HG/T 20519.9-1992 Equipment Installation Drawing
time:
2024-08-14 10:09:22
- HG/T 20519.9-1992
- in force
Standard ID:
HG/T 20519.9-1992
Standard Name:
Equipment Installation Drawing
Chinese Name:
设备安装图
Standard category:
Chemical industry standards (HG)
-
Date of Release:
1993-01-18 -
Date of Implementation:
1993-04-01
Standard ICS number:
General, Terminology, Standardization, Documentation>>Technical Drawing>>01.100.01 Technical Drawing General 71.010China Standard Classification Number:
>>>>G0 Engineering Construction>>Raw Materials Industry, Communications, Broadcasting Engineering>>P72 Petrochemical, Chemical Engineering
Skip to download
Summary:
HG/T 20519.9-1992 Equipment Installation Drawing HG/T20519.9-1992 Standard Download Decompression Password: www.bzxz.net
Some standard content:
Equipment installation drawing
HG 20519. 9-92
1Overview
Equipment installation drawing
HG 20519.9-92
The design model of the equipment installation drawing refers to some equipment installation details that need to be designed by the device layout professionals, except for the equipment brackets and operating tables designed by the civil engineering or equipment professionals, such as the retaining frame at the top of the tower, the pads under the cold insulation equipment support, and the installation drawings of the purchased equipment spring brackets. In order to count materials and facilitate construction, installation drawings must be drawn in accordance with this regulation. 2 Drawing format and scale
The drawing format is generally A3 or A2. The scale is generally 1:20 or 1:10. 3Just above the title bar, a material table is listed, and its format and content are shown in the example figure. 4Instructions or notes
Instructions or notes should be placed above the material table to write technical requirements or construction requirements and the adopted standards and specifications.
See example drawing
TXXX cooling tower retaining frame installation drawing
4-M16 anchor bolts, exposed 40 on the foundation surface, pre-buried by civil engineering professionals, with nuts and washers. Welding procedures are in accordance with JB/Z105-73GB985-786-80. The roughness of the fur surface is plate surface, and the rest.
【Drawing number or standard number
T×××× cooling tower
Retaining frame installation drawing (example drawing)
Weight (kg)
Project name:bzxz.net
Design project:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
HG 20519. 9-92
1Overview
Equipment installation drawing
HG 20519.9-92
The design model of the equipment installation drawing refers to some equipment installation details that need to be designed by the device layout professionals, except for the equipment brackets and operating tables designed by the civil engineering or equipment professionals, such as the retaining frame at the top of the tower, the pads under the cold insulation equipment support, and the installation drawings of the purchased equipment spring brackets. In order to count materials and facilitate construction, installation drawings must be drawn in accordance with this regulation. 2 Drawing format and scale
The drawing format is generally A3 or A2. The scale is generally 1:20 or 1:10. 3Just above the title bar, a material table is listed, and its format and content are shown in the example figure. 4Instructions or notes
Instructions or notes should be placed above the material table to write technical requirements or construction requirements and the adopted standards and specifications.
See example drawing
TXXX cooling tower retaining frame installation drawing
4-M16 anchor bolts, exposed 40 on the foundation surface, pre-buried by civil engineering professionals, with nuts and washers. Welding procedures are in accordance with JB/Z105-73GB985-786-80. The roughness of the fur surface is plate surface, and the rest.
【Drawing number or standard number
T×××× cooling tower
Retaining frame installation drawing (example drawing)
Weight (kg)
Project name:bzxz.net
Design project:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 6939.2-2004 Controllers for off-grid wind turbines Part 2: Test methods
- SJ 20676-1998 General specification for solid-state broadband power amplifier modules for communication countermeasures
- JB/T 8023.1-1999 Knurled handles for machine tool fixture parts and components
- GB/T 5009.100-2003 Analytical methods for hygienic standards of expanded polystyrene products for food packaging
- SY/T 5324-1994 Prestressed Insulated Oil Pipe
- JB/T 51192-1999 Agricultural screw oil press product quality classification
- GB/T 3543.4-1995 Inspection procedures for crop seeds Germination test
- GB/T 8177-2004 Two-point internal micrometer
- GB/T 5009.107-2003 Determination of diazinon residues in plant-derived foods
- HG/T 2765.5-1996 Silicone test method
- GB/T 16830-1997 Bar code in dispatch unit
- SJ 20709-1998 Format and encoding of military vector digital map files
- GB/T 3653.4-1988 Chemical analysis methods for ferroboron - EDTA volumetric method for determination of aluminum content
- JB/T 7220-1994 Scraper discharge centrifuge
- HG 2161-1991 Tricyclazole wettable powder
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com