
CBM 1106-1982 Water tank air pipe head
time:
2024-09-20 19:57:38
- CBM 1106-1982
- in force
Standard ID:
CBM 1106-1982
Standard Name:
Water tank air pipe head
Chinese Name:
水舱空气管头
Standard category:
Ship Industry Standard (CB)
-
Date of Implementation:
1993-09-01
Standard ICS number:
Shipbuilding and offshore structures>>Shipbuilding and offshore structures>>47.020.30 Piping systemsChina Standard Classification Number:
Ship>>Ship Pipe Accessories>>U54 Marine Ventilation Accessories

Skip to download
Summary:
CBM 1106-1982 Water tank air pipe head CBM1106-1982 standard download decompression password: www.bzxz.net

Some standard content:
China State Shipbuilding Corporation Foreign Trade Standards
CBM1106-82
Air Pipe Heads for Water Tanks
Published on 1983-01-i9
China State Shipbuilding Corporation
Implemented on 1983-05-01
Standard Data Collector www.17bzW.cn Yiqi Standard Network provides free download of 100,000 standard books and data. Can type, 5 minutes fast self-service website building www.17jzW.com Yiqi website building network provides free website building platform, commercial website 1 year only 60 yuan China State Shipbuilding Corporation Foreign Trade Standards
Air Pipe Heads for Water Tanks
CeMHOE-82
Li Biaoxiong specifies air pipe heads for water tanks. Flange connection dimensions and JIS B 22-19771, basic reference table! ,
50 ~ 250
2. Basic dimensions refer to Figure 2 and Table 2
Dg 50. 65
Applicable medium
Sea water. PingshuiWww.bzxZ.net
Dg 80~250
China State Shipbuilding Corporation 1983-01-19 Issued 1983-05-0/Implementation
Standard Data Collector www.17bzW.cn Yiqi Standard Network provides free download of 100,000 standard books and data. Can type, 5 minutes fast self-service website building www.17jzw.com Yiqi website building network provides free website building platform, commercial website 1 year only 60 yuan Z
Nominal diameter structure size
CBM1106-22
Note, special requirements can provide full-face flange size
Marking example
Dg100 water tank air pipe head
Air pipe head 100
CBM1106-82
3. Material table 3 of main parts .
Parts name
Body cover
Guide bolt
Ductile iron
Nickel-chromium stainless steel
Aluminum bronze
Zinc iron
QT40-17
ICr18Ni9
QA29-2
Standard number
GB/348-78
GB/220-75
YB458-7
YB180-63
4After assembling the air pipe head, conduct a sealing test on the buoy and the sealing port. The test pressure is 3 water column height and the test lasts for 5 minutes. There should be no water shock, but small water leakage is allowed. 5. Other technical requirements G8600-82,
6 flange connection size CBM 1005-
Additional instructions:
This standard is proposed by the pipe system accessories group and is managed by Dalian Shipyard; this standard is drafted by Dalian Shipyard
The main drafter of this standard is Meijihua.
Standard data collector www.17bzW.cn Yiqi Standard Network provides free download of 100,000 standard books and data, can type, and quickly build a website in 5 minutes www.17jzw.com Yiqi website building network provides free website building platform, commercial website 1 year only 60 yuan
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
CBM1106-82
Air Pipe Heads for Water Tanks
Published on 1983-01-i9
China State Shipbuilding Corporation
Implemented on 1983-05-01
Standard Data Collector www.17bzW.cn Yiqi Standard Network provides free download of 100,000 standard books and data. Can type, 5 minutes fast self-service website building www.17jzW.com Yiqi website building network provides free website building platform, commercial website 1 year only 60 yuan China State Shipbuilding Corporation Foreign Trade Standards
Air Pipe Heads for Water Tanks
CeMHOE-82
Li Biaoxiong specifies air pipe heads for water tanks. Flange connection dimensions and JIS B 22-19771, basic reference table! ,
50 ~ 250
2. Basic dimensions refer to Figure 2 and Table 2
Dg 50. 65
Applicable medium
Sea water. PingshuiWww.bzxZ.net
Dg 80~250
China State Shipbuilding Corporation 1983-01-19 Issued 1983-05-0/Implementation
Standard Data Collector www.17bzW.cn Yiqi Standard Network provides free download of 100,000 standard books and data. Can type, 5 minutes fast self-service website building www.17jzw.com Yiqi website building network provides free website building platform, commercial website 1 year only 60 yuan Z
Nominal diameter structure size
CBM1106-22
Note, special requirements can provide full-face flange size
Marking example
Dg100 water tank air pipe head
Air pipe head 100
CBM1106-82
3. Material table 3 of main parts .
Parts name
Body cover
Guide bolt
Ductile iron
Nickel-chromium stainless steel
Aluminum bronze
Zinc iron
QT40-17
ICr18Ni9
QA29-2
Standard number
GB/348-78
GB/220-75
YB458-7
YB180-63
4After assembling the air pipe head, conduct a sealing test on the buoy and the sealing port. The test pressure is 3 water column height and the test lasts for 5 minutes. There should be no water shock, but small water leakage is allowed. 5. Other technical requirements G8600-82,
6 flange connection size CBM 1005-
Additional instructions:
This standard is proposed by the pipe system accessories group and is managed by Dalian Shipyard; this standard is drafted by Dalian Shipyard
The main drafter of this standard is Meijihua.
Standard data collector www.17bzW.cn Yiqi Standard Network provides free download of 100,000 standard books and data, can type, and quickly build a website in 5 minutes www.17jzw.com Yiqi website building network provides free website building platform, commercial website 1 year only 60 yuan
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 4122.2-1996 Packaging terms-Machinery
- GB/T 39623-2020 Quality testing and evaluation of fundamental geographic information database system
- GB 4706.10-1993 Special requirements for safe massage appliances for household and household appliances
- GB 15197-1994 Hygienic standard for refined edible vegetable oils
- GB/T 4549.3-2004 Railway vehicle vocabulary Part 3: Braking equipment
- GB/T 18816-2002 General technical requirements for marine heat exchangers
- GB/T 20242-2006 Acoustics—Procedures for the measurements of real-ear acoustical characteristics of hearing aids
- GB/Z 36046-2018 Evaluation specifications of electricity regulatory
- HG/T 2488-1993 Determination of tensile properties of rubber threads
- GB 16329-1996 Limits of deoxynivalenol in wheat, flour, corn and corn meal
- GB 16895.11-2001 Electrical installations in buildings Part 4: Safety protection Chapter 44: Overvoltage protection Section 442: Protection of low-voltage electrical installations against temporary overvoltages and faults between the high-voltage system and earth
- GB 3865-1983 Chinese pastry quality inspection method
- SJ 2804.2-1987 Method for determination of trace Nitrogen in electronic grade Argon-Concentration gas chromatographic method (Part two)
- JB/T 1118-2001 F1 type float valve
- JB/T 9036-1999 Sand and gravel washing machine
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com