
Guideline for the work of complex standardization Principle and method
time:
2024-07-15 19:12:08
- GB/T 12366.1-1990
- Abolished
Standard ID:
GB/T 12366.1-1990
Standard Name:
Guideline for the work of complex standardization Principle and method
Chinese Name:
综合标准化工作导则 原则与方法
Standard category:
National Standard (GB)
-
Date of Release:
1990-06-18 -
Date of Implementation:
1991-04-01 -
Date of Expiration:
2009-11-01
Standard ICS number:
General, Terminology, Standardization, Documentation >> 01.120 General Principles of StandardizationChina Standard Classification Number:
General>>Standardization Management and General Regulations>>A00 Standardization, Quality Management
alternative situation:
Replaced by GB/T 12366-2009
Release date:
1990-06-18Review date:
2004-10-14Drafter:
Zhu Sicheng, He Zhenhua, Song Enlie, Zhang GuiyuanDrafting Organization:
China Institute of Standardization and Information Classification and CodingFocal point Organization:
China National Institute of StandardizationProposing Organization:
State Bureau of Technical SupervisionPublishing Department:
State Bureau of Technical SupervisionCompetent Authority:
General Administration of Quality Supervision, Inspection and Quarantine

Skip to download
Summary:
This standard specifies the terminology, basic principles, working procedures and methods of comprehensive standardization. This standard applies to comprehensive standardization activities for various standardization objects. GB/T 12366.1-1990 Guidelines, principles and methods for comprehensive standardization GB/T12366.1-1990 Standard download decompression password: www.bzxz.net
This standard specifies the terminology, basic principles, working procedures and methods of comprehensive standardization. This standard applies to comprehensive standardization activities for various standardization objects.
This standard specifies the terminology, basic principles, working procedures and methods of comprehensive standardization. This standard applies to comprehensive standardization activities for various standardization objects.

Some standard content:
National Standard of the People's Republic of China
Guideline for the work of complex standardization
Principles and methods
Guideline for the work of complex standardizationPrinciples and methods
1 Subject matter and scope of application
This standard specifies the terminology, basic principles, working procedures and methods of complex standardization. This standard is applicable to the comprehensive standardization activities of various standardization objects. 2 Terminology
2.1 Related elements
Factors that affect the functional requirements or specific requirements of the comprehensive standardization object, Note: The final product and other card objects selected when carrying out comprehensive standardization activities. 2.2 Standard complex
GB/T 12366.1...90
A set of standards that coordinates and optimizes the relevant indicators formed by the comprehensive standardization object and its related elements according to their internal connections or functional requirements and cooperates with each other.
2.3 Comprehensive Standardization
In order to achieve the specified target, use the system analysis method: establish a standard complex and implement the standardization activities. 3 Basic principles
3.1 Treat the comprehensive standardization object and its related elements as a system to carry out standardization work. 3.2 The scope of the comprehensive standardization object and its related elements should be clear and relatively complete. 3.3 The whole process of comprehensive standardization should be planned and organized. 3.4 The overall benefit of the system (including the comprehensive benefits of technology, economy and society) is the most important standard. The local benefits are subject to the overall benefits.
3.5 The requirements of the lower level should be subject to the higher level in the standard complex. 3.6 Make full use of the existing standards. If necessary, the current standards can be revised or supplemented. 3.7 The formulation and implementation of each standard in the standard complex should be coordinated. 4 Working procedures
The working procedures of comprehensive standardization are shown in the following table: Approved by the State Administration of Technology on June 18, 1990 Implementation on April 1, 1991
Preparation stage
Planning stage
Standard formulation stage
Implementation stage
5 Preparation stage
5.1 Determine the object
GB/T 12366. 1-90
Confirm the target
Establish a coordination organization
Determine the standard
Prepare a standard complex plan
Prepare a work plan
Establish a standard complex
Organize implementation
Evaluate and accept
See Article 5.1
See Article 52
See Article 6.1
See Article 6.2
See Article 7.1
See Article 7. Article 2
See Article 8.1
See Article 8.2
Select the comprehensive standardization object according to the needs of scientific and technological development and national economic construction. Before determining the comprehensive standardization object, a feasibility analysis must be carefully conducted.
5.2 Coordination Mechanism
According to the comprehensive standardization object, personnel from all relevant parties shall form an authoritative coordination organization to be responsible for the coordination and organization and implementation of the standard complex. www.bzxz.net
The coordination organization shall establish a strict work system, clarify responsibilities and division of labor, and Determine the target
Collect data related to the comprehensive standardization object, accurately grasp its domestic and international status and development trend through analysis and comparison, and rationally determine the target that the comprehensive standardization object should achieve based on the forecast results and actual possibilities of technological and economic development, so as to fully reflect its overall optimality. 6.2 Prepare the comprehensive standardization system plan
6.2.1 Systematic analysis of the object
6.2.1.1 Through the analysis of data, conduct a systematic analysis of the comprehensive standardization object, find out the various related factors that affect the determined target, and clarify the internal connection and function between the comprehensive standardization object and related key elements. 6.2.1.2 Reasonably determine the scope of the comprehensive standardization object and its related elements. 6.2.1.3 Draw a relevant system diagram of the comprehensive standardization object or give a textual description to clarify its system relationship. The diagram and text should meet the following requirements:
8 Clear hierarchy, clear primary and secondary structure, clear scope: b. The relevant elements are appropriately selected and the number is moderate. 6.2.2 Standard decomposition
According to the internal connection or functional requirements of the comprehensive standardization object and its related elements, the determined standard is decomposed into its specific standard values. 6.2.2.1 The decomposed standard value should be able to ensure the realization of the determined standard. 6.2.2.2 Target value - generally should be quantified.
6.2.2.3 Adequately demonstrate various possible target decomposition schemes and select the best one. 6.2.3 Prepare a draft standard complex planning
According to the results of the system analysis of the object and the target decomposition, prepare a draft standard complex planning to clarify the composition of the standard complex. 6.2.3.1 The draft standard complex plan shall include all standards that can ensure the overall best of the comprehensive standardization object. 6.2.3.2 Each standard shall be systematically processed and appropriately classified according to nature and scope to make its composition reasonable. 6.2.4 Review
GB/I12366.1-90
Relevant experts shall be organized to review and approve the draft standard complex plan to form a formal standard promotion complex plan. 7 Standard formulation stage
7. 1 Work plan formulation
The coordination organization shall, based on the standard composition requirements stipulated in the standard promotion complex plan, check the existing standards, determine the standards that need to be formulated and revised, and formulate a work plan.
7.1.1 Where there are existing standards that can meet the overall requirements, the existing standards shall be cited instead of formulating new standards. If they cannot meet the requirements, the existing standards shall be revised or supplementary requirements shall be proposed. If there are no corresponding standards, new standards shall be formulated. 7.1.2 According to the relationship between the standards in the standard complex plan, determine the order and time of the formulation and revision of various standards. 7.1.3 The formulation and revision tasks of various standards should be included in the formulation and revision plans of standards at all levels to ensure the coordination of the formulation and revision plans of standards at all levels.
7.1.4 In addition to specifying the names of the items for the formulation and revision of standards, the work plan should also clarify the main content and requirements of each standard, the scope of application, the relationship with other standards, the responsible units and persons in charge of the items, the participating units and participants, the start and end time, etc. 7.2 Establish a standard complex
7.2.! The coordination agency should organize the start and end of the formulation of enterprise standards according to the requirements of the work plan and establish a standard complex. 7.2.1.1 Formulate work rules to guide the activities of relevant personnel participating in the comprehensive standardization work. 7.2.7.2 Based on the overall situation, the relevant parties should cooperate closely and coordinate their actions. 7.2.1.3 The technical contents of the relevant standards should be coordinated and the implementation period should be coordinated. 7.2.1.4 The decomposed daily standards should be guaranteed in the relevant indicators of the corresponding standards. 7.2.2 According to the progress of the work, test verification shall be carried out by manufacturing prototypes or demonstration work. If the overall verification cycle is too long, partial verification can be carried out. Through test verification, the original work plan and the inappropriate contents in some standards can be appropriately adjusted. 7.2.3 After the establishment of the standard complex, the coordination organization shall summarize the work of the establishment of the standard promotion complex based on the test verification results.
8 Implementation stage
8.1 Organization and implementation
8.1.7 The relevant departments or production units shall implement the various standards in time according to the prescribed implementation time of each standard to achieve the monthly standard of comprehensive standardization.
8.1.2 After the implementation of the standard promotion complex, it shall be regularly inspected and revised. Continuously update and enrich the standard complex. A dedicated person should be designated to follow up and inspect the implementation process of the standard, record relevant data and materials during the implementation process, and provide good information feedback: 8.2 Evaluation and Acceptance
Other competent departments can organize relevant units and personnel to conduct evaluation and acceptance based on the technical and economic benefits of the standard after comprehensive implementation. Additional Notes:
The standard was proposed by the State Technical Supervision Bureau of Liaoning Province:
This standard was drafted by the China Institute of Standardization and Information Classification and Coding, and the 78th Institute of the Ministry of Aerospace and the Liaoning Provincial Technical Supervision Bureau participated.
The main drafters of this standard are Jing Chao, He Zhenhua, Zhu Sicheng, and Fang Shuide.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Guideline for the work of complex standardization
Principles and methods
Guideline for the work of complex standardizationPrinciples and methods
1 Subject matter and scope of application
This standard specifies the terminology, basic principles, working procedures and methods of complex standardization. This standard is applicable to the comprehensive standardization activities of various standardization objects. 2 Terminology
2.1 Related elements
Factors that affect the functional requirements or specific requirements of the comprehensive standardization object, Note: The final product and other card objects selected when carrying out comprehensive standardization activities. 2.2 Standard complex
GB/T 12366.1...90
A set of standards that coordinates and optimizes the relevant indicators formed by the comprehensive standardization object and its related elements according to their internal connections or functional requirements and cooperates with each other.
2.3 Comprehensive Standardization
In order to achieve the specified target, use the system analysis method: establish a standard complex and implement the standardization activities. 3 Basic principles
3.1 Treat the comprehensive standardization object and its related elements as a system to carry out standardization work. 3.2 The scope of the comprehensive standardization object and its related elements should be clear and relatively complete. 3.3 The whole process of comprehensive standardization should be planned and organized. 3.4 The overall benefit of the system (including the comprehensive benefits of technology, economy and society) is the most important standard. The local benefits are subject to the overall benefits.
3.5 The requirements of the lower level should be subject to the higher level in the standard complex. 3.6 Make full use of the existing standards. If necessary, the current standards can be revised or supplemented. 3.7 The formulation and implementation of each standard in the standard complex should be coordinated. 4 Working procedures
The working procedures of comprehensive standardization are shown in the following table: Approved by the State Administration of Technology on June 18, 1990 Implementation on April 1, 1991
Preparation stage
Planning stage
Standard formulation stage
Implementation stage
5 Preparation stage
5.1 Determine the object
GB/T 12366. 1-90
Confirm the target
Establish a coordination organization
Determine the standard
Prepare a standard complex plan
Prepare a work plan
Establish a standard complex
Organize implementation
Evaluate and accept
See Article 5.1
See Article 52
See Article 6.1
See Article 6.2
See Article 7.1
See Article 7. Article 2
See Article 8.1
See Article 8.2
Select the comprehensive standardization object according to the needs of scientific and technological development and national economic construction. Before determining the comprehensive standardization object, a feasibility analysis must be carefully conducted.
5.2 Coordination Mechanism
According to the comprehensive standardization object, personnel from all relevant parties shall form an authoritative coordination organization to be responsible for the coordination and organization and implementation of the standard complex. www.bzxz.net
The coordination organization shall establish a strict work system, clarify responsibilities and division of labor, and Determine the target
Collect data related to the comprehensive standardization object, accurately grasp its domestic and international status and development trend through analysis and comparison, and rationally determine the target that the comprehensive standardization object should achieve based on the forecast results and actual possibilities of technological and economic development, so as to fully reflect its overall optimality. 6.2 Prepare the comprehensive standardization system plan
6.2.1 Systematic analysis of the object
6.2.1.1 Through the analysis of data, conduct a systematic analysis of the comprehensive standardization object, find out the various related factors that affect the determined target, and clarify the internal connection and function between the comprehensive standardization object and related key elements. 6.2.1.2 Reasonably determine the scope of the comprehensive standardization object and its related elements. 6.2.1.3 Draw a relevant system diagram of the comprehensive standardization object or give a textual description to clarify its system relationship. The diagram and text should meet the following requirements:
8 Clear hierarchy, clear primary and secondary structure, clear scope: b. The relevant elements are appropriately selected and the number is moderate. 6.2.2 Standard decomposition
According to the internal connection or functional requirements of the comprehensive standardization object and its related elements, the determined standard is decomposed into its specific standard values. 6.2.2.1 The decomposed standard value should be able to ensure the realization of the determined standard. 6.2.2.2 Target value - generally should be quantified.
6.2.2.3 Adequately demonstrate various possible target decomposition schemes and select the best one. 6.2.3 Prepare a draft standard complex planning
According to the results of the system analysis of the object and the target decomposition, prepare a draft standard complex planning to clarify the composition of the standard complex. 6.2.3.1 The draft standard complex plan shall include all standards that can ensure the overall best of the comprehensive standardization object. 6.2.3.2 Each standard shall be systematically processed and appropriately classified according to nature and scope to make its composition reasonable. 6.2.4 Review
GB/I12366.1-90
Relevant experts shall be organized to review and approve the draft standard complex plan to form a formal standard promotion complex plan. 7 Standard formulation stage
7. 1 Work plan formulation
The coordination organization shall, based on the standard composition requirements stipulated in the standard promotion complex plan, check the existing standards, determine the standards that need to be formulated and revised, and formulate a work plan.
7.1.1 Where there are existing standards that can meet the overall requirements, the existing standards shall be cited instead of formulating new standards. If they cannot meet the requirements, the existing standards shall be revised or supplementary requirements shall be proposed. If there are no corresponding standards, new standards shall be formulated. 7.1.2 According to the relationship between the standards in the standard complex plan, determine the order and time of the formulation and revision of various standards. 7.1.3 The formulation and revision tasks of various standards should be included in the formulation and revision plans of standards at all levels to ensure the coordination of the formulation and revision plans of standards at all levels.
7.1.4 In addition to specifying the names of the items for the formulation and revision of standards, the work plan should also clarify the main content and requirements of each standard, the scope of application, the relationship with other standards, the responsible units and persons in charge of the items, the participating units and participants, the start and end time, etc. 7.2 Establish a standard complex
7.2.! The coordination agency should organize the start and end of the formulation of enterprise standards according to the requirements of the work plan and establish a standard complex. 7.2.1.1 Formulate work rules to guide the activities of relevant personnel participating in the comprehensive standardization work. 7.2.7.2 Based on the overall situation, the relevant parties should cooperate closely and coordinate their actions. 7.2.1.3 The technical contents of the relevant standards should be coordinated and the implementation period should be coordinated. 7.2.1.4 The decomposed daily standards should be guaranteed in the relevant indicators of the corresponding standards. 7.2.2 According to the progress of the work, test verification shall be carried out by manufacturing prototypes or demonstration work. If the overall verification cycle is too long, partial verification can be carried out. Through test verification, the original work plan and the inappropriate contents in some standards can be appropriately adjusted. 7.2.3 After the establishment of the standard complex, the coordination organization shall summarize the work of the establishment of the standard promotion complex based on the test verification results.
8 Implementation stage
8.1 Organization and implementation
8.1.7 The relevant departments or production units shall implement the various standards in time according to the prescribed implementation time of each standard to achieve the monthly standard of comprehensive standardization.
8.1.2 After the implementation of the standard promotion complex, it shall be regularly inspected and revised. Continuously update and enrich the standard complex. A dedicated person should be designated to follow up and inspect the implementation process of the standard, record relevant data and materials during the implementation process, and provide good information feedback: 8.2 Evaluation and Acceptance
Other competent departments can organize relevant units and personnel to conduct evaluation and acceptance based on the technical and economic benefits of the standard after comprehensive implementation. Additional Notes:
The standard was proposed by the State Technical Supervision Bureau of Liaoning Province:
This standard was drafted by the China Institute of Standardization and Information Classification and Coding, and the 78th Institute of the Ministry of Aerospace and the Liaoning Provincial Technical Supervision Bureau participated.
The main drafters of this standard are Jing Chao, He Zhenhua, Zhu Sicheng, and Fang Shuide.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- JB/T 7946.3-1999 Pinholes in cast aluminum alloys
- GB 15982-1995 医院消毒卫生标准
- SL 27-1991 Sluice Construction Specification SL 27-91
- YS/T 462-2003 Copper and copper alloy tube, rod and wire product defects
- GB/T 5095.8-1997 Basic test procedures and measurement methods for electromechanical components for electronic equipment Part 8: Mechanical tests for connectors, contacts and terminals
- JB/T 7972-1999 Carbide helical tooth taper shank end mill
- QB/T 1641-1992 Chemical analysis method for gypsum for ceramics
- HG/T 2273.4-1992 Test methods for catalysts for the first and second stage conversion of natural gas
- HG/T 2305-1992 Industrial Methyl Methacrylate
- JB/T 7951-1999 Test method for cooling performance of quenching medium
- JB/T 7068-2002 Metal expanders for transformers
- JGJ 80-1991 Technical Specification for Safety of Height Operations in Construction
- CECS : 0388 钻芯法检测混凝土强度技术规程CECS03:88
- GB/T 5059.7-1988 Chemical analysis methods for ferromolybdenum - Determination of carbon content by infrared absorption method
- JB/T 9841-1999 Spring tube thermometer for tractors and internal combustion engines
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]