HG/T 20519.9-1992 Equipment Installation Drawing
time:
2024-08-14 10:09:22
- HG/T 20519.9-1992
- in force
Standard ID:
HG/T 20519.9-1992
Standard Name:
Equipment Installation Drawing
Chinese Name:
设备安装图
Standard category:
Chemical industry standards (HG)
-
Date of Release:
1993-01-18 -
Date of Implementation:
1993-04-01
Standard ICS number:
General, Terminology, Standardization, Documentation>>Technical Drawing>>01.100.01 Technical Drawing General 71.010China Standard Classification Number:
>>>>G0 Engineering Construction>>Raw Materials Industry, Communications, Broadcasting Engineering>>P72 Petrochemical, Chemical Engineering
Skip to download
Summary:
HG/T 20519.9-1992 Equipment Installation Drawing HG/T20519.9-1992 Standard Download Decompression Password: www.bzxz.net
Some standard content:
Equipment installation drawing
HG 20519. 9-92
1Overview
Equipment installation drawing
HG 20519.9-92wwW.bzxz.Net
The design model of the equipment installation drawing refers to some equipment installation details that need to be designed by the device layout professionals, except for the equipment brackets and operating tables designed by the civil engineering or equipment professionals, such as the retaining frame at the top of the tower, the pads under the cold insulation equipment support, and the installation drawings of the purchased equipment spring brackets. In order to count materials and facilitate construction, installation drawings must be drawn in accordance with this regulation. 2 Drawing format and scale
The drawing format is generally A3 or A2. The scale is generally 1:20 or 1:10. 3Just above the title bar, a material table is listed, and its format and content are shown in the example figure. 4Instructions or notes
Instructions or notes should be placed above the material table to write technical requirements or construction requirements and the adopted standards and specifications.
See example drawing
TXXX cooling tower retaining frame installation drawing
4-M16 anchor bolts, exposed 40 on the foundation surface, pre-buried by civil engineering professionals, with nuts and washers. Welding procedures are in accordance with JB/Z105-73GB985-786-80. The roughness of the fur surface is plate surface, and the rest.
【Drawing number or standard number
T×××× cooling tower
Retaining frame installation drawing (example drawing)
Weight (kg)
Project name:
Design project:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
HG 20519. 9-92
1Overview
Equipment installation drawing
HG 20519.9-92wwW.bzxz.Net
The design model of the equipment installation drawing refers to some equipment installation details that need to be designed by the device layout professionals, except for the equipment brackets and operating tables designed by the civil engineering or equipment professionals, such as the retaining frame at the top of the tower, the pads under the cold insulation equipment support, and the installation drawings of the purchased equipment spring brackets. In order to count materials and facilitate construction, installation drawings must be drawn in accordance with this regulation. 2 Drawing format and scale
The drawing format is generally A3 or A2. The scale is generally 1:20 or 1:10. 3Just above the title bar, a material table is listed, and its format and content are shown in the example figure. 4Instructions or notes
Instructions or notes should be placed above the material table to write technical requirements or construction requirements and the adopted standards and specifications.
See example drawing
TXXX cooling tower retaining frame installation drawing
4-M16 anchor bolts, exposed 40 on the foundation surface, pre-buried by civil engineering professionals, with nuts and washers. Welding procedures are in accordance with JB/Z105-73GB985-786-80. The roughness of the fur surface is plate surface, and the rest.
【Drawing number or standard number
T×××× cooling tower
Retaining frame installation drawing (example drawing)
Weight (kg)
Project name:
Design project:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 8484-1996 Gear chamfering machine accuracy inspection
- GB/T 27937.2-2011 MPR publication—Part 2:Specification of MPR code symbols
- GB/T 5271.3-1987 Data processing vocabulary Part 03 Equipment technology
- JB/T 6410-1992 Mobile dual-zone electrostatic precipitator unit
- JG/T 73-1999 Stainless steel building profiles
- GB/T 21782.8-2008 Coating powders—Part 8:Assessment of the storage stability of thermosetting powders
- JB/T 10357-2002 Constant force disc spring support and hanger
- JB/T 8002-1999 Superabrasive products - Synthetic diamond or cubic boron nitride grinding paste
- GB/T 15072.19-1994 Chemical analysis methods for precious metals and their alloys - Determination of chromium content in gold alloys
- GB 8943.1-1988 Determination of copper content in pulp, paper and paperboard
- GB/T 3746.2-1983 Compression-type cross fitting
- SJ 3228.2-1989 General rules for methods of analysis for high purity arenaceous quartz
- JJG 932-1998 Verification Regulation of Piezoresistive Vacuum Gauge
- QX/T 238-2019 Technical specifications for broadcasting and receiving of FY-3B/C/D meteorological satellite data
- GB 19456-2004 Safety specification for inspection of hazardous properties of dangerous goods such as nitrates
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:wymp4wang@gmail.com