
YB/T 4117-2003 Test method for burst resistance of dense refractory castables
time:
2024-08-09 22:02:30
- YB/T 4117-2003
- in force
Standard ID:
YB/T 4117-2003
Standard Name:
Test method for burst resistance of dense refractory castables
Chinese Name:
致密耐火浇注料抗爆裂性试验方法
Standard category:
Metallurgical Industry Standard (YB)
-
Date of Release:
2003-03-18 -
Date of Implementation:
2003-06-01
Standard ICS number:
Glass and ceramic industry >> 81.080 Refractory materialsChina Standard Classification Number:
Building Materials>>Refractory Materials>>Q46 Unshaped Refractory Materials
publishing house:
China Standards PressISBN:
155066.2-15228Publication date:
2004-04-19
Drafter:
Hu Zhiwei, Wang ZhanminDrafting Organization:
Luoyang Refractory Research InstituteFocal point Organization:
National Technical Committee for Refractory StandardizationProposing Organization:
National Technical Committee for Refractory StandardizationPublishing Department:
State Economic and Trade Commission

Skip to download
Summary:
This standard specifies the terms and definitions, principles, specimens, test equipment and procedures, test results and test reports for the test method of dense refractory castables for burst resistance. This standard is applicable to the burst resistance test of dense refractory castables below 1000℃. The test of burst resistance of other amorphous refractory materials can also refer to this standard. YB/T 4117-2003 Test method for burst resistance of dense refractory castables YB/T4117-2003 Standard download decompression password: www.bzxz.net

Some standard content:
ICS 87. nRO
Ferrous Metallurgical Industry Standard of the People's Republic of China YB/T 41172003
Test method
Tes1 method for explosion resistanceof dense refractory castables2003-03-18Published
State Economic and Trade Commission
2003-06-01Implementation
Standard for ferrous metallurgy of the People's Republic of China YB/T 41172003
Test method
Tes1 method for explosion resistanceof dense refractory castables2003-03-18Published
State Economic and Trade Commission
2003-06-01Implementation
Standard for ferrous metallurgy of the People's Republic of China YB/T 41172003 This standard is drafted by the responsible person of the National Institute of Refractory Materials Science and Technology, YB/7117-2C03
1 Scope
Test method for explosion resistance of dense refractory castables YI/T4117-2003
This standard specifies the terms and definitions, procedures, test specimens, test equipment, test results and test methods for explosion resistance of dense refractory castables.
This standard specifies the following explosion resistance test methods for dense refractory castables. Other non-standard explosion resistance tests of refractory castables can also refer to this standard. 2 Normative references
The following clauses are standard clauses through reference to the standard. The referenced documents of the date of this standard shall not be applicable to this standard. However, the parties who have reached an agreement on the standard may not use the original versions of these documents. For any referenced documents of the date of this standard, the latest versions shall apply to this standard. YB, TE2C2.2 2003 Refractory material test specimen preparation method Part 1 Refractory material 3 Safety tips
This test has certain risks
4 Terms and definitions
This standard shall not use the following terms and definitions!
Explosion
Refractory combustion In the process of rapid humidity rise, the gas generated inside the mountain is discharged in time to form a block or a front. 4.2
iWelding temperature temperaturrofati-exploslon If the test column does not burst below the final setting, but bursts above this fluidity, the fluid setting temperature is defined as the temperature change resistance of the material.
5 Principle
Put the sample in the test chamber at the set temperature, observe whether the sample is ripe during the actual return of the knife. The main resistance of the material to cracking is measured randomly.
6 Test sample
6.1 Size of the test sample
The size of the test sample is mmm5um
5.2 Preparation and maintenance of the test sample
The preparation and maintenance of the test sample shall be carried out in parallel at 3 times. 6.3 Number of samples
At the shortest point in the test, 3 samples shall be selected and tested. Test equipment and procedure shall be reduced.
7.1 Test preparation
YB/T4117—200 3Www.bzxZ.net
7.1.1.1 The test temperature should be within the range of 10°C. The test temperature should be within the range of 10°C. 7.1.1.2 The test furnace should be able to move 3! The rise rate should not be less than 5/\. 7.1.1.3 The height of the test furnace should not be less than 50mm×1.Grmmm. The test should not be accepted in the test furnace. The distance between the sample and the finished sample should be less than 52mm. The test should be able to pull the sample immediately. 7.2 Test process should be
72.1 The test furnace should be preheated to the set temperature for 3:m. 7.2.2 After demoulding, the test mold should be reduced to During the test, the temperature should be quickly reached and the door should be closed immediately. The temperature drop should not be too large within 42.10mia. The furnace should be set as the temperature source. The sample should be kept for 30min.7.2.3 Check whether the sample is cracked. If the sample is cracked, raise the temperature of the furnace and use another test bar to test it separately in 7.2.2. 7.2. The batch of test pieces should be transported after the test. If not, separate sample preparation should be carried out. During the test, the test pieces should be placed in the irradiated slurry.
3 Test results
31 If one of the three parallel test pieces is dry, it is considered that the sample is cracked. 8.2 If the test piece is tested collectively The rod is dried at the first set temperature change, and the resistance temperature of the test rod is considered to be less than this temperature: 83 If the sample does not burst under the set flow, but bursts at a higher temperature, then the set temperature is the fracture standard of the sample:
8.4 If the test bar still bursts at the required correct temperature at 10 o'clock, the test can be terminated and the resistance change at this temperature can be expressed.
9 Test report
The test requirements should include the following:
) Taizhou single machine:
h) Test bar name and brand:
) Test mixer number:
) The standard used
! Field test results;
) Test location
R Test period:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Ferrous Metallurgical Industry Standard of the People's Republic of China YB/T 41172003
Test method
Tes1 method for explosion resistanceof dense refractory castables2003-03-18Published
State Economic and Trade Commission
2003-06-01Implementation
Standard for ferrous metallurgy of the People's Republic of China YB/T 41172003
Test method
Tes1 method for explosion resistanceof dense refractory castables2003-03-18Published
State Economic and Trade Commission
2003-06-01Implementation
Standard for ferrous metallurgy of the People's Republic of China YB/T 41172003 This standard is drafted by the responsible person of the National Institute of Refractory Materials Science and Technology, YB/7117-2C03
1 Scope
Test method for explosion resistance of dense refractory castables YI/T4117-2003
This standard specifies the terms and definitions, procedures, test specimens, test equipment, test results and test methods for explosion resistance of dense refractory castables.
This standard specifies the following explosion resistance test methods for dense refractory castables. Other non-standard explosion resistance tests of refractory castables can also refer to this standard. 2 Normative references
The following clauses are standard clauses through reference to the standard. The referenced documents of the date of this standard shall not be applicable to this standard. However, the parties who have reached an agreement on the standard may not use the original versions of these documents. For any referenced documents of the date of this standard, the latest versions shall apply to this standard. YB, TE2C2.2 2003 Refractory material test specimen preparation method Part 1 Refractory material 3 Safety tips
This test has certain risks
4 Terms and definitions
This standard shall not use the following terms and definitions!
Explosion
Refractory combustion In the process of rapid humidity rise, the gas generated inside the mountain is discharged in time to form a block or a front. 4.2
iWelding temperature temperaturrofati-exploslon If the test column does not burst below the final setting, but bursts above this fluidity, the fluid setting temperature is defined as the temperature change resistance of the material.
5 Principle
Put the sample in the test chamber at the set temperature, observe whether the sample is ripe during the actual return of the knife. The main resistance of the material to cracking is measured randomly.
6 Test sample
6.1 Size of the test sample
The size of the test sample is mmm5um
5.2 Preparation and maintenance of the test sample
The preparation and maintenance of the test sample shall be carried out in parallel at 3 times. 6.3 Number of samples
At the shortest point in the test, 3 samples shall be selected and tested. Test equipment and procedure shall be reduced.
7.1 Test preparation
YB/T4117—200 3Www.bzxZ.net
7.1.1.1 The test temperature should be within the range of 10°C. The test temperature should be within the range of 10°C. 7.1.1.2 The test furnace should be able to move 3! The rise rate should not be less than 5/\. 7.1.1.3 The height of the test furnace should not be less than 50mm×1.Grmmm. The test should not be accepted in the test furnace. The distance between the sample and the finished sample should be less than 52mm. The test should be able to pull the sample immediately. 7.2 Test process should be
72.1 The test furnace should be preheated to the set temperature for 3:m. 7.2.2 After demoulding, the test mold should be reduced to During the test, the temperature should be quickly reached and the door should be closed immediately. The temperature drop should not be too large within 42.10mia. The furnace should be set as the temperature source. The sample should be kept for 30min.7.2.3 Check whether the sample is cracked. If the sample is cracked, raise the temperature of the furnace and use another test bar to test it separately in 7.2.2. 7.2. The batch of test pieces should be transported after the test. If not, separate sample preparation should be carried out. During the test, the test pieces should be placed in the irradiated slurry.
3 Test results
31 If one of the three parallel test pieces is dry, it is considered that the sample is cracked. 8.2 If the test piece is tested collectively The rod is dried at the first set temperature change, and the resistance temperature of the test rod is considered to be less than this temperature: 83 If the sample does not burst under the set flow, but bursts at a higher temperature, then the set temperature is the fracture standard of the sample:
8.4 If the test bar still bursts at the required correct temperature at 10 o'clock, the test can be terminated and the resistance change at this temperature can be expressed.
9 Test report
The test requirements should include the following:
) Taizhou single machine:
h) Test bar name and brand:
) Test mixer number:
) The standard used
! Field test results;
) Test location
R Test period:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- HG/T 2129.10-1991 Plate-type liquid level gauges for chemical equipment parts made of acid-resistant phenolic plastics
- CH 1016-2008 Safety specification for surveying and mapping personnel
- GB 2718-2003 Sauce Hygiene Standard
- GB/Z 19736-2005 Electronic imaging—Guidance for selection of document image compression methods
- GB 14591-1993 Water purification agent polymerized ferric sulfate
- SY/T 5601-1993 Geological evaluation methods for natural gas reservoirs
- GB/T 14543-1993 Principles for the visual design of graphical symbols for use on signs
- GB 5606.5-1996 Technical indicators of mainstream smoke and tobacco chemistry
- JB/T 5349.2-1991 Basic parameters of notching machine
- SY 0043-1996 Oil and gas field surface pipeline and equipment color standard
- GB/T 13854-1992 Jet tube electro-hydraulic servo valve
- GB 10672-1989 Technical requirements for wheels of tower cranes GB10672-89
- CJJ 28-1989 Specification for Construction and Acceptance of Urban Heating Pipeline Network Projects CJJ28-89
- NY 5010-2002 Environmental conditions for the production of pollution-free vegetables
- JB/T 9750.2-1999 Technical requirements for valve rocker shafts of internal combustion engines
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com