the Chief Executive of Standards New Zealand unless the circumstances are covered by Part III of the Copyright Act 1994.
Standards New Zealand will vigorously defend the copyright in this Standard. Every person who breaches Standards New Zealand's copyright may be liable to a fine not exceeding $50,000 or to imprisonment for a term not to exceed three months. If there has been a flagrant breach of copyright, Standards New Zealand may also seek additional damages from the infringing party, in addition to obtaining injunctive relief and an account of profits.
Published by Standards New Zealand, the trading arm of the Standards Council, Private Bag 2439, Wellington 6140. Telephone (04) 498 5990, Fax (04) 498 5994, Website www.standards.co.nz.
| No. | Date of issue | Description | Entered by, and date |
|---|---|---|---|
| 1 | 30 January 2009 | Aligns NZS 4510:2008 with the Compliance Documents to the New Zealand Building Code and updates the referenced documents to incorporate the most recently published Standards | Incorporated in this edition |
2
NZS 4510:2008
New Zealand Standard
Fire hydrant systems for buildings
Superseding NZS 4510:1998
ISBN 1-86975-073-X
3
NOTES
4
CONTENTS
| Committee representation | IFC |
| Acknowledgement | IFC |
| Copyright | IFC |
| Value statement | 6 |
| Referenced documents | 6 |
| Latest revisions | 8 |
| Foreword | 9 |
| 1 General | 11 |
| 1.1 Scope | 11 |
| 1.2 Objective | 11 |
| 1.3 Definitions | 12 |
| 1.4 Abbreviations | 14 |
| 1.5 Interpretation | 15 |
| 1.6 Formal interpretations | 15 |
| 2 GENERAL REQUIREMENTS | 17 |
| 2.1 Approval of building hydrant system | 17 |
| 2.2 Vehicular access | 17 |
| 2.3 Materials | 17 |
| 2.4 Seismic resistance | 21 |
| 2.5 Frost protection | 30 |
| 2.6 Labelling and signs | 30 |
| 2.7 Preliminary approval of basic design decisions | 31 |
| 2.8 Electrical bonding | 31 |
| 3 DESIGN CRITERIA | 33 |
| 3.1 Pressure required at outlet | 33 |
| 3.2 Number and spacing of outlets per floor | 33 |
| 3.3 Required flow rates | 35 |
| 3.4 Requirement for booster pumps | 35 |
| 3.5 Pipework to be charged with water | 36 |
| 3.6 Optional provision of pressurised water source | 36 |
| 4 BUILDING HYDRANT OUTLETS | 37 |
| 4.1 Location | 37 |
| 4.2 Outlet assembly | 37 |
| 5 BUILDING HYDRANT INLET | 39 |
| 5.1 Location | 39 |
| 5.2 Enclosure | 39 |
| 5.3 Inlets | 42 |
| 5.4 Other equipment in enclosure | 43 |
5
Contents
| 5.5 | Connection pipe to system | 43 |
| 5.6 | Fire service reference documents | 43 |
| 5.7 | Duplicated building hydrant inlets | 44 |
| 5.8 | Test outlets | 44 |
| 6 | PIPEWORK AND PRESSURE CONTROL | 45 |
| 6.1 | Piping sizing | 45 |
| 6.2 | Pressure control and test facilities | 45 |
| 6.3 | Gauges and valves | 50 |
| 6.4 | Hydraulic calculation | 51 |
| 7 | PUMPS | 55 |
| 7.1 | Pump unit | 55 |
| 7.2 | Pumps | 55 |
| 7.3 | Drivers | 56 |
| 7.4 | Pump starting and stopping | 69 |
| 7.5 | Pump unit installation | 72 |
| 7.6 | Pump unit enclosure | 73 |
| 8 | CONSTRUCTION AND DEMOLITION | 75 |
| 8.1 | Hydrant system availability | 75 |
| 8.2 | Precautions during installation | 75 |
| 8.3 | Temporary inlets | 75 |
| 8.4 | Demolition | 76 |
| 9 | TESTING, MAINTENANCE, AND IMPAIRMENTS | 77 |
| 9.1 | Acceptance tests and inspections | 77 |
| 9.2 | Routine tests and inspections | 78 |
| 9.3 | Maintenance | 80 |
| 9.4 | Building alterations | 80 |
| 9.5 | Precautions to be taken when an installation is rendered inoperative | 80 |
| Appendix | ||
| A | Systems installed to superseded Standards (Informative) | 83 |
| B | Signs (Informative) | 85 |
| C | Low-rise buildings (Informative) | 87 |
| D | Matters declared by New Zealand Fire Service National Commander (Normative) | 93 |
| E | Drawing conventions for use in hydrant system diagrams (Informative) | 95 |
| F | Checklist for pump installations (Informative) | 97 |
| G | Annual inspection checklist and maintenance schedule for diesel engines (Informative) | 103 |
| H | Sample notification forms (Informative) | 105 |
6
预览内容由文件识别整理,表格、公式及文字请以原始文件为准。
原文图片预览
PAGE IMAGES下载标准文件
NZS4510 2008 Fire Hydrant Systems for Buildings
英语 · PDF · 6 页 · 2.06 MB