GB/T 11606.4-1989 Environmental test methods for analytical instruments High temperature test
time:
2024-08-06 11:04:27
- GB/T 11606.4-1989
- Abolished
Standard ID:
GB/T 11606.4-1989
Standard Name:
Environmental test methods for analytical instruments High temperature test
Chinese Name:
分析仪器环境试验方法 高温试验
Standard category:
National Standard (GB)
-
Date of Release:
1989-03-31 -
Date of Implementation:
1990-03-01 -
Date of Expiration:
2007-12-01
Standard ICS number:
Test >> 19.040 Environmental TestChina Standard Classification Number:
Instruments and meters>>Material composition analysis instruments and environmental monitoring instruments>>N50 Material composition analysis instruments and environmental monitoring instruments comprehensive
alternative situation:
Replaced by GB/T 11606-2007
Review date:
2004-10-14Drafting Organization:
Beijing Analytical Instruments InstituteFocal point Organization:
National Technical Committee for Industrial Process Measurement and Control StandardizationPublishing Department:
China Machinery Industry FederationCompetent Authority:
China Machinery Industry Federation

Skip to download
Summary:
GB/T 11606.4-1989 Environmental test methods for analytical instruments High temperature test GB/T11606.4-1989 Standard download decompression password: www.bzxz.net

Some standard content:
National Standard of the People's Republic of China
Environmental test method for analytical instruments
High temperature test
The method of environmental test for analytical instrumentsHigh temperature test
Subject content and scope of application
This standard specifies the high temperature test grouping, test conditions and test methods for analytical instruments (hereinafter referred to as instruments). This standard is applicable to the assessment of the adaptability of instruments to work under high temperature environmental conditions. High temperature test grouping
Working temperature
Limit working temperature
Rated working temperature
3 Test conditions
3.1 Requirements for test equipment
GB11606.4---89
3.1.1 The test chamber (room) shall be able to provide the temperature specified in Chapter 2 of this standard in its working space, with an allowable error of ±2°C. The instrument shall not be directly radiated by any heating and cooling elements. 3.1.2 Instruments with special requirements for wind speed, vibration and other influencing factors of the test chamber (room) may be stated in the product standard. 3.1.3 The volume of the test box (room) should be greater than 3 times the volume of the instrument. 3.1.4 The water vapor in the test box (room) shall not exceed 20g/m (equivalent to 50% relative humidity at 35°C). When the test temperature is lower than 35°C, the relative humidity shall not exceed 50%. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test duration
The duration of the instrument temperature test should be selected from the following times: 1, 2, 4h. If there is no separate regulation, 1h is taken. 5 Test method
5.1 Pretreatment
Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 5.2 Initial inspection
Inspect the instrument in accordance with the relevant standards. 5.3 Test
Put the instrument in the test box (room) and power it on, then raise the temperature of the test box (room) to the specified value at an average temperature change rate of less than 1C/min. Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
GB11606.4-89
and maintain it for the specified temperature test duration. 5.4 Intermediate inspection
Immediately after the temperature test duration is reached, perform performance inspection in accordance with the relevant standards. After the recoverywww.bzxz.net
The instrument should remain in the test box (room) and stop working, and then reduce the temperature to normal (or reference) environmental conditions at an average temperature change rate of less than 1℃/min. The recovery time after reaching normal temperature is 1h if there is no separate regulation. 5.6 Final inspection
Inspect the instrument in accordance with the relevant standards. Details to be specified when citing this standard
Items and requirements for initial inspection;
Duration of test:
Items and requirements for intermediate inspection during the test; Items and requirements for final inspection.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
Environmental test method for analytical instruments
High temperature test
The method of environmental test for analytical instrumentsHigh temperature test
Subject content and scope of application
This standard specifies the high temperature test grouping, test conditions and test methods for analytical instruments (hereinafter referred to as instruments). This standard is applicable to the assessment of the adaptability of instruments to work under high temperature environmental conditions. High temperature test grouping
Working temperature
Limit working temperature
Rated working temperature
3 Test conditions
3.1 Requirements for test equipment
GB11606.4---89
3.1.1 The test chamber (room) shall be able to provide the temperature specified in Chapter 2 of this standard in its working space, with an allowable error of ±2°C. The instrument shall not be directly radiated by any heating and cooling elements. 3.1.2 Instruments with special requirements for wind speed, vibration and other influencing factors of the test chamber (room) may be stated in the product standard. 3.1.3 The volume of the test box (room) should be greater than 3 times the volume of the instrument. 3.1.4 The water vapor in the test box (room) shall not exceed 20g/m (equivalent to 50% relative humidity at 35°C). When the test temperature is lower than 35°C, the relative humidity shall not exceed 50%. 3.2 Requirements for instruments
When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests.
4 Test duration
The duration of the instrument temperature test should be selected from the following times: 1, 2, 4h. If there is no separate regulation, 1h is taken. 5 Test method
5.1 Pretreatment
Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 5.2 Initial inspection
Inspect the instrument in accordance with the relevant standards. 5.3 Test
Put the instrument in the test box (room) and power it on, then raise the temperature of the test box (room) to the specified value at an average temperature change rate of less than 1C/min. Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990
GB11606.4-89
and maintain it for the specified temperature test duration. 5.4 Intermediate inspection
Immediately after the temperature test duration is reached, perform performance inspection in accordance with the relevant standards. After the recoverywww.bzxz.net
The instrument should remain in the test box (room) and stop working, and then reduce the temperature to normal (or reference) environmental conditions at an average temperature change rate of less than 1℃/min. The recovery time after reaching normal temperature is 1h if there is no separate regulation. 5.6 Final inspection
Inspect the instrument in accordance with the relevant standards. Details to be specified when citing this standard
Items and requirements for initial inspection;
Duration of test:
Items and requirements for intermediate inspection during the test; Items and requirements for final inspection.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 27067-2006 Conformity assessment - Fundamental of product certification
- HG/T 3034-1999 Flat plate vulcanizing press
- GB 3223-1982 Free-field calibration method for underwater acoustic transducers
- JB/T 5883.5-1991 电控设备图样及技术文件 完整性
- GB/T 16733-1997 Stage division and code of procedure for development of national STANDARDs
- GB/T 3775-1983 General provisions for the inspection of pesticide emulsifiers
- GB/T 11693-1994 Marine flange welded single-sided seat plate
- JB/T 3411.85-1999 Dimensions of 45° boring bars with taper shank
- HG/T 2665-1995 Reactive Yellow K-4G (Active Yellow K-4G)
- GB/T 33706-2017 Standard pyrheliometer
- JB/T 10262-2001 Sealed lead-acid batteries for electric power-assisted vehicles
- JB/T 2462.14-1999 Dimensions of floor-standing intermediate bases for common components of modular machine tools
- HG/T 2045-1991 Quality classification of mechanical seals for kettles
- GB 18421-2001 Marine Biological Quality
- HG/T 20668-2000 Provisions for the preparation of design documents for chemical equipment
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:[email protected]