
Gas-filled microwave switching tubes,Type RX-202, RX-203
time:
2024-07-13 19:56:49
- SJ 2246-1982
- in force
Standard ID:
SJ 2246-1982
Standard Name:
Gas-filled microwave switching tubes,Type RX-202, RX-203
Chinese Name:
RX202、RX203型微波气体放电管
Standard category:
Electronic Industry Standard (SJ)
-
Date of Release:
1982-12-26 -
Date of Implementation:
1983-07-01 -
Date of Expiration:
2010-01-20
China Standard Classification Number:
General>>Standardization Management and General Provisions>>A01 Technical Management

Skip to download
Summary:
SJ 2246-1982 RX202, RX203 type microwave gas discharge tube SJ2246-1982 standard download decompression password: www.bzxz.net

Some standard content:
Ministry of Electronics Industry of the People's Republic of China Standard SJ2246-82
RX-203 type microwave gas discharge tube
RX-202#
Published on December 22, 1982
Implementation on July 1, 1983
Ministry of Electronics Industry of the People's Republic of China
Ministry of Electronics Industry of the People's Republic of China Standard RX-220, RX-203 type microwave gas discharge tube SJ2246-82
This standard applies to RX-202, RX--203 type microwave gas discharge tubes (hereinafter referred to as "switch tubes"), which are ten-centimeter-band broadband pre-protection switch tubes and are used in radar equipment with a waveguide system of 72.14mm×34.04mm. www.bzxz.net
This standard is a supplement to the general technical requirements of microwave gas discharge tubes (SJ343-73) (hereinafter referred to as "general technical requirements"). Except for the contents specified in this standard, the other contents shall be implemented in accordance with the relevant provisions of the general technical requirements. 1 Dimensions
The dimensions of the switch tube shall comply with the provisions of Figure ! 2 Parameter specifications
The parameters of the switch tube shall comply with the provisions of the parameter specification table. Glass and metal sealing test
Take 10 switch tubes (it is allowed to take tubes with some items of the same process that are unqualified, but the total leakage power must be qualified) for a single glass and metal sealing test. First, use 5 tubes for the test. After the test, all the switch tubes are qualified and the test is qualified. The other 5 will not be tested. If one of the five switches fails, another five switches shall be tested. If all switches pass the test, the test is qualified. If two (or more) of the five switches tested first fail, or one (or more) of the five switches fail in the subsequent test, the test is unqualified. A retest is required according to the provisions of the general technical department.
If all the switches pass the test in the first quarter (or three consecutive months), the test will not be conducted again this year. Otherwise, it shall be carried out according to the general technical department.
4 Impact test
The acceleration is 5g, the impact frequency is 50 to 70 times/min, and the impact is 500 times in the vertical and horizontal directions. 5 Amplitude recovery time
The amplitude recovery time is calculated based on the attenuation of the received signal by the switch tube as 3dB. 6 Low temperature test under working state
After maintaining the ambient temperature at -55±2℃ for 30 minutes, the amplitude recovery time is measured with high power.
7 High temperature test under working condition
Under the condition of ambient temperature of 70±2℃. After maintaining for 30 minutes, add high power to measure the total leakage power. Ministry of Electronics Industry of the People's Republic of China Issued on December 22, 1982 and implemented on July 1, 1983
SJ2246-82
8 When the output of switch tubes is less than 100 per quarter (or for three consecutive months), routine tests shall be carried out once every six months (or for six consecutive months). The tests shall be carried out in accordance with Articles 17, 18 and 19 of the General Technology (SJ343-73) and Article 3 of this standard.
9 When the output of switches is less than 100 per quarter (or for three consecutive months), life tests shall be carried out once every six months (or for six consecutive months). The tests shall be carried out in accordance with Articles 22 and 23 of the General Technology (SJ343-73). 10 Life test
10.1 Take 5 switching tubes for life test. 10.2 During the life test, the standard life parameters are tested at 200, 300, 334, 350, 380 and 400 hours respectively.
10.3 See Appendix (Supplement) for the principle diagram of life test.11 Weight
The weight of the switching tube is inspected once a year.
12When RX--202 and RX--203 microwave gas discharge tubes are continuously produced, routine tests and life tests can be carried out on any one tube. The results can be used to replace the other tube. 13When using the switching tube, a soft metal gasket should be added to the connection surface to ensure good contact. 14Article 3, Article 5 (2) and Article 7 (2) of General Technical SJ343-73 are not applicable to this standard. Model standard
82-087
43±05
Modulator
Magnetron
SJ2246-82
Life test schematic
(supplement)
External size
Total overpower
Voltage fluctuation series
Electric zone rectification coefficient
Total input loss
Radiation epidemic recovery time
Iron welcome you
Multi-moisture overload request||t t||tidal test
total melting rate
quality limit technology under the name of the work
perform the family time
upper state under the Gundam
S:J224682
202 use teaching liquid gas tube to report the standard ticket
250:-7845
2898~2845
2695~2845
2685~2845
Hua Shen City Car
Fumei Water
350± 25
350±a5
350±35±0.1
rstors
18, 18
Alarm strength test
Total device voltage
Burst test
Total device voltage
Glass and metal scratch test
Total continuous power
Life test
Life standard
1. Overload of starter
2. Unloading when amplitude is restored
Continued table 1
SJ2246-82
RX-202 special specification for gas discharge tube
2695~2845
2695~2 845
2895~2845
26952845
2685~2845
2695~2845
350±35
350±3b
350±35
400±40
350±35
2.5±0.25
Note, for the test, the heart volume note is for the enjoyment and recovery of the wine delivery. When we get the test, the test subject can choose a domestic class in 269~2848MH2. -ss
Dimensions
Editor-in-chief
Voltage gain coefficient
Voltage range
Total input
Total input loss specification
Resolution recovery time
Low temperature test
Total leakage rate
Tidal test
Total leakage over-rate
Low temperature test under working conditions
Long recovery time
Education test under working conditions
B code 3
SJ2246-82||tt ||RX-207 Micro-designed Gas Discharge Tube Number Energy Range Research
2965~3115
2965~3115
2965~3115
2865~3115
2965-3115
2865~3115
Zhushen Motor Vehicle
Medical Center Ding Hospital
850±351±0.1
350±$5
360±35
350±35
35e± 35
350±38
Test plan
16-17,
89928S
Joint consumption monitoring test
Total device overpower
Impact test
Total overload rate
Share consumption and metal adjustment test
Total social work
Life test
Life standard,
1.Total end overload rate
s, amplitude recovery time reading
Happy fee 2
SJ2246—82
RX—20 strong microwave gas effect tube number report source ticket Wu
29853115
2965~3115
2905~3115
65~3115
2865~3115
2965~3115
Recommendation
God you
350±35
380±85
150±35
400±40
350±35
300± 35
Wide leather
2.5±0.25
students, come to the whole, always choose the model of the share of the United States for testing, the more controlled rate can be in 2965~8118H2 product national standard one product selection line, 396
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
RX-203 type microwave gas discharge tube
RX-202#
Published on December 22, 1982
Implementation on July 1, 1983
Ministry of Electronics Industry of the People's Republic of China
Ministry of Electronics Industry of the People's Republic of China Standard RX-220, RX-203 type microwave gas discharge tube SJ2246-82
This standard applies to RX-202, RX--203 type microwave gas discharge tubes (hereinafter referred to as "switch tubes"), which are ten-centimeter-band broadband pre-protection switch tubes and are used in radar equipment with a waveguide system of 72.14mm×34.04mm. www.bzxz.net
This standard is a supplement to the general technical requirements of microwave gas discharge tubes (SJ343-73) (hereinafter referred to as "general technical requirements"). Except for the contents specified in this standard, the other contents shall be implemented in accordance with the relevant provisions of the general technical requirements. 1 Dimensions
The dimensions of the switch tube shall comply with the provisions of Figure ! 2 Parameter specifications
The parameters of the switch tube shall comply with the provisions of the parameter specification table. Glass and metal sealing test
Take 10 switch tubes (it is allowed to take tubes with some items of the same process that are unqualified, but the total leakage power must be qualified) for a single glass and metal sealing test. First, use 5 tubes for the test. After the test, all the switch tubes are qualified and the test is qualified. The other 5 will not be tested. If one of the five switches fails, another five switches shall be tested. If all switches pass the test, the test is qualified. If two (or more) of the five switches tested first fail, or one (or more) of the five switches fail in the subsequent test, the test is unqualified. A retest is required according to the provisions of the general technical department.
If all the switches pass the test in the first quarter (or three consecutive months), the test will not be conducted again this year. Otherwise, it shall be carried out according to the general technical department.
4 Impact test
The acceleration is 5g, the impact frequency is 50 to 70 times/min, and the impact is 500 times in the vertical and horizontal directions. 5 Amplitude recovery time
The amplitude recovery time is calculated based on the attenuation of the received signal by the switch tube as 3dB. 6 Low temperature test under working state
After maintaining the ambient temperature at -55±2℃ for 30 minutes, the amplitude recovery time is measured with high power.
7 High temperature test under working condition
Under the condition of ambient temperature of 70±2℃. After maintaining for 30 minutes, add high power to measure the total leakage power. Ministry of Electronics Industry of the People's Republic of China Issued on December 22, 1982 and implemented on July 1, 1983
SJ2246-82
8 When the output of switch tubes is less than 100 per quarter (or for three consecutive months), routine tests shall be carried out once every six months (or for six consecutive months). The tests shall be carried out in accordance with Articles 17, 18 and 19 of the General Technology (SJ343-73) and Article 3 of this standard.
9 When the output of switches is less than 100 per quarter (or for three consecutive months), life tests shall be carried out once every six months (or for six consecutive months). The tests shall be carried out in accordance with Articles 22 and 23 of the General Technology (SJ343-73). 10 Life test
10.1 Take 5 switching tubes for life test. 10.2 During the life test, the standard life parameters are tested at 200, 300, 334, 350, 380 and 400 hours respectively.
10.3 See Appendix (Supplement) for the principle diagram of life test.11 Weight
The weight of the switching tube is inspected once a year.
12When RX--202 and RX--203 microwave gas discharge tubes are continuously produced, routine tests and life tests can be carried out on any one tube. The results can be used to replace the other tube. 13When using the switching tube, a soft metal gasket should be added to the connection surface to ensure good contact. 14Article 3, Article 5 (2) and Article 7 (2) of General Technical SJ343-73 are not applicable to this standard. Model standard
82-087
43±05
Modulator
Magnetron
SJ2246-82
Life test schematic
(supplement)
External size
Total overpower
Voltage fluctuation series
Electric zone rectification coefficient
Total input loss
Radiation epidemic recovery time
Iron welcome you
Multi-moisture overload request||t t||tidal test
total melting rate
quality limit technology under the name of the work
perform the family time
upper state under the Gundam
S:J224682
202 use teaching liquid gas tube to report the standard ticket
250:-7845
2898~2845
2695~2845
2685~2845
Hua Shen City Car
Fumei Water
350± 25
350±a5
350±35±0.1
rstors
18, 18
Alarm strength test
Total device voltage
Burst test
Total device voltage
Glass and metal scratch test
Total continuous power
Life test
Life standard
1. Overload of starter
2. Unloading when amplitude is restored
Continued table 1
SJ2246-82
RX-202 special specification for gas discharge tube
2695~2845
2695~2 845
2895~2845
26952845
2685~2845
2695~2845
350±35
350±3b
350±35
400±40
350±35
2.5±0.25
Note, for the test, the heart volume note is for the enjoyment and recovery of the wine delivery. When we get the test, the test subject can choose a domestic class in 269~2848MH2. -ss
Dimensions
Editor-in-chief
Voltage gain coefficient
Voltage range
Total input
Total input loss specification
Resolution recovery time
Low temperature test
Total leakage rate
Tidal test
Total leakage over-rate
Low temperature test under working conditions
Long recovery time
Education test under working conditions
B code 3
SJ2246-82||tt ||RX-207 Micro-designed Gas Discharge Tube Number Energy Range Research
2965~3115
2965~3115
2965~3115
2865~3115
2965-3115
2865~3115
Zhushen Motor Vehicle
Medical Center Ding Hospital
850±351±0.1
350±$5
360±35
350±35
35e± 35
350±38
Test plan
16-17,
89928S
Joint consumption monitoring test
Total device overpower
Impact test
Total overload rate
Share consumption and metal adjustment test
Total social work
Life test
Life standard,
1.Total end overload rate
s, amplitude recovery time reading
Happy fee 2
SJ2246—82
RX—20 strong microwave gas effect tube number report source ticket Wu
29853115
2965~3115
2905~3115
65~3115
2865~3115
2965~3115
Recommendation
God you
350±35
380±85
150±35
400±40
350±35
300± 35
Wide leather
2.5±0.25
students, come to the whole, always choose the model of the share of the United States for testing, the more controlled rate can be in 2965~8118H2 product national standard one product selection line, 396
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- QB/T 2280-1996 转椅
- GB/T 4313-2002 Information technology - General specification for braided print ribbons for office machines and printers
- GB 19268-2003 Solid cyanide package
- GB/T 5053.3-1985 Test methods and requirements for electrical connectors between vehicles and trailers
- JB/T 8931-1999 Ultrasonic flaw detection method for weld overlay
- GB 8772-1988 Seat arrangement range and illumination sanitation standard for TV classrooms
- HG/T 2882-1997 Determination of drying performance of driers
- JGJ 106-1997 Code for high strain dynamic testing of pile foundations JGJ106-97
- GB 17203-1998 Food additive calcium citrate
- GB/T 15862-1995 General technical requirements for ion implanters
- SL/T 231-1998 Technical specification for polyethylene (PE) geomembrane anti-seepage engineering SL/T 231-98
- GB/T 34313-2017 Grading and evaluation standard of tour guides
- QX/T 496-2019 Monitoring indices of rainy season in China—Autumu rain of West China
- GB/T 33713-2017 Process control and measurement methods for heatset web offset printing
- NY/T 1464.20-2007 Guidelines on efficacy evaluation of pesticedes Part 20: Herbicide control weed in tomato field
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]