
GB 19079.9-2005 Opening conditions and technical requirements for sports venues Part 9: Archery venues
time:
2024-08-05 21:02:43
- GB 19079.9-2005
- in force
Standard ID:
GB 19079.9-2005
Standard Name:
Opening conditions and technical requirements for sports venues Part 9: Archery venues
Chinese Name:
体育场所开放条件与技术要求 第9部分:射箭场所
Standard category:
National Standard (GB)
-
Date of Release:
2005-01-24 -
Date of Implementation:
2005-06-01
Standard ICS number:
Household and commercial equipment, recreation, sports >> 97.220 Sports equipment and facilitiesChina Standard Classification Number:
Light Industry, Culture and Living Goods>>Culture, Education, Sports and Entertainment Goods>>Y55 Sports Facilities and Equipment
publishing house:
China Standards PressISBN:
155066.1-22407Publication date:
2005-06-01Plan number:
20032355-Q-451
Release date:
2005-01-24Drafter:
Wang Ronghui, Chen Xueling, Zhou Yuan, Xiao Haopeng, Su Baosheng, Li Zhi, Shi Chunjian, Li MingqinDrafting Organization:
Beijing Sport University, Shooting and Archery Management Center of the State Sports General AdministrationFocal point Organization:
Sports Economics Department of the State Sports General AdministrationProposing Organization:
State Sports General AdministrationPublishing Department:
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Standardization Administration of ChinaCompetent Authority:
State Sports General Administration

Skip to download
Summary:
This part of GB 19079 stipulates the basic conditions and basic technical requirements for the opening of archery venues. This part applies to all types of archery venues open to the public. GB 19079.9-2005 Opening conditions and technical requirements for sports venues Part 9: Archery venues GB19079.9-2005 Standard download decompression password: www.bzxz.net

Some standard content:
ICS 97. 220
National Standard of the People's Republic of China
GB 19079.9—2005
Operation conditions and technical requirements for gymnasium and playgroundPart 9: Archery place
2005-01-24Promulgated
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of ChinaAdministrative Committee of Standardization of the People's Republic of China
2005-06-01Implementation
G319079&Operation conditions and technical requirements for sports venues are divided into the following parts:Part 1: Swimming places;
-----Part 2: Karting places:
Part 3 Bungee jumping places,
--Part 4: Rock climbing places;
---Part 5: Roller skating places
Part· Skiing places
Part 7: Skating places:
Part 8: Shooting places;
…Part 9· Archery places;
Part 10: Diving places
Part 11: Rafting places:
Part 12: Paragliding places:
Part 13: Hot air balloon places;
Part 14: Powered paragliding places;
This part is Part 9 of GB19079, and all the contents of this part are mandatory. This part is proposed by the State Sports General Administration.
This part is under the jurisdiction of the Sports Economics Department of the State Sports General Administration and is responsible for interpretation. The responsible drafting units of this part: Beijing Sport University, Shooting and Archery Management Center of the State Sports General Administration GB 19079.9--2005
The main drafters of this part: Qu Ronghui, Chen Xueling, Zhou Yuan, Xiao Haopeng, Su Baosheng, Li Zhi, Shi Chunjian and Li Mingqin. 1 Scope
Opening conditions and technical requirements for sports venues
Part 9: Archery venues
This part of GB 19079 specifies the basic conditions and basic technical requirements for archery venues. This part is applicable to all kinds of archery venues open to the public. 2 Normative references
GB 19079. 9—2005
The clauses in the following documents become the clauses of this standard through reference in this standard. For any referenced document with an H date, all subsequent amendments (excluding errata) or revisions are not applicable to this standard. However, the parties to an agreement based on this standard are encouraged to study whether the latest versions of these documents can be used. For any referenced document without a date, the latest version applies to this standard: GB9668 Hygiene standard for gymnasiums
GB/F17903 Hygiene standard for total number of bacteria in indoor air GB/T10001.1 Graphic symbols for public information for signs Part 1: General symbols 3 Terms and definitions
The following terms and definitions apply to this part of (H19079. 3.1
Archery place
A place where people can carry out archery training, competition, fitness and entertainment. It includes: indoor archery halls and outdoor archery ranges.
Archery instructor refers to a person who teaches archery theory and skills. 3.3
Shooting liae
When shooting, the true line where the archer steps with two feet apart or with both feet together is also called the starting line or the launching line. 3.4
1 m line 1 meler liae
is a line parallel to the launching line 1m behind the launching line. 3.5
refers to the distance from the vertical point from the center of each target to the ground to the outer edge of the launching line (including the line width). Qualifications of practitioners
Archery technical instructors and others should hold relevant national qualification certificates before they can take up their posts. 5 Site, facilities and equipment conditions
5.1.1 The shooting range shall not be less than 1cm.
GB 19079.92005
5.1.2 The width of the starting line of an indoor archery hall shall not be less than 0.8m. 5.1.3 The distance between two adjacent targets in an outdoor archery range shall not be less than 11m. The m-line markings are clear. 5.1.5 The target positions and both sides of the target wall in the indoor archery hall should be enclosed by walls or baffles, and there should be anti-penetration facilities. 5.1.6 The space behind the target positions and the outer side of the outermost target positions in the outdoor archery range should be clearly marked with products and have protective facilities. 5.2 Equipment
5.2.1 Each bow provided should have matching arrows, quivers, finger guards, arm guards and other equipment. 5.2.2 Each target should have a matching target stand or be fixed on the target wall and have a corresponding target number plate. 5.2.3 Bows and arrows should obtain product inspection certificates issued by professional and technical organizations that meet legal requirements. 5.3 Auxiliary facilities
5.3.1 Archery equipment has a special storage area. 5. 3. 2 There are men's and women's toilets.
5.3. 3 Indoor archery halls have emergency evacuation passages. 5.3.4 Public information signs must comply with the requirements of GB/T10001.1. 6 Hygiene and environmental management requirements
6.1 The hygiene of indoor archery halls should comply with the requirements of GB 9668. 6.2 The air quality of indoor archery halls should comply with the requirements of GB/T17093. 7 Safety assurance
7.1 There are "Instructions for Archery Personnel" and safety warnings in conspicuous locations. 7.2 First aid medicines and equipment should be placed in obvious locations for easy access. 7.3 Archery technical instructors should assume safety assurance responsibilities. 7.4 There are obvious signs for all types of personnel to take up their posts. www.bzxz.net
7.5 There is a sound security system, safety rescue, equipment maintenance system and personnel service post fee system.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
National Standard of the People's Republic of China
GB 19079.9—2005
Operation conditions and technical requirements for gymnasium and playgroundPart 9: Archery place
2005-01-24Promulgated
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of ChinaAdministrative Committee of Standardization of the People's Republic of China
2005-06-01Implementation
G319079&Operation conditions and technical requirements for sports venues are divided into the following parts:Part 1: Swimming places;
-----Part 2: Karting places:
Part 3 Bungee jumping places,
--Part 4: Rock climbing places;
---Part 5: Roller skating places
Part· Skiing places
Part 7: Skating places:
Part 8: Shooting places;
…Part 9· Archery places;
Part 10: Diving places
Part 11: Rafting places:
Part 12: Paragliding places:
Part 13: Hot air balloon places;
Part 14: Powered paragliding places;
This part is Part 9 of GB19079, and all the contents of this part are mandatory. This part is proposed by the State Sports General Administration.
This part is under the jurisdiction of the Sports Economics Department of the State Sports General Administration and is responsible for interpretation. The responsible drafting units of this part: Beijing Sport University, Shooting and Archery Management Center of the State Sports General Administration GB 19079.9--2005
The main drafters of this part: Qu Ronghui, Chen Xueling, Zhou Yuan, Xiao Haopeng, Su Baosheng, Li Zhi, Shi Chunjian and Li Mingqin. 1 Scope
Opening conditions and technical requirements for sports venues
Part 9: Archery venues
This part of GB 19079 specifies the basic conditions and basic technical requirements for archery venues. This part is applicable to all kinds of archery venues open to the public. 2 Normative references
GB 19079. 9—2005
The clauses in the following documents become the clauses of this standard through reference in this standard. For any referenced document with an H date, all subsequent amendments (excluding errata) or revisions are not applicable to this standard. However, the parties to an agreement based on this standard are encouraged to study whether the latest versions of these documents can be used. For any referenced document without a date, the latest version applies to this standard: GB9668 Hygiene standard for gymnasiums
GB/F17903 Hygiene standard for total number of bacteria in indoor air GB/T10001.1 Graphic symbols for public information for signs Part 1: General symbols 3 Terms and definitions
The following terms and definitions apply to this part of (H19079. 3.1
Archery place
A place where people can carry out archery training, competition, fitness and entertainment. It includes: indoor archery halls and outdoor archery ranges.
Archery instructor refers to a person who teaches archery theory and skills. 3.3
Shooting liae
When shooting, the true line where the archer steps with two feet apart or with both feet together is also called the starting line or the launching line. 3.4
1 m line 1 meler liae
is a line parallel to the launching line 1m behind the launching line. 3.5
refers to the distance from the vertical point from the center of each target to the ground to the outer edge of the launching line (including the line width). Qualifications of practitioners
Archery technical instructors and others should hold relevant national qualification certificates before they can take up their posts. 5 Site, facilities and equipment conditions
5.1.1 The shooting range shall not be less than 1cm.
GB 19079.92005
5.1.2 The width of the starting line of an indoor archery hall shall not be less than 0.8m. 5.1.3 The distance between two adjacent targets in an outdoor archery range shall not be less than 11m. The m-line markings are clear. 5.1.5 The target positions and both sides of the target wall in the indoor archery hall should be enclosed by walls or baffles, and there should be anti-penetration facilities. 5.1.6 The space behind the target positions and the outer side of the outermost target positions in the outdoor archery range should be clearly marked with products and have protective facilities. 5.2 Equipment
5.2.1 Each bow provided should have matching arrows, quivers, finger guards, arm guards and other equipment. 5.2.2 Each target should have a matching target stand or be fixed on the target wall and have a corresponding target number plate. 5.2.3 Bows and arrows should obtain product inspection certificates issued by professional and technical organizations that meet legal requirements. 5.3 Auxiliary facilities
5.3.1 Archery equipment has a special storage area. 5. 3. 2 There are men's and women's toilets.
5.3. 3 Indoor archery halls have emergency evacuation passages. 5.3.4 Public information signs must comply with the requirements of GB/T10001.1. 6 Hygiene and environmental management requirements
6.1 The hygiene of indoor archery halls should comply with the requirements of GB 9668. 6.2 The air quality of indoor archery halls should comply with the requirements of GB/T17093. 7 Safety assurance
7.1 There are "Instructions for Archery Personnel" and safety warnings in conspicuous locations. 7.2 First aid medicines and equipment should be placed in obvious locations for easy access. 7.3 Archery technical instructors should assume safety assurance responsibilities. 7.4 There are obvious signs for all types of personnel to take up their posts. www.bzxz.net
7.5 There is a sound security system, safety rescue, equipment maintenance system and personnel service post fee system.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.
- Recommended standards
- GB/T 15343-1994 Chemical analysis methods for talc
- JB/T 3550.1-1999 Cylinder boring machine parameters
- GB/T 3098.4-2000 Mechanical properties of fasteners - Nuts with fine pitch threads
- GB 10061-1988 Screen plants-Codification for designating perforations
- JB/T 9158.9-1999 Dimensions of cutting tool holder for horizontal multi-spindle automatic lathe
- JB/T 5335-1991 Basic technical requirements for DC motors for battery vehicles
- JB/T 7748-1995 Valve cleanliness and measurement methods
- HG 2636-2000 Grade Dicalcium Phosphate
- GB 15540-1995 Technical requirements and measurement methods for electromagnetic compatibility of land mobile communications equipment
- GB/T 2423.6-1995 Environmental testing for electric and electronic products Part 2: Test methods Test Eb and guidance: Bump
- SY 5670-1993 Petroleum and liquid petroleum products railway tank car transfer measurement procedures
- GB/T 11826-2002 Rotor flowmeter
- QB/T 2159-1995 儿童自行车整车通用技术条件
- JB/T 9163.1-1999 Gear Hobbing Fixture Dimensions
- NY/T 5174-2002 Technical regulations for the production of pollution-free litchi food
Please remember: "bzxz.net" is the combination of the first letters of the Chinese pinyin of the four Chinese characters "standard download" and the international top-level domain name ".net". ©2024 Standard download websitewww.bzxz.net Mail:bzxznet@163.com